HomeMy WebLinkAbout19950529 Ver 1_COMPLETE FILE_19950602State of North Carolina
Department of Environment,
Health and Natural Resources
Division of Environmental Management
James B. Hunt, Jr., Governor
Jonathan B. Howes, Secretary
A. Preston Howard, Jr., P.E., Director
June 19, 1995
MEMO
TO: John Parker, DCM
FROM: John Dorney,
RE: Water Quality comments
AK4**A
[:3EHNR
F-11 ILE COPY
Davis Heniford Subdivisi Thomas Morgan, agent
Brunswick County
DEM # 95$29
DEM has reviewed this application
no.objections to the issuance of a CAMA
Please call me at 733-1786 if you have
95529.1tr
cc: Central Files
DEM Wilmington Regional Office
for a CAMA Permit and has
permit for this project.
any questions.
P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-7015 FAX 919-733-2496
An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post-consumer paper
r 4
1.
2.
3.
4.
DIVISION OF COASTAL MANAGEMENT
FIELD INVESTIGATION REPORT
APPLICANT'S NAME: Davis Heniford Subdivision, Thomas W. Morgan, Agent
LOCATION OF PROJECT SITE: Town of Holden Beach near west end at 1226 Ocean View
Blvd. West.
Photo Index - 1989: Photo 4-185-1 Grid K-M; 10-11 1984: Photo 7-52 Grid N-P; 14-15
State Plane Coordinates - X: 2201000 Y: 57500
D -?
I nn
INVESTIGATION TYPE: CAMA Only MAY r
?Y 3 ? IG?5
INVESTIGATIVE PROCEDURE:, Dates of Site Visit - 4/27/95
Was Applicant Presen No ;- unavailable
5. PROCESSING PROCEDURE: Application Received - 4/27/95
Office - Wilmington
6. SITE DESCRIPTION:
(A) Local Land Use Plan Holden Beach
Land Classification From LUP - Limited Transition - Medium Density
(B) AEC(s) Involved: OH, ES, CW
(C) Water Dependent: Both
(D) Intended Use: Single Family Residential with improved pedestrian water access
(E) Wastewater Treatment: Existing - N/A
Planned - Septic Tank
(F) Type of Structures: Existing - Former Camp Ground
Planned - Single Family Subdivision
(G) Estimated Annual Rate of Erosion: 2" per year
Source - CAMA erosion information
7. HABITAT DESCRIPTION: [AREA]
DREDGED FILLED OTHER
(A) Vegetated Wetlands
Reg/Irreg Flooded Marsh - Shaded Approx. 1710
sf
(B) Non-Vegetated Wetlands
N/A
(C) Other Approx. 6.47
High Ground available for acres
development
(D) Total Area Disturbed: 283710 sf (6.51 acres)
(E) Primary Nursery Area: NO
(F) Water Classification: SA Open: Yes
8. PROJECT SUND ARY: The applicants propose to develop a new subdivision through the
conversion of a former campground into 48 residential lots. Two streets and community water
will be provided. The access to an existing pier will be divided in order that the pier can be
accessed from the ends of the proposed streets.
Davis Heniford Subdivision, Thomas W. Morgan, Agent
Page 2
9. PROTECT DESCRIPTION May 23, 1995
The project is located on Holden Beach near the west end of the isl ' d. Portions of the development
are sited within both the Ocean Hazard Area of Environmental Con?ern and other areas fall within the
Estuarine System Areas of Environmental Concerns. The projectlis being considered under the full
development disclosure policy which the Division has adopted for p ojects of this nature. The proposed
subdivision has platted dimensions of approximately 470 feet wide y 600 feet deep. There are 48 lots
shown within the bold border of the proposed development. The dimensions of these lots are
approximately 100' x 50'. There are no improved streets at p sent on the tract. A water supply
branch permit for. new water service was issued in late 1994. ere is an existing pier located on the
north (estuarine) side of the tract. This 1000 feet long pier h served for pedestrian access to the
waters of the AIWW. It crosses over regularly and irregularly flooded marsh along its alignment. It
now touches highground about halfway between the east and est corners of the property along the
shoreline. This project is a joint venture between the Town o Holden Beach, the lot owners of the
subdivision and the original property owners who also still ow approximately eight of the lots. All
other lots are sold or undei contract to individuals or partners ins etc.. The applicants are proposing
the creation of two paved streets to serve the development. Two 6 inch water mains are also to be
provided in the street right of ways. Each street will be approximately 650' long x 20' wide within a
40' cleared right of way. The water mains will also be appr ximately 650' long. The applicants also
propose to remove a 90' section of the landward end of the xisting pier and replace it with two new
access piers/walkways in an inverted W" shape. The easte structure will be approximately 160' long
by x 6' wide. The western side will be approximately
proposing to grade and fill 44 of the 48 lots proposed fo
both for building pads and septic tank purposes. There
the subdivision that are not proposed to be filled. As t
the original property owners and have a mean high water
ones they appear to be a buffer or controlling border for
not extend to these 4 lots. The plans show that a silt fenc
other 44. The application indicates that storm,
ater
records indicate that DEM stormwater compliance has
However, CAMA rules require that the area within 75 f
by no more than 30% by impervious surfaces. There it
this aspect of the project however it must be addressed
shoreline AEC.
125 long x 6' wide. The applicants are also
r th subdivision. This lot preparation will be
are four lots at the northern (AIWW) end of
hes lots appear to be still in the ownership of
contour encroaching on the three most eastern
the other lots. The streets and water lines do
el will be installed between these 4 lots and the
in off will be through grassed swales. Our
been received by the proposed development.
?et of the mean high water contour be covered
s no mention in the application with regard to
prior to the development of the 75' estuarine
10. ANTICIPATED IMPACTS
The combined area of the lot preparation for this d
is in excess of one acre of disturbance. This tril
control approval from the Division of Land Qu
permit. The new additions to the existing pier me
future development is proposed for lots 44, 41 or
required if the activity will involve fill waterward
of lots 68, 45, 40, and 23 may need to develop inns
cover requirement. In order to minimize the of
elevated to the maximum extent practicable.
31opment and the street improvements as proposed
?ed the requirement of the sedimentation/erosion
y and therefore the Major CAMA development
the requirement for width over wetlands. If any
a major modification or individual major will be
the mean high water contour. The development
.tive design plans for any excess of the impervious
Is of shading, the new pier additions should be
Submitted by: C. Robert Stroud, Jr. Date: 5/23/95 Office: Wilmington
k
Please type or print. Carefully describe all anticipated
development activities, including construction, excava-
tion, filling, paving, land clearing, and stormwater con-
trol. If the requested information is not relevant to your
project, write N/A (not applicable). Items 14 and 8-9
must be completed for all projects.
1 APPLICANT
a. Name Thomas W. Morgan (Agent)
Address 1027 Sabbath Home Road, -SW
If you plan to build a marina, also complete and
attach Form DCM-MP-2.
b. Is the proposed activity maintenance of an
existing project, new work, or both?
New work
c. Will the project be for community, private, or
commercial use?
Community and private
City Supply State NC d. Describe the planned use of the project.
See cover letter
Zip 28462 - Day phone (910)842-9392
Landowner or X Authorized agent
b. Project name (if any) Davis Heniford- -- - - -- -?
Subdivision
4 LAND AND WATER
c. ,
If the applicant is not the landowner,;also give the CHARACTERISTICS
owner's name and address. `= L=' APR % ? 1 90,
See Attnnhment A a. Size of entire tract 6.76 Acre
- i _)F
_ 1Ab -;SFidJb5findividuallot(s) 5000.00
c. Elevation of tract above mean sea level or
National Geodetic Vertical Datum '
2 LOCATION OF PROPOSED 8 feet NGVD
PROJECT d. Soil type(s) and texture(s) of tract
- Sand
a. Street address or secondary road number Grass
1226 Ocean View Blvd. West e. Vegetation on tract
b. City, town, community, or landmark
Man-made features now on tract Camoground & Pier
f
Holden Beach North Carol ; nn .
c. County Brunswick
g. What is the CAMA Land Use Plan Classification of
the site? (Consult the local land use plan.)
d. Is proposed work within city limits or planning
jurisdiction? Yes
e. Name of body of water nearest project
Atlantic Intracoastal Waterway
3 DESCRIPTION AND PLANNED USE
OF PROPOSED PROJECT
a. Describe all development activities you propose (for
example, building a home, motel, marina, bulkhead,
or pier). See cover Tatter
Conservation
Developed
Rural
Transitional
Community
Other
h. How is the tract zoned by local government?
R-1
i. How are adjacent waters classified?
SA
j. Hasa professional archaeological survey been
carried out for the tract? No If so, by whom?
3/'91
A
5 UPLAND DEVELOPMENT
Complete this section if the project includes any land
development.
a. Type and number of buildings, facilities, or
structuresproposed Streets, water and
48 Residential lots.
b. Number of lots or parcels 48
c. Density (Give the number of residential units and the
units per acre.) 7
d. Size of area to be graded or disturbed
6.8 Acre
e. If the proposed project will disturb more than one
acre of land, the Division of Land Resources must
receive an erosion and sedimentation control plan at
least 30 days before land disturbing activity begins.
If applicable, has a sedimentation and erosion
control plan been submitted to the Division of Land
Resources? Yes -
f. Give the percentage of the tract within' 7S feet of
mean high water to be covered by impermeable
9
curfaces_ such as pavement. buildings ooftops ? R 7 190
g. List the materials, such as marl, paver _stone asphalt, I NA
or concrete, to be used for paved surfaces:,
Asphalt
h. If applicable, has a stormwater management plan
been submitted to the Division of Environmental
Management? No
i. Describe proposed sewage disposal and/or waste
water treatment facilities.
Septic tanks
j. Have these facilities received state or local approval?
Preliminary approval pending fill
placement
k. Describe existing treatment facilities.
No
1. Describe location and type of discharges to waters of
the state (for example, surface runoff, sanitary
wastewater, industrial/commercial effluent, "wash
down"). Surface run-off through grass
swales.
2
m. Watersu?plysource Town of Holden Beach
in. If the project is oceanfront development, describe
the steps that will be taken to maintain established
public ach accessways or provide new access.
,AVATION AND FILL
DRMATION
be below the purpose of proposed excavation
activities (excluding bulkheads, which are
;d in Section 7).
o. If the project is on the oceanfront, what will be the
elevation above mean sea level of the first habitable
floor? i, N/A
6 EX
INF
7 1 77
a.?e
Length Width Depth
Boat basin
Other (break-
water, pier,
boa ramp,
root jetty)
Fill placed in
we[?land or below
M` l ••
Upland fill
ar?eas /Lots
b. Amount of material to be excavated from below
water level in cubic yards none
. Type of material N/A
d. Does the area to be excavated include marshland,
swamps, or other wetlands?
N/A
e. High ground excavation, in cubic yards
N/A
3/91
A" b"
f. Dimensions of spoil disposal area c. Shoreline erosion during preceding 12 months, in
N/A feet None
g. Location of spoil disposal area N/A d. Type of bulkhead material N/A
e. Amount of fill, in cubic yards, to be placed below
h. Do you claim title to the disposal area? mean high water None
If not, attach a letter granting permission from the N/A
f. Type of fill material
owner.
i. Will a disposal area be available for future
maintenance? N/A
If so, where?
8 ADDITIONAL INFORMATION
j. Does the disposal area include any marshland, In addition to the completed application form, the follow-
swamps, or water areas? ing items must be submitted: .
N/A
k. Will the fill material be placed below mean high A copy of the deed (with state application only) or other
water? No instrument under which the applicant claims title to the
affected property. If the applicant is not claiming to be
1. Amount of fill in cubic yards 50-70 YD/Lot the owner of said property, then forward a copy of the
m. Type of fill material Sand deed or other instrument under which the owner claims
title, plus written permission from the owner to carry out
n. Permitted mine
Source of fllmaterial the project.
o. Will fill material be placed on marsh or other,
=? -
An accurate work plat (including plan view and cross
wetlands? No sectional drawings) drawn to scale in black ink on an 8
p. ?,
Dimensions of the wetland to be?Mll A r Q
2 7 ;?95 i#/ 11 white paper. (Refer to Coastal Resources
R
No Commission Rule 7J.0203 for a detailed description.)
q. How will excavated or fill material be kept on-situ N
, AS 3 A L N"i ` N A G 'Rlease note that original drawings are preferred and
=
,
and erosion controlled?
Silt fence and vegetated buffer only high quality copies will be accepted. Blue-line 'Z-5-
X
high
prints or other larger plats are acceptable only if
quality copies are provided by applicant. (Contact the
U.S. Army Corps of Engineers regarding that agency's
r. What type of construction equipment will be used use of larger drawings.) A site or location map is a pan
(for example, dragline, backhoe, or hydraulic of plat requirements and it must be sufficiently detailed
dredge)? Dump truck and backhoe to guide agency personnel unfamiliar with the area to the
site. Include county road (SR) numbers, landmarks, and
s. Will wetlands be crossed in transporting equipment the like.
to project site? No If yes, explain steps that will
be taken to lessen environmental impacts. A stormwater management plan, if applicable, that
may have been developed in consultation with the
Division of Environmental Management.
A list of the names and complete addresses of the
adjacent waterfront (riparian) landowners. These
individuals have 30 days in which to submit comments
7 SHORELINE STABILIZATION on the proposed project to the Division of Coastal
Management and should be advised by the applicant of
a. Length of bulkhead or riprap N/A that opportunity.
b. Average distance waterward of mean high water or
normal water level N/A
2 R]1
Name See Attachment B
Address
Name
Address
9 CERTIFICATION AND PERMISSION
TOj ENTER ON LAND
Any pe 't issued in response to this application will
allow o y the development described in the application.
The pro'ect will be subject to conditions and restrictions
contained in the permit.
Name
Address I cerdf?, that to the best of my knowledge, the proposed
activity! complies with the State of North Carolina's ap-
proved Poastal Management Program and will be con-
A list of previous state or federal permits issued for ducted In a manner consistent with such program.
work on the project tract. Include permit numbers,
penmittee, and issuing dates. I furth r certify that I am authorized to grant, and do in
DEHNR - Public water 95-08399 fact, grant permission to representatives of state and
federal view agencies to enter on the aforementioned
11-22-94 lands ' connection with evaluating information relafed
to this emit application and follow-up monitoring of
A check for $250 made payable to the Department of
Environment, Health, and Natural Resources to cover
the costs of processing the application.
A signed AEC hazard notice for projects in oceanfront
and inlet areas.
A 'statement on the use of public funds. If the project
involves the expenditure of public funds, attach a state-
ment documenting compliance with the North Carolina
Environmental Policy Act (N.C.G.S. 113A-1 to 10).
This is the i day of A Pl-1 ?- ,19 ?.
X Z-t,- `--Lando er r Authorized agent
APR 9' 7 1 995
?I
4 3/91