Loading...
HomeMy WebLinkAbout20061214 Ver 2_Stormwater Info_20070301NCDENR-DWQ Attn: Ms. Cyndi Karoly 2321 Crabtree Blvd. Parkview Building Raleigh, NC 27604 Environmental Consultants, PA ;Road Raleigh, North Carolina 27614 Phone: (919) 846-5900 Fax: (919) 846-9467 RE: Stormwater Management Plan for Recreation Tract for Woodcreek (formerly Wild Acres) Wake County Dear Ms. Karoly: On January 31, 2007 we received a 401 Approval - MODIFICATION to impact 0.49 acres of wetland (0.37 acres permanent impacts, 0.12 acres temporary impacts), 345 linear feet of perennial stream (255 linear feet permanent impacts, 901inear feet temporary impacts), 231 linear feet of intermittent stream (209 linear feet permanent impacts, 22 linear feet temporary impacts) and 43,348 square feet of protected Zone 1 Neuse River basin Riparian buffer and 27,817 square feet of protected Zone 2 Neuse River basin Riparian buffer. Per Condition No. 7 of the Modified 401 Approval, we are required to submit a final, written Stormwater Management Plan for the Recreation Tract prior to any permanent building or other structures occupying the subject site. Please fmd enclosed five (5) copies of the Stormwater Management Plan for the Recreation Tract for your review and approval. Please call me at if you have any questions. - - ~, Sincerely; " ~` ~~ s" ~.. ~ .. ~ n,~-~J~ ~ „ ` .~ n icole Thoms n Regulatory Specialist "' ~' ` E ' '` ` " ~ ' a .c ~ Attachments: 5 copies of the Woodcreek Amenity Center Stormwater Management Plan 5 copies of the Extended Detention Wetland Worksheet 5 copies of the signed Operations & Maintenance Agreement Charlotte Office: 236 LePhillip Court, Suite C Concord, NC 28025 Phone: (704)720-9405 Fax: (704)720-9406 Greensboro Office: 381.7-E Lawndale Drive Greensboro, NC 27455 Phone: (336)540-8234 Fax: (336)540-8235 February 28, 2007 S&EC Project # 9615.w1 DWQ Project No. 06-1214, Ver. 2 WETLAND DETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT - Woodcreek -Amenity Center Phase - The wetland detention basin system is defined as the wetland detention basin, pretreatment including forebays and the vegetated filter if one is provided. Maintenance activities shall be performed as follows: After every significant runoff producing rainfall event and at least monthly: a. Inspect the wetland detention basin system for sediment accumulation, erosion, trash accumulation, vegetated cover, and general condition. b. Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within 2 to 5 days as designed. 2. Repair eroded areas immediately, re-seed as necessary to maintain good vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash as needed. 3. Inspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to maintain proper functioning. 4. Remove accumulated sediment from the wetland detention basin system semi-annually or when depth is reduced to 75% of the original design depth (see diagram below). Removed sediment shall be disposed of in an appropriate manner and shall be handled in a manner that will not adversely impact water quality (i.e. stockpiling near a wetland detention basin or stream, etc.). The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. If the elevation of the marsh areas exceed the permanent pool elevation, the sediment should be removed to design levels. This shall be performed by removing the upper 6 inches of soil and stockpiling it. Then the marsh area shall be excavated six inches below design elevations. Afterwards the stockpiled soil should be spread over the marsh surface. The soil should not be stockpiled for more than two weeks. When the permanent pool depth reads 1.50 feet in the micro-pool, the sediment shall be removed. BASIN DIAGRAM (fill in the blanks) Permanent Pool Elevation 366.0 Sediment Removal EI. 364.5 --------------i-- Sediment Removal Elevation N/A ,~ 75% ----------------------- - ------ Bottom E vation 364.0 5% -------------------- • , FOREBAY/micro-pool MAIN POND 5. Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface. These plants shall be encouraged to grow along the vegetated shelf and forebay berm. Wetland planting densities in the marsh areas should be maintained by replanting bare areas as needed. Wetland plants should be encouraged to grow in the marsh areas. Page 1 of 2 6. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain shall be minimized to the maximum extent practical. 7. All components of the wetland detention basin system shall be maintained in good working order. 8. Level spreaders or other structures that provide diffuse flow shall be maintained every six months. All accumulated sediment and debris shall be removed from the structure, and a level elevation shall be maintained across the entire flow spreading structure. Any down gradient erosion must be repaired and/or replanted as necessary. I acknowledge and agree by my signature below that I am responsible for the performance of the seven maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print name: Title:_~ Address:_ Phone: C Signatu~ Date: Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the prgsident. i I, ~, LT'~S~ ~.~ ~ ~.~~ t _~ , a Notary Public for the State of U-`~"h - l ~ , County of --~~~-~ , do hereby certify th ~ 1 ~ ~-- ~../ personally appeared before me this ~C~ day of ~ , ~, and acknowledge the due execution of the forgoing wet [wetland] detention basin official seal, ~q~ n an n ~ "~+~ - .. cT ~ n ,~ . raintenance re uirements. Witness my hand and SEAL My commission expires ~ ~ ~- ~l~lJ Page 2 of 2 DWQ Project No. 06-1214 DIVISION OF WATER QUALITY - 401 EXTENDED DETENTION (and POCKET*) WETLAND WORKSHEET I. PROJECT INFORMATION (please complete the following information): Project Name : Woodcreek -Amenity Center Phase (a.k.a. "Recreation Tract" in certification does) Contact Person: _C. Heath Wadsworth, PE Phone Number: j 919) 238-0323 For projects with multiple basins, specify which basin this worksheet applies to: N/A Permanent Pool Elevation 366.00 ft. (elevation of the orifice invert out) Temporary Pool Elevation 367.70 ft. (elevation of the outlet structure invert in) Permanent Pool Surface Area 11,848 sq. ft. (water surface area at permanent pool elevation) Drainage Area 10.68 ac. (on-site and off-site drainage to the basin) Impervious Area 6.02 ac. (on-site and off-site drainage to the basin) Forebay Surface Area 1.778.5 sq. ft. (at permanent pool elevation approximately 15%)* Marsh 0"-9" Surface Area 4.148 sq. ft. (at permanent pool elevation approximately 35%)* Marsh 9"-18" Surface Area 4,143 sq. ft. (at permanent pool elevation approximately 35°~)* Micro Pool Surface Area 1.778.5 sq. ft. (at permanent pool elevation approximately 15%)* Temporary Pool Volume 23,087 cu. ft. (volume detained on top of the permanent pool) SA/DA used 2.28 (surface area to drainage area ratio)* Diameter of Orifice 2.0 in. (draw down orifice diameter) REQUIRED ITEMS CHECKLIST Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, attach an explanation of why. At a minimum; a complete stormwater management plan submittal includes a worksheet for each BMP, design calculations, plans and specifications showing all BMPs and outlet structure details, a detailed drainage plan and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project Applicants Initials LNa The temporary pool controls runoff from the 1 inch rain. f_ Nv The basin side slopes are no steeper than 3:1. Lt/w A planting plan for the marsh areas with plant species and densities is provided. G~l.,~ Vegetation above the permanent pool elevation is specified. LJfi,J An emergency drain is provided to drain the basin. L~r„/ The temporary pool draws down in 2 to 5 days. Lithe Sediment storage is provided in the permanent pool. ~~ A sediment disposal area is provided. Ltfw Access is provided for maintenance. 1~ A site speafic, signed and notarized operation and maintenance agreement is provided. 1~~1r,/ The drainage area (including any offsite area) is delineated on a site plan. ~~h./ Access is provided for maintenance. Lf>h/ Plan details. for the wetland are provided. -Plan details for the inlet and outlet are provided. L~G/ A site specific operation and maintenance agreement, signed and notarized by the responsible party is provided (see http:fm2o.ehnr.state.nc.us/ncwetlands/oandm.doc). * Pocket Wetlands have different design parameters and are only assumed to remove 35°~ TSS -See pp.19and 20 of the NC DENR stormwater BMP Manual, April 1999. 10% open water, 50°~ high marsh, 40°~ low marsh. WITHERS c~ RAVENEL WOODCREEK -Amenity Center Phase Stormwater Management Report Holly Springs, North Carolina Prepared For: Preston Development Company ioo Weston Estates Way Cary, NC 27513 Prepared By: WITHERS &RAVENEL, INC iil MacKenan Drive Cary, North Carolina 275ii February, Zoo? W&R Project No. 02040232.80 ,~,:~., ,~s° ~ r ,; ,1 ~ ~~;. ,,; .,. w ~; ~~~ ~~ q }.r. .:..: • r o o°D.~• ~ ~15~{1'1{IUI/t1151/li ~ .1 ' ~ ~. r t~l'1 '~~' C. Heath Wadsworth, P.E. ~r'~_,W ~ ~ ~; 1~ WOODCREEK -Amenity Center Phase Stormwater Management Report Holly Springs, North Carolina INTRODUCTION The purpose of this study is to document the Stormwater management plan for the Amenity Center Phase of the proposed development in accordance with the 401 Water Quality Certification and Authorization Certificate's Additional Conditions (DWQ Project # o6-izi4; designated as "Recreation Tract" in Additional Condition #7). The plan includes the design of one constructed wetland in the Amenity Center Phase in order to treat Stormwater runoff. The site is located in the Neuse River Basin and all ofthe site drainage is received by Middle Creek. Amenity Center Phase SITE }y~ 9L GLIFFCREEK~ '6~a .. ~f Fgure i. Site in red on 2005 Aerial Photography; the phase is shown in yellow The proposed constructed wetland is designed to draw down the first inch of runoff over a z to 5 day period and is sized according to the Division of Water Quality surface area requirements in order to achieve 85%Total Suspended Solids and 4o%total nitrogen reduction. The future phases of this development that require Stormwater management will employ the use of constructed wetlands, bioretention areas, and/or wet detention basins followed by a forested filter strip in order to meet Water Quality Certification #34oz in order to manage Stormwater (from 401 Water Quality Certification the Tract D, Tract F, Tract J, and the Recreation Tract phases require a Stormwater management plan). These BMPs will be designed and submitted at a later date. WOODCREEK -Amenity Center Phase i W&R Project ozo4oz3z.8o Stormwater Management Report February, zoo? n L~ WOODCREEK -Amenity Center Phase • Stormwater Management Report • Holly Springs, North Carolina METHODOLOGY The Stormwater study was conducted using the natural drainage features as depicted by the Wake • County aerial topographic information (2-ft contours), field surrey data and proposed development within the drainage areas. • The scope of work included the following analyses: Hydrology • ^ Simulation of the io-year and ioo-year rainfall events for the Holly Springs area ^ Formulation of the io-year, and ioo-year flood hydrographs for the proposed developed drainage area Hydraulic • ^ Routing the 1o-year and ioo-year flood hydrographs for post development runoff through the proposed Stormwater BMPs • The results of the hydrologic calculations are used in the hydraulic analyses. The hydraulic design requires the development of stage-storage and stage-discharge functions for the wet detention basins. The rainfall/runoff hydrographs, stage-storage and stage-discharge functions have been compiled to create a routing computer simulation model using Haestad Methods PondPack vio.o • software. This PondPack model was then used to assess the impact of the peak discharges for the design rainfall events. The PondPack modeling results are provided as appendices to this report. • HYDROLOGY The SCS Method was used to develop runoff hydrographs for the zo-year and ioo-year storm events. • NOAA Atlas i4 rainfall data for Raleigh-Durham International Airport was used to determine the 2!}- • hour duration rainfall for the io-year and Zoo-year storm events. This method requires three basic parameters: a curve number (CN), time of concentration (t~, and drainage area. • • Curare numbers were based on soil type and land use. Soil types were delineated from the Soil Survey of Wake County, North Carolina (November 1970). land use data was determined using aerial photography and the most recent site plans for the proposed site. The curve numbers used in this study are listed in the appendix of this report. Times of concentration were estimated to have a time of concentration of 5 minutes to account for shallow paved flow, and piping. HYDRAULICS Computer simulated reservoir routing ofthe io-year, and Zoo-year design storms utilized stage- storageand stage-discharge functions. Stage-storage functions were derived from the proposed contours for the wet detention basins. Anon-linear regression relation for surface area versus elevation was derived for the BMP. This relation estimates the incremental volume of the basin to the stage or elevation of the basins. Stage-discharge functions were developed to size the outlet structures for the wetlands. CONCLUSIONS Based on the routing study, the outlet proposed for the constructed wetland passes the Zoo-year WOODCREEK -Amenity Center Phase Stormwater Management Report W&R Project ozogoz3z.8o February, zoo? WOODCREEK -Amenity Center Phase Stormwater Management Report Holly Springs, North Carolina storm with at least one foot of freeboard. The results for the run are included in the appendix of this report. The drainage area map on Sheet 1 of the appendix includes the outlet design for this phase's BMP. Planting schedules and more detailed design information is included on the Construction Drawing "Woodcreek - Lockley Drive Extension" submitted with this report. WOODCREEK -Amenity Center Phase 3 W&R Project ozogo23z.8o Stormwater Management Report February, zoo? J z t , I tI t : a __ __- �1 ��f ",*y �,+. i'� '-- rl � _ i� it %-��-fit 'i�,•ti 4 * � � - I - - . t , L • P - 1 � �'�' ' �i I J f.. , � --_ ~" - •- I ' I !'� J"-`.•.- y ���.`�' "yarr' ` -- - _ - _ + i i ; . • � _*.t � I :� '` -e.. � "c ti, ">�s`"`+. � } ' ,Ct i /� _ "+. .,l'.._ �". - , �f� 1�: J r 1 ,� I III Itr I 1 j i.r �`����`,•" ?:' �Yi-_ .'c"� �..> t.. '�Ci y. "`�.. _ �'ri'III �7�1I 1 I �'�• •5 I ' _ F , I _ � t •' r :.� — � 'jai • , `: I I. ~��--k...-.,, l�' i -.. __ �f�a, /:: i � . T''--,t„��- ;� �� ' . �l Yf ,,J �:•'� S- .� j'- �� - ��I�� I � I R � � . � f� , I f a.�. - - i.... E� r ' :. ! �` .s ``: � ., � •`,6 I:+, �t �. �,"`,.. , "I � I i l i I r I j � . - , _. - } , -. ,. .., __ - - � - Mei �:z� •- I 1,` • 1 1 1 • 1 • .•:'A. f _ i I ♦ .- ' . J f r J , f f ;r z j.. _ 1 II t 7 f 1 ROUTING CALCULATION S DA1c (rec site) ., ~• ' ,~~:.i~ .., .. '• ~O- O w etland 1 c G~ O Out 10 • • • • • • • • • • • • • • • • • • • • • • • • • Table of Contents ***t****************** MASTER SUMMARY **:t:t********t********t Watershed....... Master Network Summary ............. 1.01 ****************** DESIGN STORMS SUMMARY ******************* RDU NOAA 14 Desi Design Storms ...................... 2.01 ********************** TC CALCULATIONS *******t******tttt*** DA1C (REC SITE) Tc Calcs ........................... 3.01 *****t**************** CN CALCULATIONS ******************r** DA1C (REC SITE) Runoff CN-Area ..................... 4.01 ****:t****************** POND VOLUMES *t*******xrt*********t* WETLAND 1C...... Vol: Elev-Area ..................... 5.01 ******************** OUTLET STRUCTURES ********************* Outlet lc....... Outlet Input Data .................. 6.01 i S/N: DOYXYWH3NLBE PondPack (10.00.015.00) 2:07 PM Withers & Ravenel 2/15/2007 Type.... Master Network Summary Page 1.01 Name.... Watershed File.... K:\04\04-230\04232\H&H\Stormwater\PondPack\woodcreek.ppw MASTER DESIGN STORM SUMMARY Network Storm Collection: RDU NOAA 14 Desi Total Depth Return Event in 2 3.4400 5 4.3000 10 4.9800 25 5.9000 50 6.6300 100 7.3700 1 3.0000 Rainfall Type ---------------- Time-Depth Curve Time-Depth Curve Time-Depth Curve Time-Depth Curve Time-Depth Curve Time-Depth Curve Synthetic Curve RNF ID RDU NOAA 2yr RDU NOAA Syr RDU NOAA 10yr RDU NOAA 25yr RDU NOAA SOyr RDU NOAA 100yr TypeII 24hr MASTER NETWORK SUMMARY SCS Unit Hydrograph Method (*Node=Outfall; +Node=Diversion;) (T run= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left&Rt) Return HYG Vol Qpeak Qpeak Node ID Type Event ac-ft ------ Trun -- hrs --------- cfs -------- ----- DA1C ------ (REC ------ SITE) ---- AREA ------ 2 ---- 1.543 12.1000 33.45 DA1C (REC SITE) AREA 5 2.191 12.1000 43.71 DA1C (REC SITE) AREA 10 2.725 12.1000 51.78 DA1C (REC SITE) AREA 25 3.467 12.1000 60.57 DA1C (REC SITE) AREA 50 4.068 12.1000 65.87 DAlC (REC SITE) AREA 100 4.685 12.1000 71.72 DA1C (REC SITE) AREA 1 1.227 11.9500 22.18 *OUT 10 JCT 2 1.521 R 12.2500 11.83 *OUT 10 JCT 5 2.168 R 12.2000 27.27 *OUT 10 JCT 10 2.701 R 12.1500 37.53 *OUT 10 JCT 25 3.442 R 12.1.500 47.54 *OUT 10 JCT 50 4.043 R 12.1500 52.85 *OUT 10 JCT 100 4.659 R 12.1500 55.83 *OUT 10 JCT 1 1.206 R 12.2500 3.36 Max Max WSEL Pond Storage ft ac-ft -------- ------------ S/N: DOYXYWH3NLBE Withers & Ravenel PondPack (10.00.015.00) 2:07 PM 2/15/2007 Type.... Master Network Summary Page 1.02 Name.... Watershed File.... K:\04\04-230\04232\H&H\Stormwater\PondPack\woodcreek.ppw MASTER NETWORK SUMMARY SCS Unit Hydrograph Method (*Node=Outfall; +Node=Diversion;) (T run= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left&Rt) Max Return HYG Vol Qpeak Qpeak Max WSEL Pond Storage Node ID Type Event ac-ft Trun hrs cfs -------- ft -------- ac-ft ------------ --------- WETLAND ---- 1C ---- IN ---- POND ------ 2 ---------- 1.543 -- --------- 12.1000 33.45 WETLAND 1C IN POND 5 2.191 12.1000 43.71 WETLAND lC IN POND 10 2.725 12.1000 51.78 WETLAND 1C IN POND 25 3.467 12.1000 60.57 WETLAND 1.C IN POND 50 4.068 12.1000 65.87 WETLAND 1C IN POND 100 4.685 12.1000 71.72 WETLAND 1C IN POND 1 1.227 11.9500 22.18 WETLAND 1C OUT POND 2 1.521 R 12.2500 11.83 368.09 .665 WETLAND 1C OUT POND 5 2.168 R 12.2000 27.27 368.38 .775 WETLAND 1C OUT POND 10 2.701 R 12.1500 37.53 368.55 .837 WETLAND 1C OUT POND 25 3.442 R 12.1500 47.54 368.69 .894 WETLAND 1C OUT POND 50 4.043 R 12.1500 52.85 368.77 .923 WETLAND 1C OUT POND 100 4.659 R 12.1500 55.83 368.84 .953 WETLAND 1C OUT POND 1 1.206 R 12.2500 3.36 367.86 .583 S/N: DOYXYWH3NLBE Withers & Ravenel PondPack (10.00.015.00) 2:07 PM 2/15/2007 Type.... Design Storms Name.... RDU NOAA 14 Desi Page 2.01. File.... K:\04\04-230\04232\H&H\Stormwater\PondPack\woodcreek.ppw Title... Project Date: 10/18/2006 Project Engineer: CHW Project Title: Woodcreek Project Comments: DESIGN STORMS SUMMARY Design Storm File,ID = RDU NOAA 19 Desi Storm Tag Name = 2 Data Type, File, ID Storm Frequency Total Rainfall Depth Duration Multiplier Resulting Duration Resulting Start Time Time-Depth Curve RDU NOAA 2yr 2 yr 3.4400 in 1 23.9904 hrs .0000 hrs Step= .0833 hrs End= 23.9904 hrs Storm Tag Name = 5 Data Type, File, ID = Time-Depth Curve RDU NOAA Syr Storm Frequency = 5 yr Total Rainfall Depth= 4.3000 in Duration Multiplier = 1 Resulting Duration = 23.9904 hrs Resulting Start Time= .0000 hrs Step= .0833 hrs End= 23.9904 hrs Storm Tag Name = 10 Data Type, File, ID Storm Frequency Total Rainfall Depth Duration Multiplier Resulting Duration Resulting Start Time Time-Depth Curve RDU NOAA 10yr 10 yr 4.9800 in 1 23.9904 hrs .0000 hrs Step= .0833 hrs End= 23.9909 hrs Storm Tag Name = 25 Data Type, File, ID = Time-Depth Curve RDU NOAA 25yr Storm Frequency = 25 yr Total Rainfall Depth= 5.9000 in Duration Multiplier = 1 Resulting Duration = 23.9904 hrs Resulting Start Time= .0000 hrs Step= .0833 hrs End= 23.9904 hrs Storm Tag Name = 50 Data Type, File, ID Storm Frequency Total Rainfall Depth Duration Multiplier Resulting Duration Resulting Start Time Time-Depth Curve RDU NOAA 50yr 50 yr 6.6300 in 1 23.9904 hrs .0000 hrs Step= .0833 hrs End= 23.9904 hrs S/N: DOYXYWH3NLBE Withers & Ravenel PondPack (10.00.015.00) 2:07 PM 2/15/2007 Type.... Design Storms Name.... RDU NOAA 14 Desi Page 2.02 File.... K:\04\04-230\04232\H&H\Stormwater\PondPack\woodcreek.ppw Title... Project Date: 10/1.8/2006 Project Engineer: CHW Project Title: Woodcreek Project Comments: DESIGN STORMS SUMMARY Design Storm File,ID = RDU NOAA 14 Desi Storm Tag Name = 100 Data Type, File, ID = Time-Depth Curve RDU NOAA 100yr Storm Frequency = 100 yr Total Rainfall Depth= 7.3700 in Duration Multiplier = 1 Resulting Duration = 23.9990 hrs Resulting Start Time= .0000 hrs Step= .0833 hrs End= 23.9990 hrs Storm Tag Name = 1 Data Type, File, ID Storm Frequency Total Rainfall Depth Duration Multiplier Resulting Duration Resulting Start Time Synthetic Storm TypeII 24hr 1 yr 3.0000 in 1 24.0000 hrs .0000 hrs Step= .1000 hrs End= 24.0000 hrs S/N: DOYXYWH3NLBE Withers & Ravenel PondPack (10.00.015.00) 2:07 PM 2/15/2007 Type.... Tc Calcs Name.... DA1C (REC SITE) Page 3.01 File.... K:\04\04-230\04232\H&H\Stormwater\PondPack\woodcreek.ppw TIME OF CONCENTRATION CALCULATOR Segment #1: Tc: User Defined Segment #1 Time: .0830 hrs ------------------------- Total Tc: .0830 hrs Calculated Tc < Min.Tc: Use Minimum Tc... Use Tc = .0833 hrs S/N: DOYXYWH3NLBE Withers & Ravenel PondPack (10.00.015.00) 2:07 PM 2/15/2007 Type.... Tc Calcs Name.... DA1C (REC SITE) Page 3.02 File.... K:\04\04-230\04232\H&H\Stormwater\PondPack\woodcreek.ppw ------------------------------------------------------------------------ Tc Equations used... ------------------------------------------------------------------------ ___= User Defined =----------------------------------------------------- Tc = Value entered by user Where: Tc = Time of concentration S/N: DOYXYWH3NLBE Withers & Ravenel PondPack (10.00.015.00) 2:07 PM 2/15/2007 Type.... Runoff CN-Area Name.... DA1C (REC SITE) Page 4.01 Fi.le.... K:\04\09-230\09232\H&H\Stormwater\PondPack\woodcreek.ppw RUNOFF CURVE NUMBER DATA .......................................................................... .......................................................................... Impervious Area Adjustment Adjusted Soil/Surface Description CN acres oC oUC CN -- -------------------------------- Open space (Lawns parks etc.) - Goo ---- 61 --------- 2.980 ----- ----- ---- 61.00 Residential Districts - 1/8 acre (t 85 4.810 85.00 Impervious Areas - Paved parking lO 98 2.890 98.00 COMPOSITE AREA & WEIGHTED CN ---> ................................... ................................... ..... ..... 1.0.680 .......... .......... ............ ............ 81.82 (82) ............. ............. S/N: DOYXYWH3NLBE Withers & Raven el PondPack (10.00.015.00) 2:07 PM 2/15/2007 Type.... Vol: Elev-Area Name.... WETLAND 1C Page 5.01 File.... K:\04\09-230\09232\H&H\Stormwater\PondPack\woodcreek.ppw Elevation Planimeter Area Al+A2+sgr(A1*A2) Volume Volume Sum (ft) (sq.in) (sq.ft) --------- (sq.ft) ---------------- (ac-ft) ---------- (ac-ft) ------------- ----------- 366.00 ------------- ----- 11853 0 .000 .000 367.00 ----- 13782 38416 .294 .294 368.00 ----- 15770 44295 .339 .633 369.00 ----- 17815 50346 .385 1.018 370.00 ----- 19915 56566 .433 1.451 POND VOLUME EQUATIONS * Incremental volume computed by the Conic Method for Reservoir Volumes. Volume = (1/3) * (EL2-EL1) * (Areal + Areal + sq.rt.(Areal*Area2)) where: ELI, EL2 = Lower and upper elevations of the increment Areal,Area2 = Areas computed for EL1, EL2, respectively Volume = Incremental volume between EL1 and EL2 S/N: DOYXYWH3NLBE Withers & Ravenel PondPack (10.00.015.00) 2:07 PM 2/15/2007 Type.... Outlet Input Data Name.... Outlet lc Page 6.01 File.... K:\04\04-230\04232\H&H\Stormwater\PondPack\woodcreek.ppw REQUESTED POND WS ELEVATIONS: Min. Elev.= 366.00 ft Increment = .10 ft Max. Elev.= 370.00 ft OUTLET CONNECTIVITY ---> Forward Flow Only (Upstream to DnStream) <--- Reverse Flow Only (DnStream to Upstream) <---> Forward and Reverse Both Allowed Structure No. Outfall El, ft E2, ft Inlet Box RO ---> CO 367.700 370.000 Orifice-Circular 00 ---> CO 366.000 370.000 Culvert-Circular CO ---> TW 362.000 370.000 TW SETUP, DS Channel S/N: DOYXYWH3NLBE Withers & Ravenel PondPack (10.00.015.00) 2:07 PM 2/15/2007 Type.... Outlet Input Data Name.... Outlet 1c Page 6.02 File.... K:\04\04-230\04232\H&H\Stormwater\PondPack\woodcreek.ppw OUTLET STRUCTURE INPUT DATA Structure ID = RO Structure Type = Inlet Box -- ------ ------------------- # of Openings = --------- 1 Invert Elev. = 367.70 ft Orifice Area = 16.0000 sq.ft Orifice Coeff. _ .600 Weir Length = 16.00 ft Weir Coeff. = 3.000 K, Reverse = 1.000 Mannings n = .0000 Kev,Charged Riser = .000 Weir Submergence = No Structure ID = 00 Structure Type = Orifice-Circular ------------------------------------ # of Openings = 1 Invert Elev. = 366.00 ft Diameter = .1700 ft Orifice Coeff. _ .600 S/N: DOYXYWH3NLBE Withers & Ravenel PondPack (10.00.015.00) 2:07 PM 2/15/2007 Type.... Outlet Input. Data Name.... Outlet 1c Page 6.03 OUTLET STRUCTURE INPUT DATA Structure ID = CO Structure Type ------ = Culvert-Circular ------------------- ----------- No. Barrels = 1 Barrel Diameter = 2.5000 ft Upstream Invert = 362.00 ft Dnstream Invert = 360.00 ft Horiz. Length = 62.00 ft Barrel Length = 62.03 ft Barrel Slope = .03226 ft/ft OUTLET CONTROL DATA... Mannings n = .0150 Ke = .5000 Kb = .012271 Kr = .5000 HW Convergence = .001 (forward entrance loss) (per ft of full flow) (reverse entrance loss) +/- ft INLET CONTROL DATA... Equation form = 1 Inlet Control K = .0098 Inlet Control M = 2.0000 Inlet Control c = .03980 Inlet Control Y = .6700 T1 ratio (HW/D) = 1.144 T2 ratio (HW/D) = 1.291 Slope Factor = -.500 Use unsubmerged inlet control Form 1 equ. below T1 elev. Use submerged inlet control Form 1 equ. above T2 elev. In transition zone between unsubmerged and submerged inlet control, interpolate between flows at T1 & T2... At T1 Elev = 364.86 ft ---> Flow = 27.16 cfs At T2 Elev = 365.23 ft ---> Flow = 31.05 cfs Structure ID = TW Structure Type = TW SETUP, DS Channel FREE OUTFACE CONDITIONS SPECIFIED CONVERGENCE TOLERANCES ... Maxi mum Iterations= 40 Min. TW tolerance = .O1 ft Max. TW tolerance = .Ol ft Min. HW tolerance = .O1 ft Max. HW tolerance = .01 ft Min. Q tolerance = .00 cfs Max. Q tolerance = .00 cfs S/N: DOYXYWH3NLBE Withers & Ravenel PondPack (10.00.015.00) 2:07 PM 2/15/2007 Appendix A Index of Starting Page Numbers for ID Names A-1 ----- D ----- DA1C (REC SITE)... 3.01, 4,01 ----- 0 ----- Outlet lc... 6.01 ----- R ----- RDU NOAA 14 Desi... 2.01 ----- w ----- Watershed... 1.01 WETLAND 1C... 5.01 S/N: DOYXYWH3NLBE Withers & Ravenel PondPack (10.00.015.00) 2:07 PM 2/15/2007 BMP SIZING CALCULATION S Project Name: Woodcreek -Amenity Center Phase City/State: Holly Springs, NC Project #: 2040232 Date: 15-Feb-07 Table 1.1 Surface Area to Drainage Area Ratio for Permanent Pool Sizing for 85~ Pollutant Romnval Fffi~ipnrv in the PiPrlmnnt Impervious Cover Permanent Pool Dept 3.0 4.0 5.0 6.0 h (feet) 7.0 8.0 9.0 10 0.59 0.49 0.43 0.35 0.31 0.29 0.26 20 0.97 0.79 0.70 0.59 0.51 0.46 0.44 30 1.34 1.08 0.97 0.83 0.70 0.64 0.62 40 1.73 1.43 1.25 1.05 0.90 0.82 0.77 50 2.06 1.73 1.50 1.30 1.09 1.00 0.92 60 2.40 2.03 1.71 1.51 1.29 1.18 1.10 70 2.88 2.40 2.07 1.79 1.54 1.35 1.26 80 3.36 2.78 2.38 2.10 1.86 1.60 1.42 90 3.74 3.10 2.66 2.34 2.11 1.83 1.67 Source: NCDENR/DWQ Stormwater Best Management Practices, pg. S, April 1Nyy STORMWATER BMP 1 -CONSTRUCTED WETLAND (40% TN Removal) Land Use Area (ac) % IA Imp. Area (ac) Im ervious 6.02 100 6.0 O en S ace 4.66 0 0.0 Totals 10.68 6.0 Total % Impervious Surface Area = 56.4 Surface Area of Permanent Pool: Assumed depth = 3 feet SA/DA ratio = 2.28 % From Table 1.1 Minimum pond surface area (SA) _ (DA * SA/DA ratio)/100 SA = 0.243 acres 10591 sq. ft. Normal pool elevation = 366.0 feet Surface area provided = 0.272 acres 11848 sq. ft. 1-Inch Runoff Volume Calculation Using the runoff volume calculations in the "Simple Method" as described by Schueler (1987) Rv = 0.05 + 0.009(1) where, Rv =Runoff coefficient, in./in. I =Percent impervious Rv = 0.56 in./in. Total runoff volume from 1-inch precipitation: Runoff volume, S = (Design rainfall) (Rv) (Drainage Area) S = 0.496 acre-ft 21606 cu. ft. Water quality pool elevation= 366.00 feet Storage volume provided = 0.530 acre-ft 23087 cu. ft. Project Name: Woodcreek -Amenity Center Phase Project #: 2040232 City/State: Holly Springs, NC Date: 15-Feb-07 STORMWATER BMP 1 -CONSTRUCTED WETLAND (40% TN Removal) Orifice Calculator Variables Constants WQ Volume: 0.496 Acre-ft 21605.76 cf g = 32.2 ft/sz Head: 1.70 ft 0.85 ft Cd = 0.6 Draw down time: 60 hrs 216000 s Orifice Area = 0.022533 sq. ft 3.244701 sq. in Orifice Diameter = 2.032556 in USE 2 INCH DIAMETER ORIFICE