HomeMy WebLinkAbout19951135 Ver 1_COMPLETE FILE_19951031State of North Carolina
Department of Environment,
Health and Natural Resources
Division of Environmental Management
James B, Hunt, Jr., Governor
Jonathan B. Howes, Secretary
A. Preston Howard, Jr„ P.E., Director
APPROVAL of 401 Water Quality Certification
Mr. James B. & Ms. Judith A. Upton
4015 Gypsum Hill Road
Haymarket, Virginia 22069
Dear Mr. & Ms. Upton:
FILE
You have our approval to place fill material in wetlands or waters for the purpose of placing rip-
rap along the shoreline on Roanoke Rapids Lake, as you described in your application dated 19
October 1995. After reviewing your application, we have decided that this fill is covered by General
Water Quality Certification Number 2665. This certification allows you to use Nationwide Permit
Number 13 when it is issued by the Corps of Engineers.
This approval is only valid for the purpose and design that you described in your application. If
you change your project, you must notify us and you may be required to send us a new application.
For this approval to be valid, you must follow the conditions listed in the attached certification. In
addition, you should get any other federal, state or local permits before you go ahead with your
project.
If you do not accept any of the conditions of this certification, you may ask for an adjudicatory
hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing,
send a written petition which conforms to Chapter 150B of the North Carolina General Statutes to the
Office of Administrative Hearings, P.O. Box 27447, Raleigh, N.C. 27611-7447. This certification and
its conditions are final and binding unless you ask for a hearing.
This letter completes the review of the Division of Environmental Management under Section 401
of the Clean Water Act. If you have any questions, please telephone John Domey at 919-733-1786.
Sincerely,
ston rd, Jr. P.
_1a
Attachment
cc: Wilmington District Corps of Engineers
Corps of Engineers Raleigh Field Office
Raleigh DEM Regional Office
Mr. John Dorney
Central Files
951135.1tr
FE Fl
November 1, 1995
Northampton County
DEM Project # 951135
P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-7015 FAX 919-733-2496
An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post-consumer paper
James B. & Judith A. Upton
4015 Gypsum Hill Road
Haymarket, VA 22069
19 October 1995
Water Quality Planning
Division of Environmental Management
NC Department of Environment, Health
and Natural Resources
4,01,1S,
L4
Attn: Mr. John Dorney
Post Office Box 29535
Raleigh, NC 27626-0535
Re: Permit for Bank Stabilization and Fill
Dear Mr. Dorney:
Enclosed are seven copies of my application for placing rip-rap along the shoreline of our
property on Roanoke Rapids Lake. I have also enclosed a copy of my 17 October letter
to Mr. Eric Alsmeyer, U. S. Corps of Engineers. We are planning to build our future
permanent residence on this lot, but desire to stabilize the bank prior to commencing
construction.
I thank you in advance for anything you can do to expedite the processing of this
application. Please call me should there be additional information I need to furnish.
Sincerely yours,
James B. Upton
Home: (703) 784-7843
Work (703) 406-7135
enclosures: as stated
James B. & Judith A. Upton
4015 Gypsum Hill Road
Haymarket, VA 22069
17 October 1995
U. S. Corps of Engineers
Raleigh Regulatory Field Office
Attn.: Mr. Eric Alsmeyer
6512 Falls of the Neuse Road
Raleigh, NC 27615
Re: Permit for Bank Stabilization and Fill
Dear Mr. Alsmeyer:
Enclosed please find an application for placing rip-rap along my shoreline. I have an
approximate 13 ft. drop from the existing bank to water and/or shoreline (depending on
the lake level). The Bank is unstable and eroding badly. We propose to stabilize the
bank by placing clean rock along the bank with a gradual slope toward the water. It is
our desire to do this prior to beginning construction of our future permanent residence.
Also enclosed is a plat of our lot. As you will note, our property lines extend into the
water due to the erosion of the bank. I have shown on the plat the proposed placement of
rip-rap and have included several photographs of the property for your review.
I would appreciate your looking over our application and letting us know if additional
information is needed. I am aware that seven (7) copies need to be sent to NC-DEM, and
will forward those copies in the immediate future.
Thank you for your attention to this matter, and I look forward to hearing from you soon.
Sincerely yours,
James B. Upton
Home: (703) 784-7843
Work (703) 406-7135
enclosures: as stated
DEM ID: q5 ) ?5j ACTION ID:_
Nationwide Permit Requested (Provide Nationwide Permit #):
JOINT FORM FOR
WILMINGTON DISTRICT ENGINEER
CORPS OF ENGINEERS
DEPARTMENT OF THE ARMY
P.O. Box 1890
Wilmington, NC 28402-1890
ATTN: CESAW-CO-E
Telephone (919) 251-4511
WATER QUALITY PLANNING
DIVISION OF ENVIRONMENTAL MANAGEMENT
NC DEPARTMENT OF ENVIRO M M
AND NATURAL RESOURCES U
P.O. Box 29535 ¢
Raleigh, NC 27626-0535 , F °
ATTN: MR. JOHN DORNEY OCT z 4 1995?
Telephone (919) 733-5083 1
ONE (1) COPY OF THIS COMPLETED APPLICATION SHOULD BE SENT TO THE CQ..?t N. S GRQU
SEVEN (7) COPIES SHOULD BE SENT TO THE N.C. DIVISION OF ENVIRONMENTAL MANN;
PLEASE PRINT
1. Owners Name: James B. and Judith A. Upton
2. Owners Address: 4015 Gypsum Hill Road, Haymarket, VA 22069
3. Owners Phone Number (Home): (703) 754-7843 (Work): (703) 406-7135
4. If Applicable: Agent's name or responsible corporate official, address, phone number.
5. Location of work (MUST ATTACH MAP). County:
Nearest Town or City: Gaston
Specific Location (Include road numbers, landmarks, etc.):
Turn left into Tillar Plantation on Plantation Drive.
Timber Hill Court. Lot 5 on right at end of Court.
Northampton
Take Route 46 West approx. 6 miles from Gaston.
Take 1st left on Wood Duck Drive. Take next left on
6. Name of Closest Stream/River: Roanoke Rapids Lake
7. River Basin: Roanoke River
8. Is this project located in a watershed classified as Trout, SA, HQW, ORW, WSI, or WS IT? YES [ ] NO [ X ]
9. Have any Section 404 permits been previously requested for use on this property? YES [ ] NO [ X ]
If yes, Explain.
10. Estimated total number of acres of waters of the U. S., including wetlands, located on project site:
11. Number of acres of waters of the U.S., including wetlands, impacted by the proposed project:
Filled:
Drained:
Flooded:
Excavated:
Total Impacted:
401 iSsUEt)
Nationwide permits that require notification to the Corps of Engineers
Nationwide permits that require application for Section 401 certification
.Jr
12. Description of proposed work (Attach PLANS-8 1/2"X11" Drawings only): Place clean rock (rip-rap) into
water by placement of rock against bank and gradually bringing it down into water to stabilize the
shoreline. (See Plat.)
13. Purpose of proposed work: To stabilize shoreline and reduce drop-off to a gradual decline from the
bank.
14. State reasons why the applicant believes that this activity must be carried out in wetlands. Also note measures
taken to minimize whetland impacts. The shoreline needs to be stablized to prevent more of the land from
eroding. (See plat-property line in water).
15 You are required to contact the U. S. Fish and Wildlife Service (USFWS) and/or National Marine Fisheries Service
(NMFS) regarding the presence of any Federally listed or proposed for listing endangered or threatened species or critical
habitat in the permit area that may be affected by the proposed project. Have you done so? YES [ } NO [ X ]
RESPONSES FROM THE USFWS AND/OR NMFS SHOULD BE FORWARDED TO THE CORPS.
16. You are required to contact the State Historic Preservation Officer (SHPO) regarding the presence of historic
properties in the permit area which may be affected by the proposed project? Have you done so? YES [ X ] NO [ ]
RESPONSE FROM THE SHPO SHOULD BE FORWARDED TO CORPS.
17. Additional information required by DEM:
A. Whetland delineation map showing all wetlands, streams, and lakes on the property.
B. If available, representative photograph of whetlands to be impacted by project.
C. If delineation was performed by a consultant, include all data sheets relevant to the placement of the
delineation line.
D. If a stormwater management plan is required for this project, attach copy.
E. What is land use of surrounding property? Subdivision for single family homes.
F. If applicable, what is proposed method of sewage disposal? Septic Tank (installed).
Signature Date
Joins Leh
a
? g S
o ?` I f
0\
> i » J
A r o 5??? rm
? N \
ie 1 g e °?
Lfu?
`St 9 ?_ " _ a
= 3 M4
s -
> H t
a 1 ? .? `sue,
! ; s > O O ''!f 1
S r 3 s `y I ''?4 1 'r•
lei
M z
G
AM4 DD y of W,4Y?n T = Y? ° N x . ^ tJ x t y . 3
Tt 3Q
Eft?
SYS
a ?c ?_ t? o ;? _ ? :d? '• rrrr?r ? Y I ? ?. ? ? vE; f ,
?? _ I _ •. i
QpCESAPEAIC£ BAY III
i 1 may, ``d t?l
Lr 5? 0
ATE
m c n °'
ss-ssroo- -*+
.,a ,
?R
ooz
a?
i
osr`
s 4p
0
I
I
\o ? 2oc
1
I
I
\ oo
I
I QJ t
I 6
I '
I
I
I '
I
1 '
1
1
i
I
a
I
r
I
i
i
v /
1
9e
O6t--?- 06T 1 A
1 r'
06 '
I '
osr \ i opt
\ ?I
I
04 '
? oa
I
I
o?r? 1
I '
I osr
\ 1 // 1
no 1
I '
osr
I I
1
1 0 ?? o?F
s?
16° I
1
ZVi v _ ??une
D osr osi -
p
---------------------------
1/ . (.J EO"'9i r.8LBg5g q
?CSc?oQb
1
t_><
I
1
V_. 1
o?
1
1
? c
-? osr-
' ost
I
I
1
0
0