Loading...
HomeMy WebLinkAbout20191046 Ver 1_Shoreline Stabilization_20190806State of North Carolina Department of Environment and Natural Resources , ra_ Division of Water Resources Water Resources 15A NCAC 02H .0500 — Water Quality Certification, Shoreline Stabilization ENVIRONMENTAL QUALITY FORM: SSGP 02-2017 1W pla Shoreline Stabilization Application Form 2 o l 9 � 046 Three copies of the application (including attachments) and the application fee should be sent to: If sending via US Postal Service If sending via delivery service (UPS, FedEx, etc.) Karen Higgins Karen Higgins DWR — 401 & Buffer Permitting Branch DWR — 401 & Buffer Permitting Branch 1617 Mail Service Center 512 N. Salisbury Street Raleigh, NC 27699-1617 Raleigh, NC 27604 A. Applicant Information [15A NCAC 02H .0502(a)] ' 1 1. Owner Information Name: Walter and Thomas Brosnan Mailing Address: 900-A Centrepark Drive Asheville NC 28805 Telephone Number: 828-275-4678 Fax Number: E-mail Address drbrosnan(@bellsouth.net 2. Agent/ Contact Person Information A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signed this application form. (A form can be downloaded here: http://www saw usace army mil/Portals/59/docs/regulatory/regdocs/Permits/SAMPLE AGENT AUTHORIZ ATION FORM.pdf) Name: Andrew Bick, PE Company Affiliation: Headwaters Engineering PC Mailing Address: 45 Lotus Place Asheville NC 28804 Telephone Number: 828-606-0306 Fax Number: E-mail Address: andrew@headwaters-eng.com B. Project Information [15A NCAC 02H .0502(a) & (b)] 1. Attach a vicinity map (i.e. street map) clearly showing the location of the property with respect to loca landmarks such as towns, rivers, and roads. SEE ATTACHED. 2. Provide a deta led site plan showing property boundaries and proposed locations of vegetation clearing, buildings, retaining walls, docks, impervious surfaces, rip rap, excavation or dredging be ow Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram provided at the end of this application form. SEE ATTACHED PANS. FORM: SSGP 02-2017 Page 1 of 2 95 7/8/2019 9:35 AM Medflow Page 6 of 7 To: Brosnan, Walter 8282,5496 Lawrence Allman 631970 LENS: ACIOL ANTERIOR VITREOUS: clear and quiet FUNDUS EXAM: CUP TQ DISC-: 1 ;OPTIC DISC: no edema, no vascularization, good color (Volk 60D lens) VITREOUS: clear MACULA: peripapillary choroidal nevus VESSELS: 2/3 ratio of Arterioles/venules w/o tortuosity or abnormality PERIPHERY: flat and attached 360 degrees, no retinal holes or tears Laura Barnwell, OSC is scribing for Dr. Park. Dr. Park has reviewed and confirmed the above information is accurate and complete. Impression Plan PRESCRIPTION INSTRUCTION gatifloxacin 0.5 % 1% drops - 1 drop in left eye daily Discontinue on 06/19/2019 by RIP Durezol 0.05% drops - 1 drop in left eye daily Continue 06/19/2019 19:92:01 atropine 1% drops - 1 drop in left eye daily Discontinue on 06/19/2019 by RIP All diagnoses were reviewed with patient and all questions were answered. Advised patient that OS is improving and healing well. Patient to continue durezol and d/c all other drops Will follow up with patient in 1 month PO OS. Precautions were given to patient. FOLLOWUP SCHEDULED: Return Visit - 1 month (OS) POST OP POST OP RIP Robert I Park, MD DOCUMENT CREATE DATE: 06/19/2019 02:92:11 PM Account 631970 07/08/2019 09:25 Page 5 of 6 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.) SEE ATTACHED. 4. Location of the property (where work is to be conducted) County: Swain Nearest Town: Almond Lake/ river/ ocean adjacent to property: Fontana Lake Property size (acres): 118 Subdivision name or site address (include phase/lot number): 162 Watia Road, Almond, NC Directions to site - please include road names and numbers, landmarks, etc.: Cross Fontana Lake on Highway 28 turn left at Watia Road (first on left) and turn left on first driveway on the left Latitude (in decimal degrees) 35.368442 Longitude (decimal degrees) -83.565078 5. Describe the existing land use or condition of the site at the time of this application (residential, undeveloped, etc.): Largely undeveloped with a residence and several out buildings near the lake 6. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary): Plans are attached and show proposed bioengineering on the upper bank 7. Will work be conducted from land? ® From water? ❑ 8. Total amount of impacts below the normal pool lake level/ Normal Water Level Permanent impacts (including all excavation, backfill, rip rap, retaining walls, etc.) in square feet: 900 SF +/- Temporary impacts in square feet: 900 SF +/- 9. Total amount of impacts above the normal pool lake level / Normal Water Level and 50 feet land -ward Permanent impacts (including back fill, excavation, rip rap, retaining walls, etc.) in square feet: 3600 SF +/- Temporary impacts (temporary clearing, construction corridor) in square feet: 1500 SF +/- 10. Please describe the vegetation above the normal pool lake level/ Normal Water Level and 50 feet landward to be impacted (number of trees, for instance): Existing vegetation includes several volunteer boxelders privet river cane and grass lawn on the lake side of the house. Three hbxeldPrs will eftQ be trimmed or removed but other native species wilVbe protectec Owner/Agent's Signature' [15A NCAC 02H .0502(f)] Date FORM: SSGP 02-2017 Page 2 of 2 7/8/2019 9:35 AM Medflow Page 5 of 7 To: Brosnan, Walter 95 Lawrence Allman 631970 albuterol sulfate 0.63 mg/3 mL solution for nebulization - 1 puff as directed daily imipramine HC1 50 mg tablet - 1 capsule as directed Mucus Relief 400 mg tablet - 1 capsule as directed daily prednisolone 15 mg/5 mL solution - 1 capsule as directed warfarin 4 mg tablet - 1 capsule as directed Ophthalmic: atropine 1% drops - 1 drop in left eye daily Durezol 0.05% drops - 1 drop in left eye daily gatifloxacin 0.5 % 1% drops - 1 drop in left eye daily ALLERGIES: Allergies Last Reviewed on:06/19/2019 No Known Drug Allergies REVIEW OF SYSTEMS: GENERAL:Overall healthy SKIN:Denies symptoms ENT:Denies symptoms RESPIRATORY:Asthma CARDIOVASCULAR:Denies symptoms GI:Hx of colon cancer GENITOURINARY:Denies symptoms MUSCULOSKELETAL:Denies symptoms NEUROLOGICAL:Denies symptoms ENDOCRINE:Denies symptoms HEMATO/LYMPHATIC:Derlies symptoms PSYCHIATRIC:Denies symptoms ALLERGIES/IMMUNOLOGY:Denies symptoms Exam ORIENTATION, MOOD AND AFFECT: Alert & oriented x3 RIGHT EYE LEFT EYE UNCORRECTED VA N/A 20/200+14 PINHOLE 20/60-2 PRESSURE METHOD: Applariation Applanation PRESSURES: deferred 15 DATE -TIME: 01:56 PM 01:56 PM TECHNICIAN: MRENTZ MRENTZ CONFRONTATION VF defer PO defer PO EXTERNAL EYE EXAM: LID: normal shape and contour normal shape and contour PUPIL: PERRL, negative APD fixed and dilated ADNEXA: adnexae normal adnexae normal MUSCLE BALANCE: ortho OCULAR MOTILITY: EOMs full ANTERIOR SEGMENT EXAM: TEARFILM: normal CONJUNCTIVA: 1+ hemorrhage, 1+ injected CORNEA: clear CELL/FLARE: / 2+/2+ IRIS: normal size and shape Account 631970 07/08/2019 09:25 Page 4 of 6 82825496 r � i iYf.,". W� f �'.• ?tet J Site Photographs- Brosnan Property on Fontana Lake April 2019 Shoreline in Front of House Erosion around Concrete Vault (Storm Drain Box) A<a„ Monts p W•wi Nu'.1 n.:ual r.vvn Q Pcacnott, bap Q lirapt'`ro Corr. C-ii«�ue�nn!r,.ovr Q t Pnrn�t `7 Q TUrReY Crew: Campground A, 1B� l oqwlak, Tl,v Usr Atoa -. 1� Q WaterSned Purnr It i11t Monhrgnr Hendwovwt Ohrr i'Pn Ctry u Go gE Q McOM Sprptgk t+xt �, ContecnotwBv Map data ©2019 1000 ft , PROJECT SITE INDEX OF SHEETS 1: TITLE 2: PLAN 3-4: DETAILS CONSTRUCTION PLANS SHORELINE STABILIZATION AT BROSNAN PROPERTY FONTANA LAKE SWAIN COUNTY, NORTH CAROLINA 0 C� foo [Y o 00 � LL' �coU �Z o z W U p W o Qz >cn U-1 (� Y D J W z Z OQ F' U N ~ W Z � Y mD_Q�- QO J Z c�ZQO w z<ZZ �ZOQ LuC/)w� o Om U) DATE: JUNE 2019 SCALE: AS SHOWN TITLE SHEET 1 OF 4 a - s PA OT fid v: M s r EV BM r _ _ .17' . -, . ,.. - ,:�-: -•-i _,,__fit j---_�- -^-- ,-�•/��''rr ,.� 8TABILIZ a \� P R OTS TPROPA -STOC Air \ �,= TA N I�` -1-LE -N - FONTANA LAKE (TVA) EXISTING TOP OF BANK 780 G/M2 COIR MATTING STAKED WITH WOODEN STAKES TOP AND BOTTOM 12" DIAM. COIR LOG DORMANT CUTTINGS BETWEEN EACH _ r LIFT, SEE NOTES BELOW FOR SPECIES 1 REMOVE DEBRIS AND 1 5 COURSES OF GEOLIFTS SOFT OR SLUMPED SOIL EXISTING ERODED SHORELINE CLEAN, COMPACTIBLE SOIL WITH 5-10% ORGANICS /� T MIN. NEEDLE -PUNCHED NON -WOVEN FILTER FABRIC MIN. 8 OZ/YD2 1 -TON BOULDERS WITH RIPRAP FILLING VOIDS (MAY BE SUBSTITUED WITH PRE -CAST REDI-ROCK BLOCKS) 2' MIN. VARIES T-9' y 1 GEOLIFT SHORELINE STABILIZATION 3 1"=4' NOTES: 1. TRIM OVERHANGING LIMBS FROM TREES AT TOP OF BANK AND REMOVE ALL EXISTING DEBRIS FROM SLOPE. 2. REMOVE SLUMPED AND LOOSE SOIL AND OVEREXCAVATE FOR STONE FOUNDATION. PLACE FILTER FABRIC IN FOUNDATION EXCAVATION AND OVERLAP AND STAPLE TO SUBGRADE PER MANUFACTURER'S SPECIFICATIONS. 3. PLACE ENTIRE LENGTH OF STONE FOUNDATION, FILLING GAPS BETWEEN BOULDERS WITH CLASS A/B/1 RIPRAP AS NEEDED TO FILL VOIDS. 4. ROLL COIR MATTING LENGTHWISE ALONG SHORELINE, LEAVING 2' OF 6.5' ROLL WIDTH OVER STONE FOUNDATION AND LEAVING FLAP OF REMAINING COIR MATTING EXTENDING OVER THE SLOPE. 5. PLACE COIR LOGS ON TOP OF COIR MATTING AND ANCHOR TO SUBGRADE WITH WOODEN STAKES EVERY 31 . 6. PLACE AND COMPACT 12" LIFT OF CLEAN SOIL OVER COIR AND AGAINST COIR LOG. 7. APPLY TEMPORARY AND PERMANENT SEED MIX AND STRAW MULCH ON FLAT, EXPOSED PORTION OF THE LIFT. 8. WRAP REMAINDER OF COIR ROLL WIDTH UP AND OVER COIR LOG AND STAKE COIR MATTING WITH WOODEN STAKES EVERY 3'. 9. PLACE 2" LAYER OF TOPSOIL OVER FIRST LIFT AND INSTALL DORMANT CUTTINGS OF SILKY DOGWOOD, SILKY WILLOW, ELDERBERRY AND/OR NINEBARKAT 12" TO 18' SPACING IN TOPSOIL. 10. REPEAT STEPS 4 THROUGH 9 TO REACH THE TOP OF BANK. FULL POOL EL. 1710' NORMAL POOL EL. 1703' n n Q Li Q cn o z z 0 o v) F_ w V) W 0 0 (/)a mo`" wc� w00C) z@ U z � z Lu s U w U J z>cn w 3 _. L J 2 LLJ w rn Q m U z z O_ Q Q_ U N F- W z J W \.' Z F- W Z = wZ�O z Q Z z ::1 z O Q ul U) ul L O U) O 00 U) DATE: JUNE 2019 SCALE: AS SHOWN DETAILS SHEET 3 OF 4 u W N Q'- ;1l� N P �Q&............... 0 (/)a mo`" wc� w00C) z@ U z � z Lu s U w U J z>cn w 3 _. L J 2 LLJ w rn Q m U z z O_ Q Q_ U N F- W z J W \.' Z F- W Z = wZ�O z Q Z z ::1 z O Q ul U) ul L O U) O 00 U) DATE: JUNE 2019 SCALE: AS SHOWN DETAILS SHEET 3 OF 4 STEEL T -POST FILTER FABRIC COMPACTED BACKFILL LAKE RUNOFF SIDE 24" MIN. 8" -- 4" RIPARIAN SEED MIX Seeding Rate = 20 Ib/acre Mulching: wheat or oat straw mulch applied at 2 tons/acre Common Name Scientific Name Percentage Deer Tongue Panicum clandestinum 20 Big Bluestem Andropogon gerardii 20 Virginia Wildrye Elymus virginicus 20 Indiangrass Sorghastrum nutans 20 River Oats Chasmanthium latifolium 20 -- 8' MAX. —— STEEL T -POST 18" MIN. LU FILTER FABRIC .-eQ-011111:111 NOTES: 1. SILT FENCE SHALL BE PLACED ON LAKE SIDE OF ALL STOCKPILES. 2. SILT FENCE SHALL BE REMOVED UPON COMPLETION OF EARTHWORK. SILT FENCE 4 NTS TEMPORARY SEED MIX Application Dates Common Name Scientific Name Rate (Ib/acre) Applied Rate (Ib/acre) Applied Separately w/ Riparian Mix August 15 to May 1 Rye Grain Secale cereale 120 60 May 1 to August 15 Browntop Millet Panicum ramosum 40 20 2 SEED MIXES 4 NTS w w Q w Q � 0 Z z O_ 0 U� w cr- Cn w 0 0 (nU ° �o CL o 0 W N U >Q z U Z Z w � U p z 0 (1) Q z> U) CD � m 2 w w Cl) m Q U Z Z O_Q F_ U IV ~ W Z J W Y Fn aZ Q p (n Z Q 0 W Z Q Z Z J Z O Q W U) LL O U) OW = CO U) DATE: JUNE 2019 SCALE: AS SHOWN DETAILS SHEET 4 OF 4 - U : N D _ 0 (nU ° �o CL o 0 W N U >Q z U Z Z w � U p z 0 (1) Q z> U) CD � m 2 w w Cl) m Q U Z Z O_Q F_ U IV ~ W Z J W Y Fn aZ Q p (n Z Q 0 W Z Q Z Z J Z O Q W U) LL O U) OW = CO U) DATE: JUNE 2019 SCALE: AS SHOWN DETAILS SHEET 4 OF 4