Loading...
HomeMy WebLinkAbout20191182 Ver 1_Riparian Buffer Authorization_20190830w IV State of North Carolina TV a Department of Environmental Quality Division of Water Resources Division of Water Resources 15A NCAC 02B.0233 (8)(b),.0243 (8)(b),.0250 (11)(b),.0259 (8)(b),.0267 (11)(c),.0607 (e)(2) - Buffer Authorization FORM: BA 10-2013 Riparian Buffer Authorization Form A. Applicant Information 1. Project Information 1a. Name of project: 0 (200 Block) Harris Road Bank Stabilization 1 b. County: Wake 1c. Nearest municipality: Wake Forest 1d. Subdivision name: N/A 1 e. Is the project located in any of North Carolina's twenty coastal counties? If yes, answer 1f below. ❑ Yes ® No 1f. Is the project located within a NC Division of Coastal Management Area of Environmental Concern (AEC)? ❑ Yes ® No 2. Owner Information 2a. Name on Recorded Deed: Town of Wake Forest 2b. Deed Book and Page No. 007808, pg 00252 2c. Map Book and Page No. (include a copy of the recorded map that indicates when the lot was created): N/A 2d. Responsible Party (for Corporations): City of Raleigh Public Utilities Department 2e. Street address: One Exchange Plaza 2f. City, state, zip: Raleigh, NC 27601 2g. Telephone no.: 919-996-4540 2h. Fax no.: 2i. Email address: Matthew.vessie@raleighnc.gov 3. Applicant Information (if different from owner) 3a. Applicant is: ❑ Agent ❑ Other, specify: 3b. Name: 3c. Business name (if applicable): 3d. Street address: 3e. City, state, zip: 3f. Telephone no.: 3g. Fax no.: 3h. Email address: 4. Agent/Consultant Information (if applicable) 4a. Name: Mary Brice 4b. Business name if applicable): AECOM Technical Services of North Carolina, Inc. 4c. Street address: 1600 Perimeter Park Drive, Suite 400 4d. City, state, zip: Morrisville, NC 27560 4e. Telephone no.: 919-461-1358 4f. Fax no.: 4g. Email address: Mary.brice@aecom.com FORM: BA 10-2013 Page 1 of 4 B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): 1841574720 1 b. Site coordinates (in decimal degrees): Latitude: 35.9957 Longitude: -78.5075 1c. Property size: acres 2. Surface Waters 2a. Name of nearest body of water to proposed project: Richland Creek 2b. Water Quality Classification of nearest receiving water: C -NSW 2c. River basin: Neuse 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Existing sanitary sewer easement 3b. Attach an 8'h x 11 excerpt from the most recent version of the USGS topographic map indicating the location of the site 3c. Attach an 8'/2 x 11 excerpt from the most recent version of the published County NRCS Soil Survey Map depicting the project site 3d. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: N/A 3e. Explain the purpose of the proposed project: See attachment. 3f. Describe the overall project in detail, including the type of equipment to be used: See attachment. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property/ project(including all priorphases) in thepast? ❑ Yes ❑ No ® Unknown Comments: 4b. If yes, who delineated the jurisdictional areas? Name (if known): Agency/ Consultant Company: Other: 4c. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for this project(including all priorphases) in thepast? ❑ Yes ® No ❑ Unknown 5b. If yes, explain and detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ❑ Yes ® No 6b. If yes, explain. FORM: BA 10-2013 Page 2 of 4 C. Proposed Impacts Inventory 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. Disturbance to the buffer will be minimally necessary to access the repair site. Once work is complete, disturbed area will be seeded and mulched back to original conditions. 1. Buffer Impacts 2. Buffer Mitigation 2a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? 1a. Project is in which protected basin? ® Neuse ❑ Tar -Pamlico ❑ Catawba Reason for impact Total impact (square feet ❑ Randleman ❑ Jordan ❑ Goose Creek 1 b. Individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 1.5 Buffer impact Reason for Type of impact Stream name Buffer Zone 1 Zone 2 number — impact (exempt, allowable, mitigation impact impact Permanent (P) allowable w/ required? (sq ft) (sq ft) or Temporary mitigation) T B1 ❑ P ® T Bank Allowable UT of Richland ❑ Yes ® No 300 0 stabilization Creek B2 ❑ P ❑ T ❑ Yes ❑ No B3 ❑ P ❑ T ❑ Yes ❑ No B4 ❑ P ❑ T ❑ Yes ❑ No B5 ❑ P ❑ T ❑ Yes ❑ No B6 ❑ P ❑ T ❑ Yes ❑ No Total buffer impacts 300 0 1c. Comments: See attachment for impact locations. Impact amount is determined by assuming a 30 -foot long by 10 -foot wide area would be disturbed to stabilize the bank. D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. Disturbance to the buffer will be minimally necessary to access the repair site. Once work is complete, disturbed area will be seeded and mulched back to original conditions. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Silt fence and appropriate erosion control measures will be established prior to beginning work. 2. Buffer Mitigation 2a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ❑ Yes ® No 2b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation and calculate the amount of mitigation required in the table below. Zone Reason for impact Total impact (square feet Multiplier Required mitigation (square feet Zone 1 3 (2 for Catawba) Zone 2 1.5 Total buffer mitigation required: 2c. If buffer mitigation is required, is payment to a mitigation bank or NC DMS ❑ Yes ❑ No proposed? 2d. If yes, attach the acceptance letter from the mitigation bank or NC DMS. 2e. If no, then discuss what type of mitigation is proposed. 2f. Comments: FORM: BA 10-2013 Page 3 of 4 E. Diffuse Flow Plan All buffer impacts and high ground impacts require diffuse flow or other form of ❑ Diffuse flow stormwater treatment. Include a plan that fully documents how diffuse flow will be ❑ Other BMP maintained. If a Level Spreader is proposed, attach a Level Spreader Supplement Form. 1 b. If you answered "yes" to the above, does the project require preparation of an If due to site constraints, a BMP other than a level spreader is proposed, please provide a environmental document pursuant to the requirements of the National or State (North plan for stormwater treatment as outlined in Chapter 8 of the NC Stormwater BMP Carolina) Environmental Policy Act NEPA/SEPA ? Manual and attach a BMP Supplement Form. 1 c. If you answered "yes" to the above, has the document been finalized by the State F. Supplementary Information 1. Environmental Documentation 1 a. Does the project involve an expenditure of public (federal/state/local) funds or the ® Yes ❑ No use of public federal/state land? 1 b. If you answered "yes" to the above, does the project require preparation of an ❑ Yes ® No environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act NEPA/SEPA ? 1 c. If you answered "yes" to the above, has the document been finalized by the State ❑ Yes ❑ No Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) Comments: 2. Violations 2a. Is the site in violation of DWR Wetland Rules (15A NCAC 02H .0500), Isolated ❑ Yes ® No Wetland Rules (15A NCAC 02H .1300), DWR Surface Water or Wetland Standards, or Riparian Buffer Rules 15A NCAC 02B .0200)? 2b. Is this an after -the -fact permit application? ❑ Yes ® No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): Mary T. Brice Applicant/Agent's Printed Name Applicant/Agent's Signature is valid only if an authorization letter from the Send 3 complete sets of this form and accompanying documents to the following: For government transportation projects sent by First Class Mail via the US Postal Service: NC DWR, Transportation Permitting Unit 1617 Mail Service Center Raleigh, NC 27699 - 1617 For all other projects sent by First Class Mail via the US Postal Service 8/27/19 Date is For government transportation projects sent by delivery service (UPS, FedEx, etc.): OR NC DWR, Transportation Permitting Unit 512 N. Salisbury Street Raleigh, NC 27604 For all other projects sent by delivery service (UPS, FedEx, etc.): Karen Higgins Karen Higgins NCDWR — 401 & Buffer Permitting Branch OR NCDWR — 401 & Buffer Permitting Branch 1617 Mail Service Center 512 N. Salisbury Street Raleigh, NC 27699 - 1617 Raleigh, NC 27604 FORM: BA 10-2013 Page 4 of 4 AGENT AUTHORIZATION FORM PRE -CONSTRUCTION NOTIFICATION PROPERTY DESCRIPTION: Utility Maintenance Environmental Permitting and Consulting - T06 Owner: City of Raleigh Public Utilities Department The undersigned, owners of the above noted property, do hereby authorize Mary T. Brice , of AECOM Technical Services of North Carolina, Inc. (Contractor / Agent) (Name of consulting firm) to act on my behalf and take all actions necessary for the processing, issuance and acceptance of the permit or certification and any and all standard and special conditions attached. Owner's Address (if different that property above): One Exchange Plaza, Raleigh, NC 27601 Telephone: (919) 996-3477 I hereby certify the above information submitted in this application is true and accurate to the best of our knowledge. A/I�fi Z, Authori Signature Please print Harris Rd, 200 Block N 105 210 420 ft 1 inch = 200 feet Disclaimer Maps makes every effort to produce and publish the most current and accurate information possible. However, the maps are produced for information purposes, and are NOT surveys. No warranties, expressed or implied ,are provided for the data therein, its use,or its interpretation. City of Raleigh Public Utilities Sewer Maintenance staff discovered an area of streambank failure on 0 Harris Road (near the 200 block, Lat. 35.9957, Long. -78.5075) along an unnamed tributary of Richland Creek. The repair area is located within a maintained sanitary sewer easement and the site will be accessed via the existing power utility easement. Approximately 30 LF of streambank will be stabilized. The following activities are proposed at this location: • Erosion control measures and a dry work area will be established prior to work beginning. • The bank will be stabilized with rock/geotextile. • All disturbed areas will be seeded and mulched upon completion of the work. 200 Block Harris Road - Lat. 35.9957, Long. -78.5075 'FtdFr�'�,14y'f""FY :aa W% ^'147?r#' s, 1 JU 40 I >n � I� R r� n d •r 4- 7J�l _Tp- , . .i R