HomeMy WebLinkAbout20191151 Ver 1_Shoreline Stabilization_20190828'� f Ick �
PA to
Project Name/address: C� 1�1`�County: &1dwe-a
_
Owner: �J XL wV\
Print
Contractor/agent:
Print
Signature
Signature
20191151
The approval is for the purpose and design described in your application. Impacts not indicated in the
application is a violation of the Buffer Rule. Site specific work should be provided in the application. [15A NCAC
02H .0506 and 15A NCAC 02B .0243(8)]
Trees are not allowed to be removed from Zone 1 of the Buffer (within 30 ft of the full pond elevation), unless
approved. Exception, those trees that are severely undermined along the immediate shoreline can be removed.
Minimal shaping and sloping along the immediate shoreline is allowed. [15A NCAC 02B.0243(6)]
Benching, grading in the buffer is not allowed. Excessive disturbance of ground cover. [15A NCAC 026.0243 (6)]
Beaches, impervious patios, impervious walkways, etc. are not allowed in the buffer unless specifically approved
by the Division. There are limitation on size for decks. [15A NCAC 02B .0243(4) and (6)]
Work to be conducted from land must indicate an access and indicate any trees that are to be removed. The
work corridor should be described. The approved access corridor shall be restored. Staging, spoil, construction
material must be outside the buffer. [15A NCAC 02H .0502 and 15A NCAC 0213 .0243 (4), (6), (8)]
Stormwater cannot be piped or channeled for direct discharge to the lake. All constructed stormwater
discharges must be at the natural elevation and discharged prior to entering the buffer directed as diffuse or
sheet flow at non-erosive velocities to the lake. [15A NCAC 02B .0243(5), (6)]
Acknowledgement of Notification
I, �J Q aw tl i�y hereby state that I have been informed of the Catawba
Riparian Buffer Rule. Any work conducted in the buffer, not specifically stated in the application and approved
by the Division of Water Resources (DWR), is a violation and subject to enforcement. Due diligence will be
taken such that the construction will be built within substantial compliance and intent of the 401 Water
Quality Certification and Buffer Rules, the approved plan(s) and specification(s), and other supporting
materials.
�1 Signature (owner): � '�— Date:
A 17
State of North Carolina Environmental Quality Water Resources
512 N. Salisbury Street Ibli Mail Service Center ; Raleigh NC 27699-1611
Q19.707.9000
The following is an abbreviated application fovea for those applying for a 401 Water Quality
Certification to impact FERC (Federal Energy Regulatory Commission) regulated lake shore or
bottom under the U.S. Army Corps of Engineers Kermit GF30. This Application cannot be used
for wetland or stream impacts. please provide five (5) copies of this
application and supporting
information as well as a non-refundable application fee to the Division of Water Quality $240
equal to 1 acr.00
for impacts r lake bottom of less than 1 acre anti $570.00 for impacts to lake bottom of greater or
e.
Applications should he sent to:
Division of Nater Quality 401 Oversight/Express Review Permitting
1650 bail Service Center
Raleigh, NC 27699-1650
�. Applicant Information
1. Owner/Applicant information
Name:
Mailing
Telephone Number. 03 .
E-mail Address: � i ► 1,
N
Agent information (A signed and dated copy of the Agent Authorization letter must be attached
if the Agent has signatory authority for the owner/applicant.)
Name:
Company Affiliation:
Mviilin Add -
g es
s.
Telephone Number;
Fax Number:
E-mail Address:
U. Project Information
Attach a vicinity map clearly showing the location of the property with respect to local Iandmarks such
as towns, rivers, and roads. Also provide a detailed site plan showing
development plans in relation to surrounding properties. you property boundaries and
may use the dia
hand sketch of your project. Also, see the example below for guidance. Both theb�ty, map and site
plan must include a scale and north arrow. The footprints of all buildings, impervious surfaces, or other
facilities must be included.
1. Location
County. _N iU )0 .` 1 Nearest Town: GU�L�
Subdivision name or site address (include phase/lot number): l.0-1
Directions to site please include road numbers, landmarks, etc. (This is not necessary if an adequate
vicinity map is included):ol
2. Describe the existing land tSe or condition of the site at the time of this application: U3+
3. Property size (acres): _ �a
4. Nearest body of water (stream/river/sound/ocean/lake):
5. Describe the purpose of the proposed work:
6. List the type of equipment to be used to construct the project:
7. Amount of impact (including all excavation, backfill,rip rap, retaining walls, etc. below the
normal pool lake level in square feet or acres: 3 p w u ` I 0 —
4-o)A , I y � o ' 'u
8.a. Amount of impact (including all clearing, back fill, excavation, rip rap, retaining walls, etc.)
above the normal pool ;akA Ievel and 50 feet landiwa d in q�re feet or acres:
I' U
56
Z o
8.b. Please describe vegetation above the normal pool lake level and 50 feet landward to be impacted
(number of trees for instance): 00 y\-O—
M
t/Agent's Signature Da
signature is valid only if an authorization letter from the applicant is provided.)
s::
Lpbing- u,
A Mooresville
R. 142 Edgewater Ct, Granite Falls, NC 28630
A Mooresville
Head northwest on W McLelland Ave toward S Academy St
Bear left onto NC -150
2. Pass Shell in 1.7 mi
1 hr 21 min, 58 mi
Moderate traff K, (21 min delay)
Via 1-77 N, 1-40 W
0.9 mi
1.8 mi
Take ramp right for 1-77 North toward Statesville
3
14.9 mi, 15 min
Pass Days Inn on the right in 0.1 mi
At exit 51, take ramp right for US -21 toward Statesville
4
29.5 mi, 30 min
Pass Days Inn on the right in 1.7 mi
At exit 1236-A, take ramp right for US -321 North toward Hickory/
32;
5.
Lenoir
8.0 mi
Pass Murphy Express in 5.8 mi
N
6.
Take ramp right toward Granite Falls Downtown
0.1 mi
y
Turn left onto Falls Ave
0.4 mi
Turn left onto Crestview St, and then immediately turn right onto
8.
Commerce St
0.1 mi
j
9.
Road name changes to Duke St
0.9 mi
10.Turn
right onto Duke Power Rd
0.4 mi
11.
Turn right onto Broadwater Dr
0.1 mi
12.Bear
left onto Edgewater Ct
0.3 mi
Arrive at Edgewater Ct
13. The last intersection is Broadwater Dr
B 142 Edgewater Ct, Granite Falls, NC 28630
These directions are subject to the Microsoft® Service Agreement and are for informational purposes only. No guarantee is made regarding their completeness or accuracy.
construction projects, traffic, or other events may cause actual conditions to differ from these results. Map and traffic data Cc, 2019 HERE".
. v�,r JYrCA it --I
EYR
xxar ��n.i oat1�1
fTYET11-� -0EiAt /Q�
LAKE RHODHISS
Ir A<
1N/s /JLr / ,1®1,@9 NI IM.VJ "N AV—,J
O' A rlr,d RrrOrJ, WRN MY NLtOa Am/J/OIr.
LaArIRPfd. al4)CNa. R/W!a-04MY, IV
LUJLr(rAi IESrRlmm L/A6 ,OJ DOTE
ALL PIS OeaP9lIn ww rAmw nm
CLemJl rAY RaZ'a�' OLY.
100 O 100 200 300
GIPA%ic SCALE - FEET 1" = 100'
LAXE RHODHISS
c DUKE POWER
'ADOMON TO RHODAVSS
HYDRO STAT70N"
PLr mw 14. Iyw"
BOOK 20
PAGES 35 — 35
PC rYW SpAw POWN !S NITNIN A
,m YDN FXZW PMOiND AW ACCMIA6
JO FIRM /e'r' P^WL
Pb.: 9'/rerLO7 E arrEV-18,31M
LEGEND
Exlet/rg Iron P/p •EIP
Ab Iron Pfer O NIP
ew.liro /_Abd • EIR
MI
AIron Rbd O NIR
Rlshrr Frond •RF
M/ U tv
r
T
T
lalw(
1
AYhsr St ORS
✓
SLI .
Irlr
pe/'
Jarr tett
C -/a Aeuv
el.W' LaI/' awfrwv
Co f. Abm~t ❑ at
P. K. Neil A PIC
IAr �~ ffi
rwbrrlV
Nor%",v
��-
nw'
el.N'
N
Point PJ.
e1�1YpgN 6:
6wxd /w rot rr d .rs a/rr/Y 1N/abd o
•P.-
9w! : Yrt tlr d Art 1.1- s c,/GL/,td /,
`, t.r
L-/1
L-ar
NM'b111"
rafsrarr
aur' L -w NrvxlObrT
Mw' L -Ir Naesv/T
S/.M'
rer'
W
VMJNRY IMP
(NO SCALE)
LOIBAOY
L -e/
L -Q
is d AbCir^,/�r
Arjr L -7e Mfrwv,T
.free' L-A Y7!'M7rt
I..M•
1r.0'
0
t1
10
1
7P rM 1_�
$ r
L -ea
L -N
L,10
Grnty GJaMl/
C d
YN L -w Ne1'JP7pt
JY!• L-6/ Ne/?7VC
M/r L -r Nrr'Arrlt
era'
4&rr
eTf'
rrI a/r �N_ d -d AA,rt A¢, ePrl .
1
S
L -w
L tr
r Il/T
vrr
rOr",15T
auv' L -O M rf 3my
xrr L J/ Y IVMo7/T
LME DATA TA$E - SYfET
2 CF 2
1
a '1camw
PEF
fiM6
MOINOF
Ltof/1a[
800116 a"wx
P Ca'
Abuieu LNFlar d
G/d,.r// EountY• i f ret
I r . nnu Ea Norrt
V)
c�rt1/Y — w P/rt
W ldr thls errtr//atl ^n lr afflr` rote
dr
L -I
Lir
r rr7 riv
N rrX2"
aaro•
W
CYJ
-go
NMTr'IJt
ra" fry
Atm,
711w
,11 st,t"tory rrp,lr,tents ra rsta,dlro.
L -a
I"
Lb
N,rw7"
Nmolsom
N57wvri
/2m,
/Till
tsar
L -Jr
C -al
L -Ar
rc"Illr£
rOD'//1MT
NWWII"
/3M•
I/.A•
trw'
[-e
-r
W
NIJWV
Na!?wV
/A.7•'
L -M
mwwtrT
a/lbrTaT
was•
/alt'
C -I
I.Jrr/07/V
tool'
[-S!
M/r/r'I/T
N9r
fl—
L -I
-/o
aw'JI7lV
Nero/3"
/,M•
L -M
NalWV'T
erw'
¢rb: -L
L
Li!
r/eO7
MW
LW
Liv
N40WIST
NOT'
/�
_ _ _�'i—__—
L - /J
s
07NTrs"
BLOW
m,,.
L -t0
J www JIf
NIPo/T/T
ARM'
ti
1
1
rl" all/' a
Mw• Mor' d Ar7l'/eT
T
T
lalw(
L -/I
L -Ie
L -le
Ar V
Jo"Mv
NrrWlV
f.01' L -I/ Nwwwir
JAM' Lye NwIf w
aa.Jr L-43 MI751JSJT
SLI .
Irlr
pe/'
Jarr tett
C -/a Aeuv
el.W' LaI/' awfrwv
�ir'pr'ttM
1 -Ir
L -/e
rwbrrlV
Nor%",v
w..r Lit MIrO7Mt
r/ir L� Mar!'/OT
nw'
el.N'
N
1
e1�1YpgN 6:
6wxd /w rot rr d .rs a/rr/Y 1N/abd o
•P.-
9w! : Yrt tlr d Art 1.1- s c,/GL/,td /,
`, t.r
L-/1
L-ar
NM'b111"
rafsrarr
aur' L -w NrvxlObrT
Mw' L -Ir Naesv/T
S/.M'
rer'
W
1
$ �,b,
LOIBAOY
L -e/
L -Q
rO/To'11
rflTr7r7
Arjr L -7e Mfrwv,T
.free' L-A Y7!'M7rt
I..M•
1r.0'
0
t1
10
1
7P rM 1_�
$ r
L -ea
L -N
L,10
YI /T/T
r rIWaT
NaJ1E'/IT
YN L -w Ne1'JP7pt
JY!• L-6/ Ne/?7VC
M/r L -r Nrr'Arrlt
era'
4&rr
eTf'
rrI a/r �N_ d -d AA,rt A¢, ePrl .
1
S
L -w
L tr
r Il/T
vrr
rOr",15T
auv' L -O M rf 3my
xrr L J/ Y IVMo7/T
NI'
dew•
W
1
etj
rin
PEF
eieL�eW/ t_� r F,q
W
P Ca'
I r . nnu Ea Norrt
V)
1
IN)m)
r - Jr cLrAL£cTOA IpM1f
w
'�iTne'ttAn
CLMVE DATA TAl#C£ - ShEET 2 OF 2
I
llt�a
CIal1£ Nrre
IL#M CWIP 04815 lr
ROA) CONNECTION
C-/ altar
oL/fJa/l• J1r'/IYJV
1
w Aran
C-0 aflam'
8110/• at", s w'Iemv
1
cd eelm'
cr Aram•
aA/e' .6w' ""If"
jAJw a/r aasaV
_
xY
C E}Oor
C-0 Aran•
aro' Lr/r a rlW yt7
mr-w el.w' a trPs+trT
¢
CEN7ERLDW OF MUSTDVG
C-remm'
c-4 esaar
Aim, alar' s /rWMT
Atsr alu s ssst
BB' DUKE POWER CO. R/D'
/tLtrsca£/a Al®O
c-reearr
C -m aAam•
C-11AVl•Nrl 9Oim'
saw' sus' s 4r viwT
Ala/• mar JereraeT
*am • Mel• 8mwvst
ti
C -/e eaCr'
C -/a Saar
rl" all/' a
Mw• Mor' d Ar7l'/eT
T
T
C -II mm'
C -lo saw
ISM' ILra' NWil VAT
ILM' IrJ' NL7 LW -r
OSCAR O. YASQUEZ
sc As/rH
c -/e agar•
C -/r mm'
taw• �' Nrc-lotm, IF
p"rw
YR' e6M' MwAtrerr'
Jarr tett
C -/a Aeuv
el.W' LaI/' awfrwv
M� a F/plro, Ry. nn. L -WO
—SEE SHEET I OF 2 FOR NOTES IS CERTIFICATIONS—
FUTURE DEVELOPMENT
,. I1.1r E. F/metro, PYd.,.l,xrl Lr.r 9u.+Wr ,4
PAF` � 4�R'NIEL�tT p
L-ITIO, �</Iy ret M/r � oMfp . r„Ld/uJr/a
��
�•� ��_--
d /r/d u/tA/n Yr rI'r, d . tv,nty Q A,n/clp/lfy
'
rrt Ire rn a'dl,r,w iht rwu/,W P,rc,1, d lend.
*Ox* -
M� a F/plro, Ry. nn. L -WO
E. rIp/ro• PLS t,rary Y,.t r.,, ,/.t
WESTERN CAROLINA SURVEYORS, PA.
,rr drx.n unlr M ,urrl,lm !ry .^ trt,r/ carry
stat aArtrsa An.. S.W. rsxM. sc. rsrs. (Sae) 758-6W3
e1�1YpgN 6:
6wxd /w rot rr d .rs a/rr/Y 1N/abd o
•P.-
9w! : Yrt tlr d Art 1.1- s c,/GL/,td /,
BROADWATER LANDING — PHASE I
Z.J.
a,r
CL 1 NT:
70awsm IP
NYmQPSQE PRQ^ER7116*1 LLC
LOIBAOY
ICOUNTY
GIIOeQL
13TATE
NL'
DEEC REF./ate Ine
TAX
N14� ry rrIJIro1 ./Jrrturo: r�Irfr,t,s, rMr ,r4
�.
N
a£C7-J-Ie
rrI a/r �N_ d -d AA,rt A¢, ePrl .
a
P T F. .. n. ,r/ a wt
___
OT
SIR IT
/-
- /m'
.9u.+fr' /MJ, stir Ib, -Heil,
AEF
PEF
eieL�eW/ t_� r F,q
P Ca'
a�
Q`
C
"�
d