HomeMy WebLinkAbout19951198 Ver 1_COMPLETE FILE_19970805State of North Carolina
Department of Environment,
Health and Natural Resources
Division of Water Quality
James B. Hunt, Jr., Governor
Wayne McDevitt, Secretary
A. Preston Howard, Jr., P.E., Director
LT.R;TA
AA k I*
?EHNR
August 25, 1997
Cabarrus County
WQC 401 Project #951198
APPROVAL of 401 Water Quality Certification
City of Concord
Mr. George T. Lowder
Director of Engineering & Water Resources
P.O. Box 308
Concord, NC 28026
Dear Mr. Lowder.
You have our approval, in accordance with the attached conditions, to place fill material in 1/2 - 3/4 acres of
wetlands or waters for the purpose of installing new sewer lines and interceptors for the Westside annexation
project, as you described in your application dated 30 October 1995 and 4 August 1997. After reviewing your
application, we have decided that this fill is covered by General Water Quality Certification Number 3101. This
Certification allows you to use Nationwide Permit Number 12 when it is issued by the Corps of Engineers. In
addition, you should get any other federal, state or local permits before you go ahead with your project including
(but not limited to) Sediment and Erosion Control, Coastal Stormwater, Non-Discharge and Water Supply
Watershed regulations. Also this approval will expire when the accompanying 404 or CAMA permit expires
unless otherwise specified in the General Certification.
This approval is only valid for the purpose and design that you described in your application. If you change
your project, you must notify us and you may be required to send us a new application. If total wetland fills for
this project (now or in the future) exceed one acre, compensatory mitigation may be required as described in 15A
NCAC 2H .0506 (h). For this approval to be valid, you must follow the conditions listed in the attached
certification.
If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing.
You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition
which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative
Hearings, P.O. Box 27447, Raleigh, N.C. 27611-7447. This certification and its conditions are final and
binding unless you ask for a hearing.
This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water
Act. If you have any questions, please telephone John Dorney at 919-733-1786.
Sincerely,
1
eston Ho d, Jr. P.E.
Attachment
cc: Wilmington District Corps of Engineers
Corps of Engineers Asheville Feld Office
Mooresville DWQ Regional Office
Mr. John Domey
Central Files
Jeff Davis; Black & Vetch
951198.1tr
Division of Water Quality • Environmental Sciences Branch
Environmental Sciences Branch, 4401 Reedy Creek Rd., Raleigh, NC 27607 Telephone 919-733-1786 FAX # 733-9959
An Equal Opportunity Affirmative Action Employer - 50% recycled/10% post consumer paper
t
BLACK & VEATCH 9
8604 Cliff Cameron Drive, Suite 164, Charlotte, North Carolina 28269, J7041 548-8461, Fax: J704f 548-8640
City of Concord, North Carolina
Westside Annexation Project
B&V Project 27460.600
B&V File 8G-1.1
August 4, 1997
Mr. Steve Chapin
U. S. Army Corps of Engineers
Wilmington District
Regulatory Field Office
151 Patton Avenue, Room 143
Asheville, North Carolina 28801-5006
Dear Mr. Chapin:
As discussed in a recent telephone conversati are adding one river crossing
of the Rocky River to the scope of our pr, ect. As ou are aware, the project was
previously permitted under Permit No. 9600531 ( EM Project No. 9511.98).
We would like to modify our existing p rmit to inc de this crossing and have
included the following information for ur use
1. Three copies of the construction contract drawing showing the
crossing.
2. Three copies of a vicinity map showing the crossing's location.
3. One copy of our original permit.
A copy of the above information is also being sent to Mr. John Dorney at
NCDEHNR for confirmation.
Very truly yours,
WAP9/jhb
BLACK & VEATCH LLP
i
Jeff Davis
Enclosures
T.-
cc: "him Lowder, City of Concord 55
, a,) m
John Dorney, NCDEHNR (w/enclosures) - Ln m
Sid Riddick, McKim & Creed
L
0
n)
up
State of North Cac.na
Department of Environment,
Health and Natural Resources
Division of Environmental Management
James B. Hunt, Jr., Governor
Jonathan B. Howes, Secretary
A. Preston Howard, Jr., P.E., Director
APPROVAL of 401 Water Quality Certification
City of Concord
Mr. George T. Lowder
Director of Engineering & Water Resources
P. O. Box 308
Concord, N.C. 28026
Dear Mr. Lowder:
%d C-) j
Dow s
?o
4 • ?1 0
P?
AOM%
1:3 FE F1
November 20, 1995
Cabarrus County
DEM Project # 951198
You have our approval to place fill material in 1/2 - 3/4 acres of wetlands or waters for the
purpose of installing new sewer lines and interceptors for the Westside annexation project, as you
described in your application dated 30 October 1995. After reviewing your application, we have
decided that this fill is covered by General Water Quality Certification Number 3022. This certification
allows you to use Nationwide Permit Number 12 when it is issued by the Corps of Engineers.
This approval is only valid for the purpose and design that you described in your application. If
you change your project, you must notify us and you may be required to send us a new application.
For this approval to be valid, you must follow the conditions listed in the attached certification. In
addition, you should get any other federal, state or local permits before you go ahead with your
project.
If you do not accept any of the conditions of this certification, you may ask for an adjudicatory
hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing,
send a written petition which conforms to Chapter 150B of the North Carolina General Statutes to the
Office of Administrative Hearings, P.O. Box 27447, Raleigh, N.C. 27611-7447. This certification and
its conditions are final and binding unless you ask for a hearing.
This letter completes the review of the Division of Environmental Management under Section 401
of the Clean Water Act. If you have any questions, please telephone John Domey at 919-733-1786.
Attachment
cc: Wilmington District Corps of Engineers
Corps of Engineers Asheville Field Office
Mooresville DEM Regional Office
Mr. John Domey
Central Files
Brent Reuss/Jeff Davis; Black & Vetch
Sinc ly,
Piton Ho , Jr.
n?dga?7glJ
l111
NOV 22 1995
BLACK & VEATCH
951198.1tr
P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-7015 FAX 919-733-2496
An Equal opportunity Affirmative Action Employer 50% recycled/ 10% post-consurner paper
Action Id. 1996005 31
County Cabarrus
GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION
Property owner City of Concord, Engineering Dept.
Address
P.O. Box 308
Concord, NC 28025
Telephone No.
Size and Location of project (water body, road name/number, town, etc.)
Westside Annexation Project, Design Areas 1-0, near Concord; RB = Pee Dee
Description of Activity Installation of approx. 300,000 if of 8-inch and 12-inch sewer line
and approx. 85,000 if of water line; some of the lines will be installed in the
floodplain areas of Rocky R., Coddle Cr., Irish Buffalo Cr., and tribs. Will result
in approx. 3/4 acre of wetland and stream channel impact. Constr. corr. thru
Applicable Law: x Section 404 (Clean Water Act, 33 U.S.C. 1344) Wetlands = 40 ft. max.
(check all that apply) Section 10 (River and Harbor Act of 1899).
Authorization: Regional General Permit Number.
12 Nationwide Permit Number.
Your work is authorized by this Regional General (RGP) or Nationwide Permit (NWP) provided it is accomplished
in strict accordance with the attached conditions and your submitted plans. If your activity is subject to Section
404 (if Section 404 block above is checked), before beginning work you must also receive a Section 401 water
quality certification from the N.C. Division of Environmental Management, telephone (919) 733-1786. For any
activity within the twenty coastal counties, before beginning work you must contact the N.C. Division of Coastal
Management, telephone (919) 733-2293.
Please read and carefully comply with the attached conditions of the RGP or NWP. Any violation of the conditions
of the RGP or the NWP referenced above may subject the permittee to a stop work order, a restoration order, and/or
appropriate legal action.
This Department of the Army RGP or NWP verification does not relieve the permittee of the responsibility to obtain
any other required Federal, State, or local approvals/permits. The permittee may need to contact appropriate State
and local agencies before beginning work.
If there are any questions regarding this authorization or any of the conditions of the General Permit or Nationwide
Permit, please contact the Corps Regulatory Official specified below.
Date 12/4/95
Corps Regulatory Official steve Chapin Telephone No. 271-4014
Expiration Date of Verification 1/21/97
U.S. ARMY CORPS OF ENGIN• RS
WILMINGTON DISTRICT
SURVEY PLATS, FIELD SKETCH, WETLAND DELINEATION FORMS, PROJECT PLANS, ETC., MUST
BE ATTACHED TO THE YELLOW (FILE) COPY OF THIS FORM, IF REQUIRED OR AVAILABLE.
CESAW Form 591
Fewsed July 1995
w X575 ? ? A---?c-rA???
R? ?
State of North Carolina
Department of Environment,
Health and Natural Resources
Division of Environmental Management
James B. Hunt, Jr., Governor
Jonathan B. Howes, Secretary
A. Preston Howard, Jr., P.E., Director
APPROVAL of 401 Water Quality Certification
City of Concord
Mr. George T. Lowder
Director of Engineering & Water Resources
P. O. Box 308
Concord, N.C. 28026
Dear Mr. Lowder:
, fflM.;;A1
40
T7
ID F= F=1
November 20, 1995
Cabarrus County
DEM Project # 951198
F ILE: ? , .
You have our approval to place fill material in 1/2 - 3/4 acres of wetlands or waters for the
purpose of installing new sewer lines and interceptors for the Westside annexation project, as you
described in your application dated 30 October 1995. After reviewing your application, we have
decided that this fill is covered by General Water Quality Certification Number 3022. This certification
allows you to use Nationwide Permit Number 12 when it is issued by the Corps of Engineers.
This approval is only valid for the purpose and design that you described in your application. If
you change your project, you must notify us and you may be required to send us a new application.
For this approval to be valid, you must follow the conditions listed in the attached certification. In
addition, you should get any other federal, state or local permits before you go ahead with your
project.
If you do not accept any of the conditions of this certification, you may ask for an adjudicatory
hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing,
send a written petition which conforms to Chapter 150B of the North Carolina General Statutes to the
Office of Administrative Hearings, P.O. Box 27447, Raleigh, N.C. 27611-7447. This certification and
its conditions are final and binding unless you ask for a hearing.
This letter completes the review of the Division of Environmental Management under Section 401
of the Clean Water Act. If you have any questions, please telephone John Dorney at 919-733-1786.
Sinc ly,
ton Ho r , Jr.
Attachment
cc: Wilmington District Corps of Engineers
Corps of Engineers Asheville Field Office
Mooresville DEM Regional Office
Mr. John Domey
Central Files
Brent Reuss/Jeff Davis; Black & Vetch 951198.1tr
P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-7015 FAX 919-733-2496
An Equal Opportunity Affirmative Action Employer 50% recycled/ 1 096 post-consumer paper
BLACK & VEATCH
8604 Cliff Comeron Drive, suite 164, Charlotte, North Carolina 28269, (704) 548-8461, Fax (704) _548-8640
City of Concord, North Carolina
Westside Annexation Project
North Carolina Department of Environment,
Health and Natural Resources
4401 Reedy Creek Road
Raleigh North Carolina 27607
Attention: Mr. John Dorney
Gentlemen:
B&V Project 27460.100
B&V File A
November 6, 1995
Enclosed please find seven (7) copies of completed permit application
and associated documents for application of a 404 Permit for the
referenced project. These copies are being sent to your office at the
request of Mr. Steve Chapin of the U.S. Army Corps of Engineers,
Asheville, NC, office, (704) 271-4014. Additionally, three (3) copies
of the application have been sent: to Mr. Chapin.
We would appreciate your concurrence on the issuance of a 404 Permit for
this project. Please contact Brent Reuss or Jeff Davis at. (704) 548-8461
should you require further information.
I
Very truly yours,
BLACK & VEATCH
ff Davis
WAP/jhb
Enclosures
cc: lim Lowder
b ??
DEM ID: 7 l? ACTION ID:
Nationwide Permit Requested (Provide Nationwide Permit #); 7i
JOINT FORM FOR
Nationwide permits that require notification to the Carps of Engineers
N.gtionwide permits that require application for Section 401 certification
401
?SS?F
Q
I pr
.. , W 14
PLEASE PRINT.
?1. Owners Name: City of Concord, North Carolina, Contact: Tim Lowder, City Engineer.
?2. Owners Address: P. 0. Box 308, 66 Union Street, Concord, North Carolina 28025
?3. Owners Phone Number (Home): (Work): (704) 786-6161
?4. If Applicable: Agent's name or responsible corporate official, address, phone number:
Black & Veatch
8604 Cliff Cameron Drive, Suite 164
Charlotte, NC 28269 Contacts: Brent Reuss/Jeff Davis
? 5. Location of work (MUST ATTACH MAP). County:
Nearest Town or City: Concord
Cabarrus
Specific Location (Include road numbers, landmarks, etc.): Design Areas 1-8, See attached map.
?6. Name of ClosestStream/River: Rocky River, Coddle Creek, Irish Buffalo Creek, & Tributaries
7. River Basin:
? 9. Have any Section 404 permits been previously requested for use on this property?
YES [ ] NO [X I
If yes, explain.
? 11. Number of acres of waters of the U.S., including wetlands, impacted by the proposed project:
2-.;? Q„d /0- s-f -e- a4"„e-Filled: 112 - 3/4
Drained:
Flooded:
Excavated:
8. Is this project located in a watershed classified as Trout, SA, HQW, ORW, WS I, or WS H? YES [ ] NO [ ]
Total Impacted:
VU,? ?mpe??n t i
r"r, 6e h 4e1d d r„?,.? n lo/ v/ 12. Description of proposed work (Attach PLANS 8 1/2" X 11" drawinQS orily): See attached plans of
stream crossing, trench detail, temporary construction easement, and specifications
for seeding and mulching.
? 13. Purpose of proposed work: Install new sewer lines and interceptor
.
14. State reasons why the applicant believes that this activity must be carried out in wetlands. Also, note measures
taken to minimize wetland impacts.
15. You are required to contact the U.S. Fish and Wildlife Service (USFWS) and/or National Marine Fisheries Service
(NMFS) regarding the presence or any Federally listed or proposed for listing endangered or threatened species or critical
habitat in the permit area that may be affected by the proposed project. Have you done so? YES [ ] NO[
)
RESPONSES FROM THE USFWS AND/OR NMFS SHOULD BE FORWARDED TO CORPS.
16. You are required to contact the State Historic Preservation Officer (SHPO) regarding the presence of historic
properties in the permit area which may be affected by the proposed project? Have you done so? YES[ ] NO [ ]
RESPONSE FROM THE SHPO SHOULD BE FORWARDED TO CORPS.
17. Additional information required by DEM:
A. Wetland delineation map showing all wetlands, streams, and lakes on the property.
B. If available, representative photograph of wetlands to be impacted by project.
C. If delineation was performed by a consultant, include all data sheets relevant to the placement of the
delineation line.
D. If a stormwater management plan is required for this project, attach copy.
E. What is land use of surrounding property?
F. If applicable, what is proposed method of sewage disposal?
? k- II i 95
Owner's Signature Date
4
Z
C W
U
? x
W
f
? Qr
v ? ?..
z
c
c
L`
G
L
G
F-
W•
O W C
0]
ND
It -
or c
LL
CL. C
cc _1
C:?':.; V
I V.
CL Ir Q
O 0-1
Of zC:
JQQ
?L
V
7
ly
6
J
W
V
z
F?1
W
Cl)
0
N U
NW
r?
V J
w
J
Q
U
U)
O
Z
TABLE OF EMBEDMENT
DEPTHS BELOW PIPE
0 2
D
MIN -
-
MIN
SOIL ROCK
27" & SMALLER 3" 6'
30' TO 60' 4" g"
66" & LARGER 6' 12"
REINFORCING STEEL
X -i z M WHEN REQUIRED
Z ?1 1/4 Bc o
z
Bc+ 8" MIN z
(oz
co 7
r-.
z
w
?•
w ENCASEMENT
co : MAY BE
w PLACED TO
FULL
TRENCH
WIDTH
CLASS A
ARCH ENCASEMENT
_z t)
CC) w
?0
z
G l_.?A'? ? 13
El'-IF,?VT'TENT
To
U?7 ?-
i
CLASS B
z
w
0
w
co
m
w
C;LA55 C
NOTES:
1. GRANULAR EMBEDMENT MATERIAL SHALL
BE CRUSHED ROCK, PEA GRAVEL COARSE
AGGREGATE SIZE NUMBER 57. EMBEDMENT
MATERIAL SHALL BE PLACED IN LAYERS
NOT MORE THAN 6" DEEP AND COMPACTED
AS SPECIFIED.
2. HAND PLACED EMBEDMENT SHALL BE
COMPACTED FINELY DIVIDED MATERIAL
FREE FROM DEBRIS AND STONES.
3. EMBEDMENT ABOVE THE TOP OF THE
PIPE SHALL BE AN UNCOMPACTED
LAYER FOR ALL INSTALLATIONS.
4. REFER TO SPECIFICATIONS FOR
GEOTECHNICAL FABRIC OR SPECIAL
EMBEDMENT REQUIREMENTS FOR
TRENCHES IN FINE SOILS EXTENDING
BELOW GROUNDWATER LEVEL.
5. TRENCH OUTLINES DO NOT INDICATE
ACTUAL TRENCH EXCAVATION SHAPE,
SOIL CONDITIONS, OR PRESENCE OF
SHEETING LEFT IN PLACE. EMBEDMENT
MATERIAL SHALL EXTEND THE FULL
WIDTH OF THE ACTUAL TRENCH
EXCAVATION.
LEGEND
Bc OUTSIDE DIAMETER OF PIPE
H COVER ABOVE TOP OF PIPE
D NOMINAL PIPE SIZE
0 EMBEDMENT BELOW PIPE (SEE TABLE)
171-1-71
HAND PLACED EMBEDMENT
GRANULAR EMBEDMENT
CONCRETE
z
w
w
m
ui
w
CLASS D
EMBEDMENTS FOR CONDUITS
cIT'y C:V-- (fc>?,lCo e-JOzrH CApc)'-t44 FIGURE 11
l1-39,5'
Section 02930 - SEEDING AND MULCHING
1. SCOPE. This section covers the operations necessary to produce
established grass covered areas, including preparations of the soil
surface, application of lime, seeding, compacting, mulching, watering,
and maintenance.
Areas to be seeded include all areas disturbed by construction
operations including grading, parking of equipment, trenching, or any
other operation that has destroyed the existing vegetative cover.
2. PERSONNEL AND EQUIPMENT. All work shall be performed by personnel
who are experienced and qualified in the work required, utilizing
equipment such as a fertilizer spreader; tilling equipment; cyclone
seeder, drill, or cultipacker type seeder; cultipacker or roller; mulch
blower or hydromulcher; and mulch puncher.
3. SUBMITTALS. The Contractor shall furnish to the Engineer in
duplicate a typed and signed statement which certifies that each
container of seed for use on this Project is fully labeled in accordance
with the Federal Seed Act and is at least equal to the requirements for
seed listed herein. This certification shall appear on or with all
copies of invoices for the seed. Each lot of seed shall be subject to
sampling and testing at the discretion of the Engineer. Sampling and
testing will be in accordance with the latest Rules and Regulations
under the Federal Seed Act and North Carolina seed laws.
4. MATERIALS.
4.01. Soil for Repairs. The soil used in repair work shall be of a
quality at least equal to that which exists in areas adjacent to the
area to be repaired. Soil shall be used that is free from tree roots,
clay balls, stones, and other materials that hinder grading, planting,
and maintenance operations and that is free from noxious and other
objectionable weed seeds and toxic substances.
4.02. Seed. Seed shall be certified seed labeled in accordance with
the U.S. Department of Agriculture Rules and Regulations under the
Federal Seed Act and shall comply with the State Seed Laws of North
Carolina. Seed shall be furnished in sealed, standard containers unless
written exception is granted.
Seed that is wet or moldy or that has been otherwise damaged in transit
or storage will not be acceptable. The seed shall be free of field
bindweed, hedgeweed, and nutgrass seed. The seed shall not contain
other noxious weed seed in excess of the limits allowable under the
Federal Seed Act.
Samples of all seed used shall have been tested within 9 months prior to
seeding by a legally authorized seed testing laboratory.
C(7,y c? cn=,j?al NcxxTN CAPM-,^4
WSACC 02930 ?? 3TsipE A"-'AA cc-J f7g?>31c ?
Std Spec -1-
Latest Revision 9/15/95
4.03. Lime. Lime shall be ground dolomitic limestone passing a 10 mesh
sieve with at least 50 percent passing a 100 mesh sieve.
4.04. Fertilizer. Fertilizer shall be delivered in standard size bags
of the manufacturer, showing weight, analysis, and the name of the
manufacturer. If the fertilizer is not used immediately after delivery,
it shall be stored in a dry place in such a manner that its
effectiveness will not be impaired.
4.05. Mulch. Mulch?fo'r application to seedbed areas shall include
threshed straw of oats, wheat, barley, rye, or wood cellulose fiber.
Straw mulch shall be' baled, dry, unweathered, and show no signs of
discoloration and mold damage.
A minimum of 50 percent of weight of the herbage making up the material
shall be 10 inches in length or longer. Mulch material containing an
excessive amount of weed and crop seeds will not be acceptable.
Wood cellulose fiber mulch shall be "Hydro Mulch 2000" as manufactured
by Conwed Corporation or similar wood fiber mulch containing an organic
mulch binder.
A weight certificate for each load of mulch delivered to the site shall
be furnished to the Engineer at the time of delivery.
5. CONSTRUCTION.
5.01. Time and Conditions for Seedin?,. The work shall not be started
until substantially all earthwork has been completed in the area to be
seeded. Backfills and fills shall be allowed to settle and the topsoil
spread and finish grading completed immediately before the work is
started. Seeding shall be performed within 30 days after the completion
of clearing and grubbing unless otherwise noted on the drawings or if
permission is given otherwise.
Seeding and fertilizing shall not be done during periods of severe
drought, high winds, excessive moisture, or frozen ground as determined
by the Engineer, so that unsatisfactory results are not likely to be
obtained.
Seeding shall be performed according to Table 1 in this section.
5.02. Clearing,. Prior to grading and tilling, vegetation- that may
interfere with operations shall be mowed, grubbed, and raked. The
collected material shall be removed from the site. The surface shall be
cleared of stumps, stones larger than 6 inches, roots, cable, wire, and
other materials that, might hinder the work or subsequent maintenance.
WSACC
Std Spec
Latest Revision 9/15/95
0 2 9 3 0 ?f E?'rS O E Aw.? E7c JaTc o.i
-2-
L I-3 -RS
5.03. Application of Fertilizer and Lime. Fertilizer and lime as
specified shall be applied within 24 hours prior to the tilling
operation. The fertilizer and lime shall be distributed uniformly over
the entire area to be seeded at the rates indicated in Table 1 of this
section.
The Contractor shall submit to the Engineer a laboratory soil analysis
of a representative topsoil sample and use the recommended rates for
fertilizer and lime. For the purpose of bidding, the Contractor will
assume an application` rate as indicated in Table 1 of this section.
Adjustments for recommended rate will be made in accordance with the
provisions of the Contract Documents for changes in the work and
contract price.
5.04. Grading. Established grades, as indicated on the drawings, shall
be maintained in a true and even condition. Eroded areas and areas
having inadequate drainage, as indicated by the ponding of water, shall
be filled. Ruts, deep tracks, dead furrows, and ridges shall be
eliminated.
5.05. Tillage. After the areas have been backfilled, compacted, and
fine graded with topsoil and fertilizer and lime spread, tillage shall
be accomplished in such a manner as to destroy existing vegetation and
to prepare an acceptable seedbed. All areas shall be tilled to a depth
of 4 inches with a heavy-duty disc or chisel type breaking plow followed
by discing with a disc harrow and smoothing with a weighted spike tooth
harrow, railroad irons, or bridge timber float drag. When a chisel plow
is used, the chisels shall be set not more than 10 inches apart, and the
areas shall be cross or double tilled. All areas shall be left smooth
for ease of mowing. All operations shall be done in a direction
parallel to the contour lines on the slope and not uphill and downhill.
5.06. Application of Seed. Seeding equipment calibration tests shall
be made in the presence of the Engineer to determine the equipment
setting required to broadcast the seed at the specified rates.
The seed box shall be kept at least half full during seeding operations
to insure even distribution of seed over all the areas seeded.
The seeder shall uniformly distribute the seed mixture over the area.
Markers shall be used to assure that no significant gaps will exist
between successive passes after there is a show of green. If unplanted
skips and areas are noted after germination and growth of the grass, the
unplanted areas shall be seeded at no additional cost to the Owner.
When hydraulic seeding equipment is used, no tillage to mix soil and
fertilizer is required. However, some compacted areas may require
scarification.
WSACC
Std- Spec
Latest Revision 9/15/95
G I TY Grt= C?i c o?u, J oizrf+ cAian? ,-?
0 2 9 3 0 ?•1 EATS I D E ?'? EkJ?;Tio?! ?c?1 t?-f
-3- ll-3`qS
Seeding shall be applied at the following rates:
Table 1
1-CED
STEEP SLOPES OR POOR SOILS AND LOW MAINTENANCE
Seeding periods: Fall
Spring
Species
Tall Fescue
Sericea Lespedeza
Rye Grain (Aug to May only)
Kobe Lespedeza
10-10-10 Fertilizer
Limestone
August 20 - October 25
February 1 - April 15
Bulk Pounds/Acre
100
30
40
10
1,000
4,000
2-CED
GENTLE SLOPES, AVERAGE/GOOD MOISTURE RETENTION AND LOW MAINTENANCE
Seeding periods: Fall
Spring
Species
Tall Fescue
Sericea Lespedeza
German Millet (May to Aug only)
Rye Grain (Aug to May only)
Kobe Lespedeza
10-10-10 Fertilizer
Limestone
August 20 - October 25
February 1 - April 15
Bulk Pounds/Acre
80
20
10
40
10
1,000
4,000
3-CED
GRASS PULLOVERS, SIDE DITCHES AND HIGH MAINTENANCE
Seeding periods: Fall August 25 - October 25
Late Winter February 1 - April 15
Species Bulk Pounds/Acre
Tall Fescue
Rye Grain (Winter)
10-10-10 Fertilizer
Limestone
WSACC
Std Spec
Latest Revision 9/15/95
200
40
1,000
4,000
G!Z`/ of CCy?lCCW? nlq?? CAP=,-I-IX
02930 per
11-3-alS
5.07. Covering and Firming. Unless hydroseeding or a cultipacker type
seeder is used, the seed shall be covered with a shallow-set spike tooth
harrow or a chain, plank, or brush drag immediately after sowing. The
depth of cover shall not exceed 1/4 inch. In small areas, covering may
need to be performed by light hand raking. After covering, the areas shall
be firmed by rolling or with the use of a cultipacker.
5.08. Application of Mulch. Mulch shall be applied immediately after
sowing, covering, and firming. Straw shall be spread uniformly in a
continuous blanket at-the rate of 2 tons per acre. Mulch shal-1 be spread
by hand or by a blower type mulch spreader. Blower type mulch spreaders
shall be adjusted and operated in such a manner as to prevent excessive
breakage of the mulch material. If this cannot be accomplished, the mulch
shall be spread by hand. Care shall be exercised to insure that all wire
or twine from baled straw is collected as it is removed from the bale.
Mulching shall be started at the windward side of relatively flat areas, or
at the upper part of a steep slope and continued uniformly until the, area
is covered. The mulch shall not be bunched.
Wood cellulose fiber mulch shall be applied at the rate indicated on the
bag when applied by hydroseeding.
The Contractor shall take sufficient precautions to prevent mulch from
entering drainage structures through displacement by wind, water, or other
causes and shall promptly remove any blockage to drainage facilities which
may occur.
5.09. Anchoring Mulch. Immediately following application, straw mulch
shall be anchored by applying a sufficient amount of emulsified asphalt or
other approved binding material to assure that the mulch is properly held
in place. Where the binding material is not applied directly with the
mulch it shall be applied immediately following the mulch application.
The method of application of binding material shall meet the approval of
the Engineer. The rate of application of emulsified asphalt shall be not
less than 4.5 gallons per 400 square feet of mulch.
During application of asphalt binding material, or other binding materials
which may cause damage, adequate precautions shall be taken to prevent
damage to surrounding structures, manholes, frames and covers, vents, or
any other appurtenances. The Contractor shall either provide adequate
covering or change method of application as required to avoid such damage.
Wood celluose fiber applied as part of the hydroseeding should not require
anchoring.
5.10. Cleanup. After completion of the construction operations, the
entire area shall be cleared of excess soil and waste material, including
but not limited to stones, stumps, roots, brush, wire, grade stakes, and
all objects that might be a hindrance to maintenance operations and affect
the visual appearance of the site. All roads over which hauling operations
have been conducted, despite the type of surfacings, shall be kept clean,
WSACC 02930 G1
Std Spec -5- 1..1?TSiDE
Latest Revision 9/15/95 L t- 3 - `3'C;'
and soil clods and debris left on the surface shall be removed. The wheels
of vehicles shall be cleaned to avoid leaving soil upon the surface of
roads, and other paved areas.
5.11. Protection. Immediately after completion of construction
operations, the entire area shall be protected as necessary against traffic
by erecting barricades or placing warning signs in appropriate areas. Such
protective devices shall be maintained until final acceptance of the
project.
6. GRASS ESTABLISHMENT. All seeded areas shall be maintained until final
acceptance of the Project. Maintenance shall include mowing, reseeding,
repair of erosion damage, maintenance of mulch, refertilize at end of
warranty period, and all other operations necessary to obtain an acceptable
grass cover.
6.01. Watering. Watering to expedite germination and establishment of the
grass will not be required. However, the Contractor shall guarantee a
uniform stand of grass in all areas. The Project will not receive final
acceptance until all areas have a stand of turf. The Contractor may elect
to water areas to expedite germination and establishment, but in such cases
he shall supply all water and the equipment necessary for its application.
6.02. Maintenance of Grades and Repair of Erosion Damage. Original grades
of the grass areas shall be maintained after commencement of planting
operations and during the maintenance period. Any damage to the finished
surface from construction operations shall be promptly repaired. In the
event erosion occurs from either watering operations or rainfall, such
damage shall be promptly repaired. Ruts, ridges, tracks, and other surface
irregularities shall be corrected and areas replanted where required.
6.03. Maintenance of Mulch. Mulch shall be maintained until covered with
growing grass seedlings. Material that has been removed from the site by
wind, water, or other causes shall be replaced and secured. Repair work
that is required because of faulty operations or negligence on the part of
the Contractor shall be performed at no additional cost to the Owner.
7. COMPLETION. In the event that all of the Work required by the Contract
Documents, with the exception of the establishment of a satisfactory grass
growth by seeding, is completed before a satisfactory grass growth is
established, partial acceptance of the work will be made with final
acceptance delayed until a satisfactory grass growth has been established.
End of Section
WSACC
Std Spec
Latest Revision 9/15/95
C I _FY cf-- Cc?'lccAZJ, ricaztH C}1'w? ??
02930 (,,ACS'( SI IJ? I?1^l-If ? JF?T
NOT TO SCALE
Cl 'T ?`( cam= c?..c caz?, ?t o??-1 c?,? cam- ? ? 04
1r.1.C? C S l t? E Ar--t•l E??QTc?I i--?SEC7-
l(-3-95'
R f W EASEMENT DETAIL