HomeMy WebLinkAbout19950165 Ver 1_COMPLETE FILE_19950214State of North Carolina
Department of Environment,
Health and Natural Resources
Division of Coastal Management
James B, Hunt, Jr., Governor
Jonathan B. Howes, Secretary
Roger N, Schecter, Director
?0 9 5 ??5
ED E H N F=
February 3, 1995 WASH NGC ON OFFICE
FFR 0 71995
MEMORANDUM: D. E M.
TO: Mr. A. Preston Howard, P.E., Director -
Division of Environmental Management
FROM: John R. Parker, Jr.
Major Permits Processing Coordinator
SUBJECT: CAMA/DREDGE & FILL Permit Application Review
Applicant: Weyerhaeuser Paper Company
Project Location: @ the Weyerhaeuser docks, on the Neuse river, SE of NC Hwy. 43, Streets Ferry,
Craven County
Proposed Project: to install pilings for floating containment boom
Please indicate below your agency's position or viewpoint on the proposed project and return this form by
February 24, 1995. If you have any questions regarding the proposed project, please contact Jim Mercer at
(919) 726-7021. When appropriate, in-depth comments with supporting data is requested.
REPLY: Z \_ This agency has no objection to the project as proposed.
This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes are
incorporated. See attached.
This agency objects to the project for reasons described in the attached comments.
SIGNED (_ ")6? hp?? DATE 3 IS? l
P.O. Box 769, 3441 Arendell St„ Morehead City, North Carolina 28557 Courier X11-12-09
Telephone 919-726-7021 FAX 919-247-3330
An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post-consumer paper
To: John Dorney
Planning Branch
DIVISION OF ENVIRONMENTAL MANAGEMENT "°-
WEiLAA+C+;:
CAMA/COE PERMIT APPLICATION REVIEW
WaRO PROJECT # ` S d g2- WQ SUPERVISOR: THOIWE
REVIEWER: SAWYER DATE: 3 /,r,3 /r S
WETLAND INFORMATION FOR CENTRAL OFFICE TRACKING
PERMIT YR: 92 PERMIT NO.: COUNTY:
PROJECT NAME: (;:" a?) .
PROJECT TYPE: _PERFQT TYPE: .A COE
COE
RCD FROM CDA: DCM DATE FROM CDA:
REG OFFICE: WaRO RIM AND SUB BASIN
STREAM OR ADJACENT WATER BODY:
CLASS : S STREAM INDEX
OPEN GLOSF4W
WL IMPACT: /\1 WL TYPE:
WL REQUESTED: WL ACR BST:
HYDRO CNECT?: WL SCORE:
MITIGATION: MITIGATION TYPE:
MITIGATION SIZE. TING SHEET ATTACHED?
RECOMMENDATION: -4_SSw ISSUE/COND DENY HOLD
STORMWATER PLAN REQ'D: IF YES, DATE APPROVED: ? ""--""
PROJECT DESCRI_ITION:
WATER QUALITY CERT. (401
CERT. REQ'D:
IF YES, TYPE:
SEWAGE DISPOSAL
TYPE OF DISPOSAL PROPOSED:
(EXISTING, PROPOSED, SEPTIC TANK ETC.)
TO BE PERMITTED BY:
(DEM, DHS, COUNTY)
IF BY DEM, IS SITE AVAILABLE AND PERMIT ISSUANCE PROBABLE:
WATER/WETLAND FILL
AREA OF FILL: WATER: - WETLAND:
IS FILL ELIMINATING A SIGNIFICANT USE?
DREDGING
AREA TO BE DREDGED: ADr--p
IS DREDGING ACTIVITY EXPECTED TO CAUSE A SIGNIFICANT LOSS OF
RESOURCE?
IS SPOIL DISPOSAL ADEQUATELY ADDRESSED?
MARINA
ARE THE FOLLOWING ADEQUATELY ADDRESSED?
SEWAGE DISPOSAL: MARINA SERVICES:
OXYGEN IN BASIN: CLOSURE OF SHELLFISHING WATERS:
CC: WaRO; Central Files; DCM Field Offices; COE Washington Office
DIVISION OF !MO,21ENT,4L,MANAGEMENT
!MEMORANDUM
• T0: Bill Moore, Environmental Engineer
Water Quality Section, WaRO
FROM: Deborah Sawyer, Environmental Technician
Water Quality Section, WaRO
SUBJECT: Dredge and Fill Reviews for Stormwater Review
Project: :
Project No.: ?---
Date Received:
F'nAt Date Comment: Description of Project:
5c42_ A#roLa,4ked
Comments:
7
DIVISION OF COASTAL MANAGFAWM
FIELD ENVESTIGATION REPORT
1. APPLICANT'S NAME: Weyerhaeuser Paper Company
2. a LOCATION OF PROJECT SITE: At the Weyerhaeuser docks on the Neuse River SE of NC 43,
Streets Ferry, Craven County.
Photo Index - 1989: Strip #128 Frame #31 @ I-14
State Plane Coordinates - X: 2561400 Y: 536000
USGS 7.5 min. Topographic Map "Askin"
3. INVESTIGATION TYPE: CAMA (ONLY)
4. INVESTIGATIVE PROCEDURE: Dates of Site Visit - Spring 1994
Was Applicant Present - YES
5. PROCESSING PROCEDURE: Application Received - 21 January 1995
Office - Morehead City
6. SITE DESCRIPTION:
(A) Local Land Use Plan - Craven Co. LUP Up-Date 1992
Land Classification From LUP - Rural / Conservation
(B) AEC(s) Involved: Estuarine Waters, Public Trust
(C) Water Dependent: YES
(D) Intended Use: Commercial
(E) Wastewater Treatment: Existing - N/A
Planned - N/A
(F) Type of Structures: Existing - 6 PVC piling
Planned - Retain 6 PVC piling
(G) Estimated Annual Rate of Erosion: N/A
Source - Natural Shoreline / N/A
7. HABITAT DESCRIPTION:
[AREA]
DREDGED FILLED
ra.,.
r
f
OTHER
(A) Vegetated Wetlands
NONE
(B) Non-Vegetated Wetlands Footprint
Neuse River / Surface Water 8,000 sq. ft.
(C) Other
NONE
(D) Total Area Disturbed: Approximately 10,000 square feet.
(E) Primary Nursery Area: NO
(F) Water Classification: 'SC' Open: NO
8. PROJECT SUMMARY: Weyerhaeuser is seeking Major CAMA authorization to permanently retain
the installation of 6 PVC pilings that create an 800 foot long mooring that supports a floating
containment boom about 10 ft. from the shoreline.
FIELD INVESTIGATION REPORT:
WEYERHAEUSER PAPER COMPANY
PAGE #2
a ---------------------------
9. NARRATIVE DESCRIPTION: The project site is located on the Neuse River just
south east of the SR #1400 / NC 43 bridge at the fuel docks operated by the
Weyerhaeuser Paper Company in Craven County.
In September of 1994 the Division of Coastal Management issued Weyerhaeuser a
General Permit, #13174, that allowed the temporary installation of 8 PVC pilings int
the Neuse River pursuant to the special conditions found in General Permit 711.1900.
The series of 6 PVC pilings that where installed, act as an anchorage for the oil
containment boom. As the workplat drawing shows, the line of PVC pilings and the
associated boom follows the shoreline in a parallel fashion for about 800 feet. The
series of pilings and the associated boom are off-set from the natural shoreline and the
normal water level by some 10 feet. The floating boom is deployed around vessels at
the dock while fuel is unloaded.
The General Permit issued to Weyerhaeuser expires in March of 1995. It is a
requirement of the General Permit to remove the temporary structures associated with
the original project. Therefore, the current Major CAMA proposal submitted by
Weyerhaeuser seeks permanent authorization for the existing 6 PVC pilings that make
up the mooring apparatus for the floating oil boom. It is apparent from a careful
review of the project plans that no significant changes will be made to the existing
structure.
10. ANTICIPATED 51PACTS: The proposed project will generate a footprint of
approximately 8,000 sq. ft. on the Public Trust waters of the Neuse River. As the
workplat drawings show, the series of 6 PVC pilings in association with the floating
boom will create an alignment about 800 feet long running parallel to the shoreline at a
distance of 10 feet waterward of the normal water level. The Estuarine surface waters
in and around the project site are classified as SC.
PREPARED BY: JAMES L. MERCER
DATE: 2 FEBRUARY 1995
Please type or print. Carefully describe all anticipated
development activities, including construction, excava-
tion, filling, ,paving, land clearing, and stormwater con-
trol. If the requested information is not relevant to your
project, write N/A (not applicable). Items 1-4 and 8-9
must be completed for all projects.
1 APPLICANT
a. Name WEYERHAEUSER PAPER COMPANY
Address PO BOX 1391
City NEW BERN State NC
Zip 28563 Day phone (919) 633-7100
X Landowner or Authorized agent
b. Project name (if any) ni 1 Bnnm
Barrier Pnsts
c. If the applicant is not the landowner, also give the
owner's name and address.
sPc
2 S? / Ym 536 O?O
2 LOCATION OF PROPOSED
PROJECT
a. Street address or secondary road number
SE of NC 43
If you plan to build a marina, also complete and
attach Form DCM-MP-2.
b. Is the proposed activity maintenance of an
existing project, new work, or both?
No new work proposed
c. Will the project be for community, private, or
commercial use?
private/industrial
d. Describe the planned use of the project.
The pvc pipes will keep a permanent oil
boom out of the stumps along the shoreline
and make it more accessible for placement
around barge during unloading operations
4 LAND AND WATER
CHARACTERISTICS
a. Size of entire tract NA
b. Size of individual lot(s) N/A - NONE
c. Elevation of tract above mean sea level or
National Geodetic Vertical Datum
N/A
d. Soil type(s) and texture(s) of tract
e. Vegetation on tract _ N/A
b. City, town, community, or landmark
STREETS FERRY f. Man-made features now on tract Rama, Pier, PVC Pipes
c. County CRAVEN g. What is the CAMA Land Use Plan Classification of
d. Is proposed work within city limits or planning the site? (Consult the local land use plan.)
jurisdiction? NO X Conservation Transitional
e. Name of bod of water nearest project Developed Community
NEUSE RIVER Rural Other
3 DESCRIPTION AND PLANNED USE
OF PROPOSED PROJECT
a. Describe all development activities you propose (for
example, building a home, motel, marina, bulkhead,
or pier). Propose to change status of PVC
nine installed under CAMA permit no. 13174
from temnorarv tD-lDermanent structure by
filling pipe piles with concrete and
reinforcing
3/91
h. How is the tract zoned by local government?
Estuarine
i. How are adjacent waters classified?
SC
j. Has a professional archaeological survey been
carried out for the tract? NO If so, by whom?
IIi
5 UPLAND DEVELOPMENT
Complete this section if the project includes any land
dellopment.
a. Type and number of buildings, facilities, or
structures proposed N/A - NONE
b. Number of lots or parcels N/A
c. Density (Give the number of residential units and the
units per acre.) N/A
d. Size of area to be graded or disturbed
N/A - NONE
C.
f. Give the percentage of the tract within 75 feet of
mean high water to be covered by impermeable
surfaces, such as pavement, buildings, rooftops.
N/A
g. List the materials, such as marl, paver stone, asphalt,
or concrete, to be used for paved surfaces.
m. Water supply source N/A
n. If the project is oceanfront development, describe
the steps that will be taken to maintain established
public beach accessways or provide new access.
N/A
o. If the project is on the oceanfront, what will be the
elevation above mean sea level of the first habitable
floor? N/A
6 EXCAVATION AND FILL
INFORMATION
a. Describe below the purpose of proposed excavation
or fill activities (excluding bulkheads, which are
covered in Section 7).
Access channel
(MLW) or (NWL)
Boat basin
h. If applicable, has a stormwater management plan
been submitted to the Division of Environmental
Management? N/A
i. Describe proposed sewage disposal and/or waste
water treatment facilities.
j. Have these facilities received state or local approval?
N/A
k. Desc?ftexisting treatment facilities.
1. Describe location and type of discharges to waters of
the state (for example, surface runoff, sanitary
wastewater, Mustrial/commercial effluent, "wash
down").
If the proposed project will disturb more than one
acre of land, the Division of Land Resources must
receive an erosion and sedimentation control plan at
least 30 days before land disturbing activity begins.
If applicable, has a sedimentation and erosion
control plan been submitted to the Division of Land
Resources? N/A
Other (break-
water, pier,
boat ramp,
rock jetty)
Fill placed in
wetland or below
MHW
Upland fill
areas
Length Width Depth
N/A
b. Amount of material to be excavated from below
water level in cubic yards N/A - None
c. Type of material N/A
d. Does the area to be excavated include marshland,
swamps, or other wetlands?
N/A . - NONE
e. High ground excavation, in cubic yards
N/A - NONE
n '} In 1
f. Dimensions of spoil disposal area c. Shoreline erosion during preceding 12 months, in
N/A feet N/A
g. Location of spoil disposal area N/A d. Type of bulkhead material N/A
h. Do you claim title to the disposal area? N/A
If not, attach a letter granting permission from the
owner.
i. Will a disposal area be available for future
maintenance? N/A
If so, where?
j. Does the disposal area include any marshland,
swamps, Aps, or water areas?
k. Will the fill material be placed below mean high
water? N/A
1. Amount of fill in cubic yards N/A
m. Type of fill material N/A
n. Source of fill material N/A
o. Will fill material be placed on marsh or other
wetlands? N/A
p. Dimensions of the wetland to be filled
N/A
q. How will excavated or fill material be kept on site
and erosion controlled?
N/A
r. What type of construction equipment will be used
(for example, dragline, backhoe, or hydraulic
dredge)? N/A
s. Will wetlands be crossed in transporting equipment
to project site? If yes, explain steps that will
be taken to lessen environmental impacts.
N/A
7 SHORELINE STABILIZATION
a. Length of bulkhead or riprap N/A - None
b. Average distance waterward of mean high water or
norm al water level N/A
3/91
e. Amount of fill, in cubic yards, to be placed below
mean high water N/A
f. Type of fill material N/A
8 ADDITIONAL INFORMATION
In addition to the completed application form, the follow-
ing items must be submitted:
A copy of the deed (with state application only) or other
instrument under which the applicant claims title to the
affected property. If the applicant is not claiming to be
the owner of said property, then forward a copy of the
deed or other instrument under which the owner claims
title, plus written permission from the owner to carry out
the project.
An accurate work plat (including plan view and cross
sectional drawings) drawn to scale in black ink on an 8
1/2 x I 1 white paper. (Refer to Coastal Resources
Commission Rule 7J.0203 for a detailed description.)
Please note that original drawings are preferred and
only high quality copies will be accepted. Blue-line
prints or other larger plats are acceptable only if 18 high
quality copies are provided by applicant. (Contact the
U.S. Army Corps of Engineers regarding that agency's
use of larger drawings.) A site or location map is a part
of plat requirements and it must be sufficiently detailed
to guide agency personnel unfamiliar with the area to the
site. Include county road (SR) numbers, landmarks, and
the like.
A stormwater management plan, if applicable, that
may have been developed in consultation with the
Division of Environmental Management.
A list of the names and complete addresses of the
adjacent waterfront (riparian) landowners. These
individuals have 30 days in which to submit comments
on the proposed project to the Division of Coastal
Management and should be advised by the applicant of
that opportunity. 0rPMrr7,r-,
JAN 3 1 1.95
Name Archie Hankins NC DOT
Address PO BOX 25201
Raleigh, NC 27611
Narr'r Calvin Hawks
Address PO Box 1203
New ern, NC 28563
Name A.J. Ballard
Address PO Box 1203
New Bern, NC 2 5 3
A list of previous state or federal permits issued for
work on the project tract. Include permit numbers,
permittee, and issuing dates.
CAMA General Permit #13174
A check for $250 made payable to the Department of
Environment, Health, and Natural Resources to cover
the costs of processing the application.
A signed AEC hazard notice for projects in oceanfront
and inlet areas.
A statement on the use of public funds. If the project
involves the expenditure of public funds, attach a state-
ment documenting compliance with the North Carolina
Environmental Policy Act (N.C.G.S. 113A-1 to 10).
9 CERTIFICATION AND PERMISSION
TO ENTER ON LAND
Any permit issued in response to this application will
allow only the development described in the application.
The project will be subject to conditions and restrictions
contained in the permit.
I certify that to the best of my knowledge, the proposed
activity complies with the State of North Carolina's ap-
proved Coastal Management Program and will be con-
ducted in a manner consistent with such program.
I further certify that I am authorized to grant, and do in
fact, grant permission to representatives of state and
federal review agencies to enter on the aforementioned
lands in connection with evaluating information related
to this permit application and follow-up monitoring of
project.
This is the 27 day of January '19-95.
?
Landowner or Authorized agent
4 3/91
a
6
PVG Pipe 5tanJard5,
Six total. /
Ntvc? E R\\46 5
Existing `?,horehne (approx)
Timber Pile Dolphin
Pier
4
r1
sr1Arswes-sen M w wwwenwme
North lAp?rpxl
VPNC®GRO
0
l?
WEYERHAEUSER
NEUSE RNER RLANT O
'
?
WEYEKHAEUSEK GOMPANY
PD Box 13tH Ncw Bern, NO
SITE PLAN
" Q? Boam .... .
O
r• eMD CTON
J
?hwdn.,i `we IALAlkm
.e.e..ero ...e' wv... ?T.....y
'
LOGeT1
M RMI
5GALE PATE- DRWN BY: G-KP BY'. DRAWING N*,MFZ
f •100' 27 JAN. W95 PJW rEW
W ?
}
W
JAN 3 1 SiZ-5 'ill
Mwwrrrwrwr?••rwrrw••wrhwww