Loading...
HomeMy WebLinkAboutNCG030235_NOV Resolution Inspection_20190910ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Director Saft America Inc Attention: William 0. Wildes, Jr. 313 Crescent Street Valdese, North Carolina 28690 NORTH CAROLINA Environmental Quality September 10, 2019 Subject: Compliance Evaluation Inspection I'7�Ti'Sii��illlZlXi1Z1I1Z1] Certificate of Coverage: NCG030235 Burke County, North Carolina Dear Mr. Wildes: Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspection I conducted at the subject facility on September 5, 2019. The report should be self-explanatory, however, should you have any questions concerning this report, please do not hesitate to contact me at (828) 296-4500 or by email at Isaiah.reed@ncdenr.gov. Sincer Isaiah Reed, CPS CEPSCI, MS4CECI Environmental Specialist Land Quality Section Enclosure: Inspection Report D_EQZ� North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Asheville Regional Office 12090 U.S. Highway 70 1 Swannanoa, North Carolina 28778 IJCfi1H CP!#N1NP 828,296.4500 Compliance Inspection Report Permit: NCG030235 Effective: 11/01/18 Expiration: 05/31/21 Owner: SaitAmericalnc SOC: Effective: Expiration: Facility: Saft America Incorporated County: Burke Crescent St Region: Asheville Valdese NC 28690 Contact Person: Beth Anderson Title: Phone: 828-879-5052 Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 09/05/2019 Primary Inspector: Isaiah L Reed Secondary Inspector(s): Certification: Phone: EntryTime: 11:OOAM Exit Time: 01:OOPM Phone: 828-296-4614 Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Metal Fabrication Stormwater Discharge COC Facility Status: Compliant Not Compliant Question Areas: Storm water (See attachment summary) Page 1 of 3 Permit: NCG030235 Owner- Facility: Saft America Inc Inspection Date: 09/05/2019 Inspection Type : Compliance Evaluation Reason for Visit: Routine Inspection Summary: On September 5, 2019 this facility was inspected for compliance. I met with Richard Boyens, William Wildes, and Mary Lyons on site. No major issues were noted during the inspection, and the issues noted in the Notice of Violation have been addressed. the Notice of Violation is resolved. The following additional notes were made during the inspection: 1) The location of 1 or more of the outfalls may be off the property. The permittee is directed to confirm the location of the outfalls and obtain any permission that may be needed for continued monitoring. 2) Stabilization may be needed to prevent erosion at the outfall locations. 3) Continued investigation of potential sources for Zinc exceedances is needed. If you have any questions, please contact this office at (828) 296-4614 Page 2 of 3 Permit: NCG030235 Owner- Facility: Saft America Inc Inspection Date: 09/05/2019 Inspection Type : Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? 0 ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? 0 ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? 0 ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? 0 ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? 0 ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? N ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? 0 ❑ ❑ ❑ # Does the Plan include a BMP summary? 0 ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? 0 ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? E ❑ ❑ ❑ # Does the facility provide and document Employee Training? 0 ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? 0 ❑ ❑ ❑ # Is the Plan reviewed and updated annually? 0 ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? 0 ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? 0 ❑ ❑ ❑ Comment Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? N ❑ ❑ ❑ Comment: Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? 0 ❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? 1111 ❑ Comment: Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? E ❑ ❑ ❑ # Were all outfalls observed during the inspection? E ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ 0 ❑ # Has the facility evaluated all illicit (non stormwater) discharges? 0 ❑ ❑ ❑ Comment: Page 3 of 3