Loading...
HomeMy WebLinkAboutNC0060593_Inspection_20190903ROY COOPER Governor MICHAEL S. REGAN Secretary LINDA CULPEPPER Director Mr. Shannon V. Becker, President Aqua North Carolina, Inc. 202 Mackenan Court Cary, North Carolina 27511 Dear Mr. Becker: NORTH CAROLINA Environmental Quality 3 September 2019 Subject: Compliance Evaluation Inspection Spinnaker Bay Condominiums WWTP NPDES Permit No. NCO060593 Catawba County Enclosed is a copy of the Compliance Evaluation Inspection Report for the inspection conducted at the subject facility on August 27, 2019, by Mr. Wes Bell of this Office. Please inform the facility's Operator -in -Responsible Charge (ORC) of our findings by forwarding a copy of the enclosed report. The report should be self-explanatory; however, should you have any questions concerning this report, please do not hesitate to contact Mr. Bell at (704) 235-2192 or at wes.bell@ncdenr.gov. Sincerely, DocuSiignneed by: A14CC681AF27425... / W. Corey Basinger, Regional Supervisor Water Quality Regional Operations Section Division of Water Resources, NCDEQ Enclosure: Inspection Report D Q � North Carolina Department of Environmental Quality I Division of Water Resources Mooresville Regional Office 1 610 East Center Avenue, Suite 301 1 Mooresville, North Carolina 28115 NORTH CAROLINA Da"MoM a enWmn�bl mwnq 704,663.1699 United States Environmental Protection Agency Form Approved. EPA Washington, D.C. 20460 OMB No. 2040-0057 Water Compliance Inspection Report Approval expires 8-31-98 Section A: National Data System Coding (i.e., PCS) Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type 1 IN 2 15 1 3 I NCO060593 111 12 I 19/08/27 I17 18 I S I 19 I G I 201 I 211111 I I I I I I II I I I I I I I I I I I I I I I I I I I I I I I II I I I I I f6 Inspection Work Days Facility Self -Monitoring Evaluation Rating B1 QA ---------------------- Reserved ------------------- 67 2.0 70 71 [.. I 72 73 L_LJ74 751 I I I I I I I80 u u Section B: Facility Data Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include Entry Time/Date Permit Effective Date POTW name and NPDES oermit Number) 09:15AM 19/08/27 15/05/01 Spinnaker Bay WWTP NCSR 1844 Exit Time/Date Permit Expiration Date Sherrills Ford INC 28673 10:20AM 19/08/27 20/04/30 Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s) Other Facility Data Dustin Allen Hester/ORC/704-507-8535/ Name, Address of Responsible Official/Title/Phone and Fax Number Contacted Shannon V Becker,202 Mackenan Ct Cary NC 27511/President/919-653-5570/ No Section C: Areas Evaluated During Inspection (Check only those areas evaluated) Permit Flow Measurement Operations & Maintenance Records/Reports Self -Monitoring Program Sludge Handling Disposal Facility Site Review Effluent/Receiving Waters Laboratory Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) (See attachment summary) Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date EDoby: 9/3/2019 Wes Bell �� �� MRO WQ//704-663-1699 Ext.2192/ A61 e96D90CC3437... Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date W. Corey Basinger Division of Water Quality//704-2' EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete. DocuSigned by: ' 9/3/2019 AtaccsatAi=z7azs... Page# NPDES yr/mo/day Inspection Type NCO060593 I11 121 19/08/27 117 18 JCJ Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) Page# Permit: NCO060593 Owner - Facility: Spinnaker Bay WWTP Inspection Date: 08/27/2019 Inspection Type: Compliance Evaluation Permit Yes No NA NE (If the present permit expires in 6 months or less). Has the permittee submitted a new ❑ ❑ 0 ❑ application? Is the facility as described in the permit? 0 ❑ ❑ ❑ # Are there any special conditions for the permit? 0 ❑ ❑ ❑ Is access to the plant site restricted to the general public? 0 ❑ ❑ ❑ Is the inspector granted access to all areas for inspection? 0 ❑ ❑ ❑ Comment: Overall, the facility is adequately described in the Permit; however, the facility is not equipped with equalization basins. The facility description will need to be updated during the next Permit renewal process. The last compliance evaluation inspection by DWR staff was performed on 6/13/16. Record Keeping Yes No NA NE Are records kept and maintained as required by the permit? 0 ❑ ❑ ❑ Is all required information readily available, complete and current? 0 ❑ ❑ ❑ Are all records maintained for 3 years (lab. reg. required 5 years)? ❑ ❑ ❑ Are analytical results consistent with data reported on DMRs? 0 ❑ ❑ ❑ Is the chain -of -custody complete? 0 ❑ ❑ ❑ Dates, times and location of sampling Name of individual performing the sampling Results of analysis and calibration Dates of analysis Name of person performing analyses Transported COCs Are DMRs complete: do they include all permit parameters? ❑ ❑ ❑ Has the facility submitted its annual compliance report to users and DWQ? ❑ ❑ ❑ (If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified operator ❑ ❑ ❑ on each shift? Is the ORC visitation log available and current? ❑ ❑ ❑ Is the ORC certified at grade equal to or higher than the facility classification? ❑ ❑ ❑ Is the backup operator certified at one grade less or greater than the facility classification? ❑ ❑ ❑ Is a copy of the current NPDES permit available on site? ❑ ❑ ❑ Facility has copy of previous year's Annual Report on file for review? ❑ ❑ 0 ❑ Comment: The records reviewed during the inspection were organized and well maintained. Discharge Monitoring Reports (eDMRs) were reviewed for the period July 2018 through June 2019. No effluent limit violations were reported and all monitoring frequencies were correct. Page# 3 Permit: NCO060593 Owner - Facility: Spinnaker Bay WWTP Inspection Date: 08/27/2019 Inspection Type: Compliance Evaluation Laboratory Yes No NA NE Are field parameters performed by certified personnel or laboratory? 0 ❑ ❑ ❑ Are all other parameters(excluding field parameters) performed by a certified lab? 0 ❑ ❑ ❑ # Is the facility using a contract lab? 0 ❑ ❑ ❑ # Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees ❑ ❑ 0 ❑ Celsius)? Incubator (Fecal Coliform) set to 44.5 degrees Celsius+/- 0.2 degrees? ❑ ❑ 0 ❑ Incubator (BOD) set to 20.0 degrees Celsius +/- 1.0 degrees? ❑ ❑ 0 ❑ Comment: On -site field analyses (dissolved oxygen, pH, temperature, total residual chlorine) are performed under Aqua NC's laboratory certification #5035. Water Tech Labs (all permit parameters except field) has also been contracted to provide analytical support. Effluent Sampling Yes No NA NE Is composite sampling flow proportional? ❑ ❑ 0 ❑ Is sample collected below all treatment units? 0 ❑ ❑ ❑ Is proper volume collected? 0 ❑ ❑ ❑ Is the tubing clean? ❑ ❑ 0 ❑ # Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees ❑ ❑ 0 ❑ Celsius)? Is the facility sampling performed as required by the permit (frequency, sampling type ❑ ❑ ❑ representative)? Comment: The subject permit requires effluent grab samples. Operations & Maintenance Yes No NA NE Is the plant generally clean with acceptable housekeeping? 0 ❑ ❑ ❑ Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable ❑ ❑ ❑ Solids, pH, DO, Sludge Judge, and other that are applicable? Comment: The wastewater treatment facility appeared to be properly operated and well maintained. Process control measurements were being documented and maintained on -site. Bar Screens Yes No NA NE Type of bar screen a.Manual b.Mechanical ❑ Are the bars adequately screening debris? M ❑ ❑ ❑ Is the screen free of excessive debris? 0 ❑ ❑ ❑ Is disposal of screening in compliance? 0 ❑ ❑ ❑ Page# 4 Permit: NCO060593 Inspection Date: 08/27/2019 Bar Screens Is the unit in good condition? Owner - Facility: Spinnaker Bay WWTP Inspection Type: Compliance Evaluation Yes No NA NE ■ ❑ ❑ ❑ Comment: Screenings are transported to the Hwy. 150 WWTP's dumpster and ultimately disposed at the County Landfill by a contracted company. Aeration Basins Mode of operation Type of aeration system Is the basin free of dead spots? Are surface aerators and mixers operational? Are the diffusers operational? Is the foam the proper color for the treatment process? Does the foam cover less than 25% of the basin's surface? Is the DO level acceptable? Is the DO level acceptable?(1.0 to 3.0 mg/1) Yes No NA NE Ext. Air Diffused ■ ❑ ❑ ❑ ❑ ❑ ■ ❑ ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ ❑ ❑ ❑ ■ ❑ ❑ ❑ ❑ ❑ ■ ❑ Comment: Soda ash is added on an as -needed basis to maintain appropriate alkalinity/pH levels. Secondary Clarifier Yes No NA NE Is the clarifier free of black and odorous wastewater? 0 ❑ ❑ ❑ Is the site free of excessive buildup of solids in center well of circular clarifier? ❑ ❑ 0 ❑ Are weirs level? 0 ❑ ❑ ❑ Is the site free of weir blockage? 0 ❑ ❑ ❑ Is the site free of evidence of short-circuiting? 0 ❑ ❑ ❑ Is scum removal adequate? 0 ❑ ❑ ❑ Is the site free of excessive floating sludge? 0 ❑ ❑ ❑ Is the drive unit operational? ❑ ❑ 0 ❑ Is the return rate acceptable (low turbulence)? 0 ❑ ❑ ❑ Is the overflow clear of excessive solids/pin floc? 0 ❑ ❑ ❑ Is the sludge blanket level acceptable? (Approximately'/4 of the sidewall depth) 0 ❑ ❑ ❑ Comment: Disinfection -Tablet Yes No NA NE Are tablet chlorinators operational? 0 ❑ ❑ ❑ Are the tablets the proper size and type? 0 ❑ ❑ ❑ Number of tubes in use? 1 Page# 5 Permit: NCO060593 Owner - Facility: Spinnaker Bay WWTP Inspection Date: 08/27/2019 Inspection Type: Compliance Evaluation Disinfection -Tablet Yes No NA NE Is the level of chlorine residual acceptable? 0 ❑ ❑ ❑ Is the contact chamber free of growth, or sludge buildup? 0 ❑ ❑ ❑ Is there chlorine residual prior to de -chlorination? 0 ❑ ❑ ❑ Comment: De -chlorination Yes No NA NE Type of system ? Tablet Is the feed ratio proportional to chlorine amount (1 to 1)? ❑ ❑ 0 ❑ Is storage appropriate for cylinders? ❑ ❑ 0 ❑ # Is de -chlorination substance stored away from chlorine containers? ❑ ❑ 0 ❑ Comment: Are the tablets the proper size and type? 0 ❑ ❑ ❑ Are tablet de -chlorinators operational? 0 ❑ ❑ ❑ Number of tubes in use? 2 Comment: Flow Measurement - Effluent Yes No NA NE # Is flow meter used for reporting? 0 ❑ ❑ ❑ Is flow meter calibrated annually? 0 ❑ ❑ ❑ Is the flow meter operational? 0 ❑ ❑ ❑ (If units are separated) Does the chart recorder match the flow meter? ❑ ❑ 0 ❑ Comment: The flow meter was last calibrated/verified by the ORC on 8/27/18. Following discussions with the ORC regarding flow meter calibrations, this Office is concerned with the level of training and lack of instrumentation (proper staff gauges, etc.) used to perform these calibrations. The Permittee must ensure that all Aqua staff involved with flow meter calibrations are properly trained and equipped to do these calibrations. Effluent Pipe Yes No NA NE Is right of way to the outfall properly maintained? ❑ ❑ ❑ Are the receiving water free of foam other than trace amounts and other debris? ❑ ❑ ❑ If effluent (diffuser pipes are required) are they operating properly? ❑ ❑ 0 ❑ Comment: The effluent appeared clear with no floatable solids or foam. The effluent is discharged into the receiving stream via submerged outfall. Page# 6 Permit: NCO060593 Inspection Date: 08/27/2019 Owner - Facility: Spinnaker Bay WWTP Inspection Type: Compliance Evaluation Aerobic Digester Yes No NA NE Is the capacity adequate? 0 ❑ ❑ ❑ Is the mixing adequate? 0 ❑ ❑ ❑ Is the site free of excessive foaming in the tank? 0 ❑ ❑ ❑ # Is the odor acceptable? M ❑ ❑ ❑ # Is tankage available for properly waste sludge? 0 ❑ ❑ ❑ Comment: Wastewater solids are removed on an as -needed basis by a contracted company (currently Rick's Septic Tank Service). Standby Power Is automatically activated standby power available? Is the generator tested by interrupting primary power source? Is the generator tested under load? Was generator tested & operational during the inspection? Do the generator(s) have adequate capacity to operate the entire wastewater site? Is there an emergency agreement with a fuel vendor for extended run on back-up power? Is the generator fuel level monitored? Yes No NA NE • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ ■ ❑ ❑ ❑ ❑ ❑ ❑ ■ ❑ ❑ ❑ Comment: The generator is exercised automatically on a weekly basis. The ORC also exercises the generator monthly and places the generator under load on a quarterly basis. Aqua NC contracts a company (Palmer Generator) to service the generator. Page# 7