Loading...
HomeMy WebLinkAboutWQCS00242_Compliance Evaluation Inspection_20190827ROY COOPER Governor MICHAEL S. REGAN Secretary LINDA CULPEPPER Director Village of Alamance Attn: Donald Tichy, Mayor P.O. Box 96 Alamance, NC 27201 NORTH CAROLINA Environmental Quality August 27, 2019 SUBJECT: Compliance Evaluation Inspection Village of Alamance Wastewater Collection System, WQCS00242 Alamance County Dear Mr. Tichy: Ron Boone, of the NC Division of Water Resources (DWR), Winston-Salem Regional Office (WSRO), visited the Village of Alamance on August 22nd, 2019, to perform a Compliance Evaluation Inspection (CEI) of the town's wastewater collection system. The assistance and cooperation of Ben York and Arnold Allred, Operator in Responsible Charge (ORC), was greatly appreciated. Details of the inspection are recorded on the attached EPA Water Compliance Inspection Report. You're reminded that, in accordance with NC General Statute 143-215.6A, failure to comply with all conditions of the permit subjects the town to civil penalties not to exceed $25,000.00 per violation, per day. If you have any questions or require further assistance, please contact Mr. Boone by phone at 336-776-9690, or by email at ron.boone@ncdenr.gov. You may also contact me by phone at 336-776- 9700, or by email at lon.snider@ncdenr.gov. Sincerely, DocuSigned<by: 145B49E225C94EA... Lon T. Snider, Regional Supervisor Water Quality Regional Operations Section Winston-Salem Regional Office Division of Water Resources, NCDEQ Attachments: EPA Water Compliance Inspection Report cc: NCDWR WSRO File 100, Q""!0 North Carolina Department of Environmental Quality I Division of Water Resources EWinston-Salem Regional Office 1 450 Hanes Mill Road, Suite 300 1 Winston-Salem, North Carolina 27105 NORTH CAROLINA 336.776.9800 Compliance Inspection Report Permit: WQCS00242 SOC: County: Alamance Region: Winston-Salem Contact Person: Donald Tichy Directions to Facility: Effective: 09/07/18 Expiration: 08/31/26 owner: Village of Alamance Effective: Expiration: Facility: Alamance Collection System 3974 S NC 62 Hwy System Classifications: CS1, Primary ORC: Arnold Eugene Allred Secondary ORC(s): On -Site Representative(s): Title: Mayor Related Permits: NC0023876 City of Burlington - Southside WWTP Inspection Date: 08/22/2019 Entry Time: 09:30AM Primary Inspector: Ron Boone Secondary Inspector(s): Certification: 25366 Phone: 336-226-0033 Phone: 336-824-6440 Exit Time: 12:OOPM Phone: 336-776-9690 Reason for Inspection: Routine Inspection Type: Collection System Inspect Non Sampling Permit Inspection Type: Collection system management and operation Facility Status: 0 Compliant ❑ Not Compliant Question Areas: Miscellaneous Questions General Sewer & FOG Ordinances Capital Improvement Plan Map Reporting Requirements Inspections Spill Response Plan Spills Lines Manholes Pump Stations (See attachment summary) Page 1 of 7 Permit: WQCS00242 Owner - Facility: Village of Alamance Inspection Date: 08/22/2019 Inspection Type : Collection System Inspect Non Sampling Reason for Visit: Routine Inspection Summary: No discrepancies or violations were noted by the inspector. Page 2 of 7 Permit: WQCS00242 Owner - Facility: Village of Alamance Inspection Date: 08/22/2019 Inspection Type : Collection System Inspect Non Sampling Reason for Visit: Routine General Yes No NA NE Is there a properly designated primary ORC and at least one back-up of proper grade? 0 ❑ ❑ ❑ Are logs being reviewed by the system management or owner on a regular basis? 0 ❑ ❑ ❑ # What is that frequency? As generated # Are there any issues being addressed currently or any in the planning stages? ❑ 0 ❑ ❑ Is there a specific pump failure plan available for all pump stations? 0 ❑ ❑ ❑ Does plan indicate if pump parts/new pumps are in spare parts/equipment inventory? 0 ❑ ❑ ❑ Are new/significantly upgraded pump stations equipped with anti -corrosion materials? 0 ❑ ❑ ❑ Does the permittee have a copy of their permit? ❑ ❑ ❑ # Is permit expiring within the next 6 months? ❑ ❑ ❑ If Yes, has the Permittee applied for renewal? ❑ ❑ 0 ❑ Comment: None Sewer and FOG Ordinances Yes No NA NE Is Sewer Use Ordinance (SUO) or other Legal Authority available? ❑ ❑ ❑ Does it appear that the Sewer Use Ordinance is enforced? ❑ ❑ ❑ Is there a Grease Control Program that legally requires grease control devices? 0 ❑ ❑ ❑ What is the standard grease trap cleaning requirement in the FOG ordinance? Not evaluated Is Grease Control Program enforced via periodic inspections/records review? 0 ❑ ❑ ❑ Is action taken against violators? 0 ❑ ❑ ❑ # Have satellite systems adopted an equivalent or more stringent ordinance? ❑ ❑ 0❑ Is grease/sewer education program documented with req'd customer distribution? 0 ❑ ❑ ❑ # Are other types of education tools used like websites, booths, special meetings, etc? 0 ❑ ❑ ❑ If Yes, what are they? (This can reduce mailing to annual.) Website Comment: None Capital Improvement Plan Yes No NA NE Has a Capital (CIP) or System Improvement Plan been developed and adopted? 0 ❑ ❑ ❑ Is it designated for wastewater only or does it have a dedicated section? 0 ❑ ❑ ❑ Does CIP cover three to five year period of earmarked improvements? 0 ❑ ❑ ❑ Does CIP include description of project area? 0 ❑ ❑ ❑ Does CIP include description of existing facilities? 0 ❑ ❑ ❑ Does CIP include known deficiencies? 0 ❑ ❑ ❑ Does CIP include forecasted future needs? 0 ❑ ❑ ❑ Comment: None Map Yes No NA NE Page 3 of 7 Permit: WQCS00242 Owner - Facility: Village of Alamance Inspection Date: 08/22/2019 Inspection Type : Collection System Inspect Non Sampling Reason for Visit: Routine Is there a overall sewer system map? 0 ❑ ❑ ❑ Does the map include: Pipe Type (GS/FM) 0 ❑ ❑ ❑ Pipe sizes 0 ❑ ❑ ❑ Pipe materials (PVC, DIP, etc) 0 ❑ ❑ ❑ Pipe location 0 ❑ ❑ ❑ Flow direction 0 ❑ ❑ ❑ Approximate pipe age 0 ❑ ❑ ❑ Pump station ID, location and capacity 0 ❑ ❑ ❑ # Force main air release valve location & type 0 ❑ ❑ ❑ # Location of satellite connections 0 ❑ ❑ ❑ Is the map being updated for changes/additions within 1 year of activation? 0 ❑ ❑ ❑ Comment: None Reporting Requirements Yes No NA NE # Have there been any sewer spills in the past 3 years? 0 ❑ ❑ ❑ If Yes, were they reported to the Division if meeting the reportable criteria? 0 ❑ ❑ ❑ If applicable, is there documentation of press releases and public notices issued? 0 ❑ ❑ ❑ Is an Annual Wastewater Performance Report being filed with the Division, if required? ❑ ❑ ❑ Is the report being made available to all its sewer customers? ❑ ❑ ❑ # How is it being made available? N/A Comment: None Inspections Yes No NA NE Are adequate maintenance records maintained? 0 ❑ ❑ ❑ Are pump stations being inspected at the required frequency? 0 ❑ ❑ ❑ # Is at least one complete functionality test conducted weekly per pump station? 0 ❑ ❑ ❑ Is there a system or plan in place to observe the entire system annually? M ❑ ❑ ❑ Is the annual inspection documented? 0 ❑ ❑ ❑ # Does the system have any high -priority lines/locations? 0 ❑ ❑ ❑ Are inspections of HPL documented at least every 6 months? 0 ❑ ❑ ❑ Are new lines being added to the HPL list when found or created? 0 ❑ ❑ ❑ Comment: None Spill Response Action Plan Yes No NA NE Is a Spill Response Action Plan available? 0 ❑ ❑ ❑ Is a Spill Response Action Plan available for all personnel? 0 ❑ ❑ ❑ Does the plan include: Page 4 of 7 Permit: WQCS00242 Owner - Facility: Village of Alamance Inspection Date: 08/22/2019 Inspection Type : Collection System Inspect Non Sampling Reason for Visit: Routine 24-hour contact numbers 0 ❑ ❑ ❑ Response time 0 ❑ ❑ ❑ Equipment list and spare parts inventory 0 ❑ ❑ ❑ Access to cleaning equipment 0 ❑ ❑ ❑ Access to construction crews, contractors, and/or engineers 0 ❑ ❑ ❑ Source of emergency funds 0 ❑ ❑ ❑ Site sanitation and cleanup materials 0 ❑ ❑ ❑ Post-overflow/spill assessment 0 ❑ ❑ ❑ Does the Permittee appear to respond within 2 hours of first knowledge of a spill? 0 ❑ ❑ ❑ Comment: None aREE Yes No NA NE Is system free of known points of bypass? ❑ ❑ ❑ If No, describe type of bypass and location Are all spills or sewer related issues/complaints documented? 0 ❑ ❑ ❑ # Are there repeated overflows/problems (2 or more in 12 months) at same location? ❑ 0 ❑ ❑ # If Yes, is there a corrective action plan? ❑ ❑ 0 ❑ Comment: None Lines/Right-of-Ways/Aerial Lines Yes No NA NE Please list the Lines/Right of Ways/Aerial Lines Inspected: None Are right-of-ways/easements maintained for full width for access by staff/equipment? ❑ ❑ ❑ If No, give details on temporary access: Is maintenance documented? 0 ❑ ❑ ❑ Are gravity sewer cleaning records available? 0 ❑ ❑ ❑ Has at least 10% of lines older than 5 yrs been cleaned annually? 0 ❑ ❑ ❑ Were all areas/lines inspected free of issues? 0 ❑ ❑ ❑ Comment: None Manholes Yes No NA NE Please list the Manholes Inspected: None Are manholes accessible? ❑ ❑ ❑ # Are manhole covers/vents above grade? ❑ ❑ ❑ Are manholes free of visible signs of overflow? 0 ❑ ❑ ❑ Are manholes free of sinkholes and depressions? 0 ❑ ❑ ❑ Are manhole covers present? 0 ❑ ❑ ❑ # Are manholes properly seated? 0 ❑ ❑ ❑ Page 5 of 7 Permit: WQCS00242 Owner - Facility: Village of Alamance Inspection Date: 08/22/2019 Inspection Type : Collection System Inspect Non Sampling Reason for Visit: Routine # Are manholes in good condition? 0 ❑ ❑ ❑ # Are inverts in good condition? 0 ❑ ❑ ❑ Is flow unrestricted in manholes? 0 ❑ ❑ ❑ Are manholes free of excessive amounts of grease? 0 ❑ ❑ ❑ Are manholes free of excessive roots? 0 ❑ ❑ ❑ Are manholes free of excessive sand? 0 ❑ ❑ ❑ Are manhole vents screened? 0 ❑ ❑ ❑ Are vents free of submergence? 0 ❑ ❑ ❑ Are manholes free of bypass structures or pipes? 0 ❑ ❑ ❑ Comment: None Pump Stations Yes No NA NE Please list the Pump Stations Inspected: NC 62 # Number of duplex or larger pump stations in system 2 # Number of vacuum stations in system 0 # Number of simplex pump stations in system 0 # Number of simplex pump stations in system serving more than one building 0 How many pump/vacuum stations have: # A two-way "auto polling" communication system (SCADA) installed? 0 # A simple one-way telemetry/communication system (auto -dialer) installed? 2 For pump stations inspected: Are they secure with restricted access? 0 ❑ ❑ ❑ Were they free of by-pass structures/pipes? 0 ❑ ❑ ❑ Were wet wells free of excessive grease/debris? 0 ❑ ❑ ❑ # Do they all have telemetry installed? 0 ❑ ❑ ❑ Is the communication system functional? 0 ❑ ❑ ❑ Is a 24-hour notification sign posted ? 0 ❑ ❑ ❑ Does the sign include: Owner Name? 0 ❑ ❑ ❑ Pump station identifier? 0 ❑ ❑ ❑ # Address? 0 ❑ ❑ ❑ Instructions for notification? ❑ ❑ ❑ 24-hour emergency contact numbers? ❑ ❑ ❑ Are audio and visual alarms present? 0 ❑ ❑ ❑ Are audio and visual alarms operable? 0 ❑ ❑ ❑ # Is there a backup generator or bypass pump connected? 0 ❑ ❑ ❑ Page 6 of 7 Permit: WQCS00242 Owner - Facility: Village of Alamance Inspection Date: 08/22/2019 Inspection Type : Collection System Inspect Non Sampling Reason for Visit: Routine If tested during inspection, did it function properly? Is the back-up system tested at least bi-annually under normal operating conditions? # Does it have a dedicated connection for a portable generator? # Is the owner relying on portable units in the event of a power outage? # If Yes, is there a distribution plan? If Yes, what resources (Units/Staff/Vehicles/etc) are included in Plan? # Does Permittee have the approved percentage of replacement simplex pumps? Is recordkeeping of pump station inspection and maintenance program adequate? Do pump station logs include at a minimum: Inside and outside cleaning and debris removal? Inspecting and exercising all valves? Inspecting and lubricating pumps and other equipment? Inspecting alarms, telemetry and auxiliary equipment? Comment: None • ❑ ❑ ❑ • ❑ ❑ ❑ ❑■❑❑ ❑■❑❑ ❑❑■❑ ❑❑■❑ ■❑❑❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ Page 7 of 7