Loading...
HomeMy WebLinkAbout20181461 Ver 1_Mitigation Plan_20190904ID#* 20181461 Select Reviewer:* Mac Haupt Initial Review Completed Date 09/04/2019 Mitigation Project Submittal - 9/4/2019 Version* 1 Is this a Prospectus, Technical Proposal or a New Site? * Type of Mitigation Project:* W Stream W Wetlands r Buffer r Nutrient Offset (Select all that apply) Project Contact Information Contact Name:* Kyle Halchin Project Information Existing 20181461 (DWR) (nunbersonly ...nodash) ID#:* Project Type: r DMS f• Mitigation Bank Project Name: Beaufort 56 County: Beaufort Document Information (- Yes (-- Email Address:* kyle.halchin@kimley-horn.com Existing Version: (nurrbersonly) Mitigation Document Type:* Mitigation Plans File Upload: Beaufort56_Plans.pdf 10.53MB Rease upload only one RDF of the conplete file that needs to be subnitted... Signature Print Name:* Kyle Halchin Signature: C BEAUFORT 56 STREAM AND WETLAND MITIGATION BANK PREPARED FOR COVER SHEET01 WEYERHAEUSER NR COMPANYBEAUFORT COUNTY, NORTH CAROLINAVICINITY MAPNORTHENGINEER:CHARLOTTE, NORTH CAROLINA 28202200 SOUTH TRYON STREET, SUITE 200KIMLEY-HORN AND ASSOCIATES, INC. (704) 319-7699DAREN PAIT, P.E., CFMOWNER:HATTIESBURG, MS 39402406 COLE ROADWEYERHAEUSER NR COMPANY(601) 341-6054DOUG HUGHESPRELIMINARY - NOT FOR CONSTRUCTIONBEAUFORT 56DRAFT MITIGATION PLANSforSURVEY:BASE MAPPING PROVIDED BY:2014 QL2 LIDARMETADATA CONTACT:NC FLOODPLAIN MAPPING PROGRAM4105 REEDY CREEK DRIVERALEIGH, NC 27607(919) 715-5711Sheet List TableSheetNumberSheet Title GENERAL NOTES02BEAUFORT 56 STREAM AND WETLAND MITIGATION BANK PREPARED FOR PROPOSED PLAN LEGENDPROPOSED PROFILE LEGENDEXISTING PLAN LEGEND1035+00LEGENDS AND SYMBOLS03BEAUFORT 56 STREAM AND WETLAND MITIGATION BANK PREPARED FOR RIFFLERIFFLERIFFLEMEANDERINGPOOLMEANDERINGPOOLSTRAIGHTPOOLTYPICAL PLAN AND PROFILE04BEAUFORT 56 STREAM AND WETLAND MITIGATION BANK PREPARED FOR TYPICAL SECTIONS05BEAUFORT 56 STREAM AND WETLAND MITIGATION BANK PREPARED FOR S H E E T 0 7 SH E E T 0 8 SH E E T 0 9 SH E E T 1 0 SH E E T 11 SHEET 12 S H E E T 1 3 SHEET 14SHEET 15PO L L AR D SW AM P -RE A C H 1 P O L L A R D S W A M P - R E A C H 3 UT3UT2PO L L A R D SW AM P - R E A C H 2 OVERALL PLAN AND KEY SHEET06 NORTHBEAUFORT 56 STREAM AND WETLAND MITIGATION BANK PREPARED FOR POLLARD SWAMP - REACH 1MATCH LINE STA 10+00 SEE SHEET 08 Hor. Scale:1"=40'0+000+501+001+502+002+503+003+504+004+505+005+506+006+507+007+508+008+509+009+5010+00PLAN AND PROFILE - POLLARD SWAMP REACH 107 NORT H BEAUFORT 56 STREAM AND WETLAND MITIGATION BANK PREPARED FOR POLLARD SWAMP - REACH 1MATCH LINE STA 10+00SEE SHEET 07 MATCH LIN E S T A 2 0 + 0 0 SEE SHEET 0 9 Hor. Scale:1"=40'10+0010+5011+0011+5012+0012+5013+0013+5014+0014+5015+0015+5016+0016+5017+0017+5018+0018+5019+0019+5020+00PLAN AND PROFILE - POLLARD SWAMP REACH 108 NORTH BEAUFORT 56 STREAM AND WETLAND MITIGATION BANK PREPARED FOR POLLARD SWAMP - REACH 1POLLARD SWAMP - REACH 2MATCH LINE STA 20+00SEE SHEET 08 MATCH LIN E S T A 3 0 + 0 0 SEE SHEET 1 0 Hor. Scale:1"=40'20+0020+5021+0021+5022+0022+5023+0023+5024+0024+5025+0025+5026+0026+5027+0027+5028+0028+5029+0029+5030+00PLAN AND PROFILE - POLLARD SWAMP REACH 1&209 NORTHBEAUFORT 56 STREAM AND WETLAND MITIGATION BANK PREPARED FOR POLLARD SWAMP - REACH 2MATCH LINE STA 30+00SEE SHEET 09 MATCH LINE STA 4 0 + 0 0 SEE SHEET 11 Hor. Scale:1"=40'30+0030+5031+0031+5032+0032+5033+0033+5034+0034+5035+0035+5036+0036+5037+0037+5038+0038+5039+0039+5040+00PLAN AND PROFILE - POLLARD SWAMP REACH 210 NORTH BEAUFORT 56 STREAM AND WETLAND MITIGATION BANK PREPARED FOR POLLARD SWAMP - REACH 2 UT2(SEE SHEET 14) U T 3 ( S E E S H E E T 1 5 ) MATCH LINE STA 40+00SEE SHEET 10 MATCH LINE STA 50+00 SEE SHEET 12 Hor. Scale:1"=40'40+0040+5041+0041+5042+0042+5043+0043+5044+0044+5045+0045+5046+0046+5047+0047+5048+0048+5049+0049+5050+00PLAN AND PROFILE - POLLARD SWAMP REACH 211 NORT H BEAUFORT 56 STREAM AND WETLAND MITIGATION BANK PREPARED FOR Hor. Scale:1"=40'50+0050+5051+0051+5052+0052+5053+0053+5054+0054+5055+0055+5056+0056+5057+0057+5058+0058+5059+0059+5060+00POLLARD SWAMP - REACH 2MATCH LINE STA 50+00SEE SHEET 11 MATCH LINE STA 60+00 SEE SHEET 13 PLAN AND PROFILE - POLLARD SWAMP REACH 2&312 NORTH BEAUFORT 56 STREAM AND WETLAND MITIGATION BANK PREPARED FOR POLLARD SWAMP - REACH 3MATCH LINE STA 60+00SEE SHEET 12Hor. Scale:1"=40'60+0060+5061+0061+5062+0062+5063+0063+5064+0064+5065+0065+50PLAN AND PROFILE - POLLARD SWAMP REACH 313 NOR T H BEAUFORT 56 STREAM AND WETLAND MITIGATION BANK PREPARED FOR POLLARDSWAMP -REACH 2UT2UT3Hor. Scale:1"=40'100+00100+50101+00101+50102+00102+50103+00103+50104+00104+50105+00105+50106+00106+50107+00107+50108+00108+50109+00109+50110+00PLAN AND PROFILE - UT214BEAUFORT 56 STREAM AND WETLAND MITIGATION BANK PREPARED FOR POLLARDSWAMP -REACH 2UT3Hor. Scale:1"=40'200+00200+50201+00201+50202+00202+50203+00203+50204+00204+50205+00205+50206+00206+50207+00207+50208+00208+50209+00209+50210+00210+50211+00211+50212+00PLAN AND PROFILE - UT315 NORTHBEAUFORT 56 STREAM AND WETLAND MITIGATION BANK PREPARED FOR Not to ScaleBRUSH AND ROLL RIFFLE1STREAM DETAILS16BEAUFORT 56 STREAM AND WETLAND MITIGATION BANK PREPARED FOR Not to ScaleLOG VANE2Not to ScaleLOG SILL3STREAM DETAILS17BEAUFORT 56 STREAM AND WETLAND MITIGATION BANK PREPARED FOR Not to ScaleBRUSH TOE PROTECTION5Not to ScaleLOG CROSS VANE4STREAM DETAILS27CRAVEN 26 STREAM AND WETLAND MITIGATION BANK PREPARED FOR Not to ScaleCHANNEL BLOCK6Not to ScaleFLOODPLAIN VERNAL POOL7STREAM DETAILS19BEAUFORT 56 STREAM AND WETLAND MITIGATION BANK PREPARED FOR Not to ScaleINSTALLATION GUIDE FOR EROSION CONTROL MATTING8Not to ScaleTEMPORARY SILT FENCE9EROSION CONTROL DETAILS20BEAUFORT 56 STREAM AND WETLAND MITIGATION BANK PREPARED FOR Not to ScaleEXAMPLE OF PUMP-AROUND OPERATION10EROSION CONTROL DETAILS21BEAUFORT 56 STREAM AND WETLAND MITIGATION BANK PREPARED FOR VEGETATION NOTES AND DETAILS22BEAUFORT 56 STREAM AND WETLAND MITIGATION BANK PREPARED FOR