September 5, 2019
Wake County
NCDWR Project No.20191056
Utley Creek Greenway
TIP No. C-5604JA
APPROVAL of 401 WATER QUALITY CERTIFICATION with ADDITIONAL CONDITIONS
Mr. Dirk Siebenbrodt, PE
Town of Holly Springs
128 South Main Street
Holly Springs, NC 27540
Dear Mr. Siebenbrodt:
You have our approval, in accordance with the conditions listed below, for the following impacts for the purpose of the Utley Creek
Greenway in Wake County:
Stream Impacts in the Cape Fear River Basin
Site
Culvert Fill in Perennial
Stream linear ft
Stabilization to Perennial
Stream linear ft
Temporary Impact to
Perennial Stream linear ft
Total Stream
Impact linear ft
1
0
30
46
76
2
57
0
15
72
3
0
10
0
10
Total
57
40
61
158
Total Stream Impact for Project: 158 linear feet.
The project shall be constructed in accordance with your application received August 28, 2019. After reviewing your application, we
have decided that these impacts are covered by General Water Quality Certification Number 4135. This certification corresponds to
the Nationwide Permit 14 issued by the Corps of Engineers. In addition, you should acquire any other federal, state or local permits
before you proceed with your project including (but not limited to) Sediment and Erosion Control, Non -Discharge and Water Supply
Watershed regulations. This approval will expire with the accompanying 404 permit.
This approval is valid solely for the purpose and design described in your application (unless modified below). Should your project
change, you must notify the NCDWR and submit a new application. If the property is sold, the new owner must be given a copy of
this Certification and approval letter, and is thereby responsible for complying with all the conditions. If total wetland fills for this
project (now or in the future) exceed one acre, or of total impacts to streams (now or in the future) exceed 150 linear feet,
compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h) (6) and (7). For this approval to remain valid, you
must adhere to the conditions listed in the General Certification and any additional conditions listed below.
North Carolina Department of Environmental Quality I Division of Water Resources
512 North Salisbury Street 11617 Mail Service Center I Raleigh, North Carolina 27699-1617
919.707.9000
DocuSign Envelope ID: B0184D08-387D-4FD8-9DF6-990E0695A677
Conditions of Certification:
1. Unless otherwise approved in this certification, placement of culverts and other structures in open waters and streams, shall be
placed below the elevation of the streambed by one foot for all culverts with a diameter greater than 48 inches, and 20 percent of the
culvert diameter for culverts having a diameter less than 48 inches, to allow low flow passage of water and aquatic life. Design and
placement of culverts and other structures including temporary erosion control measures shall not be conducted in a manner that may
result in dis-equilibrium of wetlands or streambeds or banks, adjacent to or upstream and down stream of the above structures. The
applicant is required to provide evidence that the equilibrium is being maintained if requested in writing by the NCDWR. If this
condition is unable to be met due to bedrock or other limiting features encountered during construction, please contact the NCDWR
for guidance on how to proceed and to determine whether or not a permit modification will be required. [15A NCAC 02H.0506(b)(2)]
2. Riprap shall not be placed in the active thalweg channel or placed in the streambed in a manner that precludes aquatic life passage.
Bioengineering boulders or structures should be properly designed, sized and installed. [15A NCAC 02H.0506(b)(2)]
3. For any streams being impacted due to site dewatering activities, the site shall be graded to its preconstruction contours and
revegetated with appropriate native species. [15A NCAC 02H.0506(b)(2)]
4. The stream channel shall be excavated no deeper than the natural bed material of the stream, to the maximum extent
practicable. Efforts must be made to minimize impacts to the stream banks, as well as to vegetation responsible for maintaining the
stream bank stability. Any applicable riparian buffer impact for access to stream channel shall be temporary and be revegetated with
native riparian species. [15A NCAC 02H.0506(b)(2)]
5. As a condition of this 401 Water Quality Certification, the bridge construction must be accomplished in strict compliance with the
most recent version of NCDOT's Best Management Practices for Construction and Maintenance Activities. [I 5A NCAC 02H
.0507(d)(2) and 15A NCAC 02H .0506(b)(5)]
6. If concrete is used during construction, a dry work area shall be maintained to prevent direct contact between curing concrete and
stream water. Water that inadvertently contacts uncured concrete shall not be discharged to surface waters due to the potential for
elevated pH and possible aquatic life and fish kills. [ 15A NCAC 02B.0200]
7. During the construction of the project, no staging of equipment of any kind is permitted in waters of the U.S..[15A NCAC
02H.0506(b)(2)]
8. The dimension, pattern and profile of the stream above and below the crossing shall not be modified. Disturbed floodplains and
streams shall be restored to natural geomorphic conditions. [15A NCAC 02H.0506(b)(2)]
9. The use of rip -rap above the Normal High Water Mark shall be minimized. Any rip -rap placed for stream stabilization shall be placed
in stream channels in such a manner that it does not impede aquatic life passage. [ 15A NCAC 02H.0506(b)(2)]
10. The Permittee shall ensure that the final design drawings adhere to the permit and to the permit drawings submitted for approval.
[15A NCAC 02H .0507 (c) and 15A NCAC 02H .0506 (b)(2) and (c)(2)]
11. All work in or adjacent to stream waters shall be conducted in a dry work area. Approved BMP measures from the most current
version of NCDOT Construction and Maintenance Activities manual such as sandbags, rock berms, cofferdams and other diversion
structures shall be used to prevent excavation in flowing water. [15A NCAC 02H.0506(b)(3) and (c)(3)]
12. Heavy equipment shall be operated from the banks rather than in the stream channel in order to minimize sedimentation and
reduce the introduction of other pollutants into the stream. [I 5A NCAC 02H.0506(b)(3)]
13. All mechanized equipment operated near surface waters must be regularly inspected and maintained to prevent contamination of
stream waters from fuels, lubricants, hydraulic fluids, or other toxic materials. [15A NCAC 02H.0506(b)(3)]
14. No rock, sand or other materials shall be dredged from the stream channel except where authorized by this certification. [15A NCAC
02H.0506(b)(3)]
North Carolina Department of Environmental Quality I Division of Water Resources
512 North Salisbury Street 11617 Mail Service Center I Raleigh, North Carolina 27699-1617
919.707.9000
DocuSign Envelope ID: B0184D08-387D-4FD8-9DF6-990E0695A677
15. Discharging hydroseed mixtures and washing out hydroseeders and other equipment in or adjacent to surface waters is prohibited.
[15A NCAC 02H.0506(b)(3)]
16. The permittee and its authorized agents shall conduct its activities in a manner consistent with State water quality standards (including
any requirements resulting from compliance with §303(d) of the Clean Water Act) and any other appropriate requirements of State and
Federal law. If the NCDWR determines that such standards or laws are not being met (including the failure to sustain a designated or
achieved use) or that State or federal law is being violated, or that further conditions are necessary to assure compliance, the NCDWR
may reevaluate and modify this certification. [ 15A NCAC 02B.0200]
17. A copy of this Water Quality Certification shall be maintained on the construction site at all times. In addition, the Water Quality
Certification and all subsequent modifications, if any, shall be maintained with the on -site project manager. [15A NCAC 02H .0507(c)
and 15A NCAC 02H .0506 (b)(2) and (c)(2)]
18. The outside wetland or water boundary located within the construction corridor approved by this authorization, including all non-
commercial borrow and waste sites associated with the project, shall be clearly marked by highly visible fencing prior to any land disturbing
activities. Impacts to areas within the fencing are prohibited unless otherwise authorized by this certification. [15A NCAC 02H.0501 and
.0502]
19. The issuance of this certification does not exempt the Permittee from complying with any and all statutes, rules, regulations, or
ordinances that may be imposed by other government agencies (i.e. local, state, and federal) having jurisdiction, including but not limited
to applicable buffer rules, stormwater management rules, soil erosion and sedimentation control requirements, etc.
20. The Permittee shall report any violations of this certification to the Division of Water Resources within 24 hours of discovery. [15A
NCAC 02B.0506(b)(2)]
21. Upon completion of the project (including any impacts at associated borrow or waste sites), the permittee shall complete and return
the enclosed "Certification of Completion Form" to notify the NCDWR when all work included in the 401 Certification has been
completed. [I5ANCAC 02H.0502(f)]
22. Native riparian vegetation (i.e., trees and shrubs native to your geographic region) must be reestablished in the riparian areas within
the construction limits of the project by the end of the growing season following completion of construction. [ 15A NCAC 02B.0506(b)(2)]
23. There shall be no excavation from, or waste disposal into, jurisdictional wetlands or waters associated with this permit without
appropriate modification. Should waste or borrow sites, or access roads to waste or borrow sites, be located in wetlands or streams,
compensatory mitigation will be required since that is a direct impact from road construction activities. [15A NCAC 02H.0506(b)(3) and
(c)(3)
24. Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and
operation and maintenance of such Best Management Practices in order to protect surface waters standards [15A NCAC 02H.0506(b)(3)
and (c)(3):
a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in
accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design
Manual.
b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they
equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control
Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including
contractor -owned or leased borrow pits associated with the project.
C. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in
accordance with the most recent version of the North Carolina Surface Mining Manual.
d. The reclamation measures and implementation must comply with the reclamation in accordance with the requirements of
the Sedimentation Pollution Control Act.
North Carolina Department of Environmental Quality I Division of Water Resources
512 North Salisbury Street 11617 Mail Service Center I Raleigh, North Carolina 27699-1617
919.707.9000
DocuSign Envelope ID: B0184D08-387D-4FD8-9DF6-990E0695A677
25. Sediment and erosion control measures shall not be placed in wetlands or surface waters, or within 5 feet of the top of bank, without
prior approval from DWR. [ 15A NCAC 02H.0506(b)(3) and (c)(3)]
26. When applicable, all construction activities shall be performed and maintained in full compliance with G.S. Chapter 113A Article 4
(Sediment and Pollution Control Act of 1973). Regardless of applicability of the Sediment and Pollution Control Act, all projects shall
incorporate appropriate Best Management Practices for the control of sediment and erosion so that no violations of state water quality
standards, statutes, or rules occur. [15A NCAC 02H .0506 {b)(3) and (c)(3) and 15A NCAC 02B .0200]
27. Design, installation, operation, and maintenance of all sediment and erosion control measures shall be equal to or exceed the
requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual, or for linear
transportation projects, the NCDOT Sediment and Erosion Control Manual.
All devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) sites, including contractor -owned or leased
borrow pits associated with the project. Sufficient materials required for stabilization and/or repair of erosion control measures and
stormwater routing and treatment shall be on site at all times.
For borrow pit sites, the erosion and sediment control measures shall be designed, installed, operated, and maintained in accordance
with the most recent version of the North Carolina Surface Mining Manual. Reclamation measures and implementation shall comply
with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act and the Mining Act of 1971. [15A
NCAC 02H.0506(b)(3) and (c)(3); GC 4135]
If you wish to contest any statement in the attached Certification you must file a petition for an administrative hearing. You may
obtain the petition form from the office of Administrative hearings. You must file the petition with the office of Administrative
Hearings within sixty (60) days of receipt of this notice. A petition is considered filed when it is received in the office of
Administrative Hearings during normal office hours. The Office of Administrative Hearings accepts filings Monday through Friday
between the hours of 8:00am and 5:00pm, except for official state holidays. The original and one (1) copy of the petition must be filed
with the Office of Administrative Hearings.
The petition may be faxed -provided the original and one copy of the document is received by the Office of Administrative Hearings
within five (5) business days following the faxed transmission.
The mailing address for the Office of Administrative Hearings is:
Office of Administrative Hearings
6714 Mail Service Center
Raleigh, NC 27699-6714
Telephone: (919) 431-3000, Facsimile: (919) 431-3100
A copy of the petition must also be served on DEQ as follows:
Mr. Bill F. Lane, General Counsel
Department of Environmental Quality
1601 Mail Service Center
North Carolina Department of Environmental Quality I Division of Water Resources
512 North Salisbury Street 11617 Mail Service Center I Raleigh, North Carolina 27699-1617
919.707.9000
DocuSign Envelope ID: B0184D08-387D-4FD8-9DF6-990E0695A677
This letter completes the review of the Division of Water Resources under Section 401 of the Clean Water Act. If you have any
questions, please contact Rob Ridings at 919-707-3873.
Sincerely,
DocuSigned by:
ll Y�II 4,(,L�141:A i�.
9C9 86312=474_.
Linda ulpepper, Director
Division of Water Resources
Electronic copy only distribution:
James Lastinger, US Army Corps of Engineers, Raleigh Field Office
Jonathan Hefner, PE, Wetherhill Engineering
File Copy
North Carolina Department of Environmental Quality I Division of Water Resources
512 North Salisbury Street 11617 Mail Service Center I Raleigh, North Carolina 27699-1617
919.707.9000
DocuSign Envelope ID: B0184D08-387D-4FD8-9DF6-990E0695A677
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
LINDA CULPEPPER
Director
NORTH CAROLINA
Environmental Quality
NCDWR Project No.:
Applicant:
Project Name:
County:
Date of Issuance of 401 Water Quality Certification:
Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and
any subsequent modifications, the applicant is required to return this certificate to the 401 Transportation Permitting
Unit, North Carolina Division of Water Resources, 1617 Mail Service Center, Raleigh, NC, 27699-1617. This form
may be returned to NCDWR by the applicant, the applicant's authorized agent, or the project engineer. It is not
necessary to send certificates from all of these.
Applicant's Certification
I, , hereby state that, to the best of my abilities, due care and diligence
was used in the observation of the construction such that the construction was observed to be built within substantial
compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and
specifications, and other supporting materials.
Signature:
Agent's Certification
Date:
I, , hereby state that, to the best of my abilities, due care and diligence
was used in the observation of the construction such that the construction was observed to be built within substantial
compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and
specifications, and other supporting materials.
Signature:
Engineer's Certification
Partial Final
Date:
I, , as a duly registered Professional Engineer in the State of North
Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project for the
Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the
construction such that the construction was observed to be built within substantial compliance and intent of the 401
Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials.
Signature
Date
Registration No.
D E Q�� North Carolina Department of Environmental Quality I Division of Water Resources