Loading...
HomeMy WebLinkAboutNCG080973_Revised OD ASH NOI Page 2 of 4_20190909NCG080000 N.O.I. 3) Physical Location Information: Please provide a narrative description of how to get to the facility (use street names, state road numbers, and distance and direction from a roadway intersection). From downtown Asheville, NC, head E on S Pack Square toward S Market St; turn right onto Market St 0.3mi; turn left onto Biltmore Ave 0.2mi; turn right onto Soulhside Ave 0 4mi; use the left two lanes to turn left onto McDowell St 1.5mi; continue on All Souls Crescent; All Souls Crescent becomes Hendersonville Rd 6.2mi (A copy of a county map or USGS quad sheet with facility clearly located must be submitted with this application) 4) Latitude 35, 28, 52.25 Longitude 82, 31, 23.18 5) This NPDES Permit Application applies to which of the following: ❑ New or Proposed Facility P Existing 6) Standard Industrial Classification: (deg, min, sec) Date operation is to begin April 1, 2019 Provide the 4-digit Standard Industrial Classification Code (SIC Code) that describes the primary industrial activity at this facility SIC Code: 4 2 1 3 7) Provide a brief narrative description of the types of industrial activities and products manufactured at facility: Motor freight transportation facility with vendor washing activities and storage of vehicle fluids in drums. 8) Discharge points / Receiving waters: How many discharge points (ditches, pipes, channels, etc.) convey stormwater from the property? 1 What is the name of the body or bodies of water (creek, stream, river, lake, etc.) that the facility stormwater discharges end up in? Lake Julian Receiving water classification: c class water body Is this a 303(d) listed stream? No Has a TMDL been approved for this watershed? N/A If the site stormwater discharges to a separate storm sewer system, name the operator of the separate storm sewer system (e.g. City of Raleigh municipal storm sewer). N/A List discharge points (outfalls) that convey discharge from the site (both on -site and off -site) and location coordinates. Attach additional sheets if necessary, or note that this information is specified on the site plan. Stormwater Outfall No. 001 Latitude (degrees/minutes/seconds): 35/28/50.07 N Longitude (degrees/minutes/seconds): 82/31/22.46 W Stormwater Outfall No. Latitude (degrees/minutes/seconds): N Longitude (degrees/minutes/seconds): W Stormwater Outfall No. Latitude (degrees/minutes/seconds): N Longitude (degrees/minutes/seconds): W Stormwater Outfall No. Latitude (degrees/minutes/seconds): N Longitude (degrees/minutes/seconds): W Stormwater Outfall No. Latitude (degrees/minutes/seconds): N Longitude (degrees/minutes/seconds): W Page 2 of 4 SWU-223-071408 Last revised 6/24/14