HomeMy WebLinkAbout520014_30-Day POA_20190909PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number:
52 - 14
Facility Name: B&S Turner Farm
Certified Operator Name: Billie Turner
County: Jones
Operator # 16838
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6
Lagoon Name/Identifier (ID): _1 __2
Spillway (Yes or No)
Level (inches):
—no _ no
—24 -- — 25
2. Check all applicable items
,Liquid levei is within fne .aes igned-strtictural%freeboard elevations o+:'on:: i.r more structure:;. Five
and 30 day Plans of Action are attached. Hydraulic and agrorornic baances -ire within
accep'tab!- ranges.
X_ Liquid level is %-. 'lin the 25 year 24 hour storm elevations for -ne or m:-)re structur,,�s. A 30 day
Plan. of Action attached. Agronomic balance is within acct +a_")! : range.
'Vesta to be �n _.e ; I " d +o off site ljcePAN+ +
p!. z �.n.a „au eu tions Volu;�r,. a:r� content o ,vustE tc
pumped and hauled is reflected in section Id tables. Included within this plan is a li:.t of the
i)reposed sites with related facility number(s), number acres and receiving crop information.
Contact and secure approval from the Division of Water Quality Pri�!r-to'transfer of waste
to a site not covered in the facility's certified animal waste management plan.
Operation will be partially or fully depopulated.
- attach a complete schedule with corresponding animal units and dates for depopulation
- if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste: 9/16/2019
hereby certify that I have reviewed the information listed above and included within the attached Plan
of Action, and to the best of my knowledge and ability, the information is accurate and correct.
Billie Raye Turner Phone: 252-939-5024
Facility Owner/Manager (print)
L Date:9/9/2019
Facility Owner/Man er (signature)
PoA Cover Page 2/21/00
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24
HR. STORM
STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1.
Structure ID: 1
line m =
-55 lb PAN
2.
Structure ID: 2
line m = 329.9 lb PAN
3.
Structure ID:
line m =
lb PAN
4.
Structure ID:
line m =
lb PAN
5.
Structure ID:
line m =
lb PAN
6.
Structure ID:
line m =
lb PAN
n. lines I + 2 + 3 + 4 + 5 + 6 = .275.1lbPAN
lil. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD.
o. tract #
p. field #
q. r;rop
r. acres
s. remaining IRR
2 PAN balance
(lb/acre)
t. TOTAL PAN
BALANCE FOR
FIELD (lbs.)
column r x s
u. application window'
�73
1
Coastal Bermuda hay
6.96
148.28
1032.0
3/1 - 9/30
73
2
Coastal Bermuda hav
0.66
126.09
83.2
3/1 - 9/30
73
3
Coastal Bermuda hay
19.07
113.04
2155.7
3/1 9/30
1 73
4
Coastal Bel muda hav
0.97
275.00
266.8
3/1 - 9/30
73
5
Coastal Bermuda hay
8.06
3/1 - 9/30
73
6
Coastal Bermuda hay
4.28
3/1 - 9/30
73
7
Coastal Bermuda hay
4.12
3/1 - 9/30
Z+
'State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) = 3537.7 lb. PAN
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section II) = 275.1 lb. PAN
PoA (30 Day) 2/21/00
x. Crop's remaining PAN balance (line v from section III) = 3537.7 lb. PAN
y. Overall PAN balance (w - x) _ -3263 lb. PAN
Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and
haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN
based on new information. If new fields are to be included as an option for lowering lagoon level, add these
fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to
another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the
receiving facility.
Farm has adequate PAN deficit at this time to land apply waste. Due to recent rainfall over the past two weeks
including rain from Hurricane Dorian, sprayfields have been saturated, and operation has not been able to
irrigate. Given no more rainfall, anticipates resuming irrigation and did begin pumping on 9/16/19.
POA based on waste analysis dated 9/30/19.
This thirty -day POA was prepared by Kyle Smith with Jones Co. SWCD.
PoA (30 Day) 2/21/00
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): 11
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker 24.0 inches
b. designed 25 yr./24 hr. storm & structural freeboard 19.5 inches
c. line b - line a (inches in red zone) _ -5 inches
d. top of dike surface area according to design
(area at below structural freeboard elevation) 87804 ft2
e. line c/12 x line d x 7.48 gallons/ft'-246290 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design _ 180 days
g. volume of waste produced according to structural design 116047 ft3
h. current herd # 3520 certified herd #1 3520
actual waste produced = current herd # x line g =
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 1 9/30/2019
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
116047 ft'
0 ft3
53322.5 ft3
211147 gallons
1.56 Ibs/1000 gal.
-55 Ibs. PAN
PoA (30 Day) 2/21/00
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): 2
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker 25.0 inches
b. designed 25 yr./24 hr. storm & structural freeboard 27.0 inches
c. line b - line a (inches in red zone) = 2.0 inches
d. top of dike surface area according to design
(area at below structural freeboard elevation) 1 6 5001 ft2
e. line c/12 x line d x 7.48 gallons/ft3 80410 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 58023 ft3
n. current herd # 1760 certified herd #E 1760
actual waste produced = current herd # x line g =
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 1 8/30/2019
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
58023 fts
ft3
55094 ft3
141019 gallons
1.49 Ibs/1000 gal.
329.9 Ibs. PAN