Loading...
HomeMy WebLinkAboutSW6190602_Planset_20190903VICINITY M NOT TO SCA LEGEND: EIP Oo EIP—EXISTING IRON PIF ERBO ERB—EXISTING REBAR SRBO SRB—SET REBAR o COMPUTED POINT N/F — NOW OR FORMERLY R/W — RIGHT OF WAY PROPERI ADJACEN — — RIGHT-0 SETBACK OVERHEA — CREEK — — WETLANE PERMANE X FENCE L TREE LIN 150 MAJOR C 148 MINOR C +aa yF100 YEA u N /F HEADWATERS TIMBER, LLC C DB 2132, PG 969 u c r N /F GEORGE TERRY WILLIAMS DB 1287, PG 788 1' ERB 5/8' ERB 1 1 /2" EIP GRAPHIC 120 0 60 120 240 ( IN FEET ) 1 inch = 120 ft. 480 4Dsite solutions civil engineering I land surveying 409 Chicago Drive, Suite.U2, Fayetteville, NC 28306 office 1 910-426-6777 fax 1910-426-5777 license number I C-2354 www.4Dsitesotutions.com �CARO �Z// �2:pFSS0% SEA 02 •• G I NE ••: ja��� //;, COT T I1111'6\ REVISIONS PROJECT NAME EDGERTON INDUSTRIAL PARK STORM POND OVERALL SITE PLAN CLIENT HARNETT COUNTY ECONOMIC DEVELOPMENT 200 Alexander Drive Lillington, North Carolina 27546 Phone: (910) 814-6893 Fax: (910)814-8298 PROJECT INFORMATION DESIGNED BY: SCOTT DRAWN BY: SCOTT CHECKED BY: CHRIS PROJECT NUMBER: 1479 DRAWING SCALE HORIZONTAL: 1 "=120' DATE RELEASED AUGUST 2, 2019 SHEET NUMBER C-200 VICINITY MAP NOT TO SCALE LEGEND: EIP Qo EIP—EXISTING IRON PIPE ERBO ERB—EXISTING REBAR SRBO SRB—SET REBAR c COMPUTED POINT N/F — NOW OR FORMERLY R/W — RIGHT OF WAY PROPERTY LINE ADJACENT PROPERTY LINE — — RIGHT—OF—WAY SETBACK LINE OVERHEAD UTILITY — CREEK WETLANDS PERMANENT EASEMENT X FENCE LINE TREE LINE 150 MAJOR CONTOUR 148 MINOR CONTOUR too vF 100 YEAR FLOOD LINE N /F ERS TIMBER, LLC 132, PG 969 .. 00 40000� x 148.47' SPOT ELEVATION BENCHMARK E" SIGN E ELECTRICAL METER FEB] ELECTRICAL BOX m TRANSFORMER pp UTILITY POLE C• GUY WIRE M TELEPHONE PEDESTAL Fo FIBER OPTIC BOX wV D4 WATER VALVE �C, FIRE HYDRANT 1 WATER METER ❑o BACK FLOW PREVENTER iV IRRIGATION VALVE S SANITARY SEWER MANHOLE oco CLEANOUT i 0 WETLANDS BUILDINGS ' „ � — ERBE j,, 001 . ♦ EDGE OF WA" ♦ \ 30' N, ♦ BUFFE ♦ � o I ■ �7 l \ i o\ �5,64'40'15"W 542.13' N/F OLDCASTLE APG SOUTH, INC DB 2373, PG 878 PB 2006, PG 1100 TBM 4D DISK #1 N 552,918.568 E 2,108,163.589 R=75.00' ELEV 158.16 L-1CHORD NC GRID N A D 83 N 48°13' 17"E 137.63(2 011) R=110.00' N A VD 88 L=82.82' �CHORD S86°46'43"E 80.87' -x-x�x oCO I � ss / J® ^ —/ N71-39'11"E 657.96' x STORM ACCESS/MAINTENANCE EASEMENT F I 6' VEGETATED SHELF L 1 /4" 1 — ERA` /,---- 0 n7B„ ERB \ 30• \ STORM 0 \ Rg7Nq GF \ FgSFMFNT M N /F GEORGE TERRY WILLIAMS DB 1287, PG 788 N/F COUNTY OF HARNETT TRACT 4 DB 3334, PG 574 PB 2002, PG 313 \ �88 43'70„w \ 5/8" ERB 60 N71 °39'11 "E 826.10' SR 1927 (GATEWAY DRIVE) PUBLIC R/W VARIES ------------------- S64'38'56"W 419.91' GRAPHIC SCALE 0 30 60 120 ( IN FEET ) 1 inch = 60 ft. 1" EIP (PINCHED) 240 5/8„ ERB 1" ERB 5/8 ERB AXLE ■ site solutions civil engineering I land surveying 409 Chicago Drive, Suite.U2, Fayetteville, NC 28306 office 1 910-426-6777 fax 1910-426-5777 license number I C-2354 www.4Dsitesotutions.com "kCARO �Z// �2:pF SS0..V SEA 02 •• G � NE ••: ja��� //;, O I1111'6\ Ug U2-1� REVISIONS PROJECT NAME EDGERTON INDUSTRIAL PARK STORM POND SITE PLAN CLIENT HARNETT COUNTY ECONOMIC DEVELOPMENT 200 Alexander Drive Lillington, North Carolina 27546 Phone: (910) 814-6893 Fax: (910)814-8298 PROJECT INFORMATION DESIGNED BY: SCOTT DRAWN BY: SCOTT CHECKED BY: CHRIS PROJECT NUMBER: 1479 DRAWING SCALE HORIZONTAL: 1 "=60' DATE RELEASED AUGUST 2, 2019 SHEET NUMBER C-201 VICINITY MAP NOT TO SCALE LEGEND: EIP Qo EIP-EXISTING IRON PIPE ERBO ERB-EXISTING REBAR SRBO SRB-SET REBAR o COMPUTED POINT N/F - NOW OR FORMERLY R/W - RIGHT OF WAY PROPERTY LINE ADJACENT PROPERTY LINE - - RIGHT-OF-WAY -SETBACK LINE OVERHEAD UTILITY - CREEK WETLANDS PERMANENT EASEMENT X FENCE LINE TREE LINE 150 MAJOR CONTOUR 148 MINOR CONTOUR loo vF 100 YEAR FLOOD LINE X 148.47' SPOT ELEVATION BENCHMARK E" SIGN E ELECTRICAL METER e6 ELECTRICAL BOX [I]TRANSFORMER pp UTILITY POLE C• GUY WIRE Fil TELEPHONE PEDESTAL Fo FIBER OPTIC BOX WV D4 WATER VALVE ,, FIRE HYDRANT L�J WATER METER ❑o BACK FLOW PREVENTER iV IRRIGATION VALVE S SANITARY SEWER MANHOLE oco CLEANOUT i 0 WETLANDS 0 BUILDINGS GRADING NOTES a1. THE CONTRACTOR SHALL ASSUME RESPONSIBILITY FOR ALL 00 LAND DISTURBING ACTIVITIES AND ENSURE COMPLIANCE WITH THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN. THE CONTRACTOR SHALL INSPECT AND MAINTAIN ALL EROSION CONTROL DEVICES AND CLEAR ANY DEBRIS LEAVING THE SITE ON NEIGHBORING ROADS. 2. EXISTING GROUND UPON WHICH FILL OR BASE IS TO BE PLACED SHALL BE CLEARED OF WEEDS, DEBRIS, TOPSOIL, AND ALL OTHER DELETERIOUS MATERIALS; NO FILL SHALL BE PLACED UNTIL PREPARATION OF THE EXISTING GROUND HAS BEEN COMPLETED 3. PROTECTIVE MEASURES SHALL BE TAKEN BY THE CONTRACTOR AND THE OWNER TO PROTECT ADJACENT PROPERTY, THE PUBLIC AND UTILITIES DURING GRADING OPERATIONS. THE CONTRACTOR ASSUMES ALL LIABILITY FOR THE UNDERGROUND UTILITY PIPES, CONDUITS, OR STRUCTURES, WHETHER SHOWN OR NOT ON THE PLAN 4. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE LOCATION OF ALL UTILITIES OR STRUCTURES ABOVE AND BELOW GROUND, SHOWN OR NOT SHOWN ON THESE PLANS. THEY WILL BE HELD RESPONSIBLE FOR ALL DAMAGE TO ANY UTILITIES OR STRUCTURES CAUSED BY HIS OPERATION. 5. ALL CUT AND FILL SLOPES SHOULD BE INVESTIGATED BOTH DURING AND AFTER GRADING BY THE CONTRACTOR TO DETERMINE IF ANY SLOPE STABILITY PROBLEMS EXIST. IF IT IS DETERMINED THAT THERE IS A SLOPE STABILITY PROBLEM THE ENGINEER OF RECORD SHOULD BE NOTIFIED. 6. STOCKPILE AREAS THAT WILL EXCEED 10' IN HEIGHT SHOULD BE GRADED WITH 3:1 SLOPES AND SURROUNDED BY SILT FENCE. 7. APPROVED COPIES OF THE GRADING AND EROSION CONTROL PLANS SHALL BE ON THE PERMITTED SITE WHILE WORK IS IN PROGRESS. 8. ALL EXISTING DRAINAGE COURSES THROUGH THIS SITE SHALL REMAIN IN A CONDITION SUCH THAT THEY CAN TRANSPORT THE NATURAL DRAINAGE UNTIL FACILITIES TO HANDLE THE STORM WATER ARE CONSTRUCTED. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE DUE TO OBSTRUCTING NATURAL DRAINAGE PATTERNS. 9. ANY DEVIATION FROM THE APPROVED GRADING PLAN SHOULD BE REPORTED TO THE ENGINEER OF RECORD PRIOR TO IMPLEMENTATION OF THE CHANGE. 10. ALL SLOPES 3:1 OR STEEPER THAT EXTEND TEN FEET OR MORE SHALL BE LINED WITH NORTH AMERICAN GREEN S75 TEMPORARY EROSION CONTROL BLANKET OR EQUAL SUBSTITUTE. 11. STORM PIPE DISTANCES SHOWN ARE TO THE CENTER OF THE BOX FOR ALL STRUCTURES UNLESS OTHERWISE NOTED. NOTIFICATION OF COMBINED SELF -MONITORING AND SELF -INSPECTION FORM: THE SEDIMENTATION POLLUTION CONTROL ACT WAS AMENDED IN 2006 TO REQUIRE THAT PERSONS RESPONSIBLE FOR LAND -DISTURBING ACTIVITIES INSPECT A PROJECT AFTER EACH PHASE OF THE PROJECT TO MAKE SURE THAT THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN IS BEING FOLLOWED. RULES DETAILING THE DOCUMENTATION OF THESE INSPECTIONS TOOK EFFECT OCTOBER 1, 2010. TO SIMPLIFY DOCUMENTATION OF SELF -INSPECTION REPORTS AND NPDES SELF -MONITORING REPORTS, DWQ AND DEMLR DEVELOPED A COMBINED FORM. THE SELF -INSPECTION PROGRAM IS SEPARATE FROM THE WEEKLY SELF -MONITORING PROGRAM OF THE NPDES STORMWATER PERMIT FOR CONSTRUCTION ACTIVITIES. THE FOCUS OF THE SELF -INSPECTION REPORT IS THE INSTALLATION AND MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES ACCORDING TO THE APPROVED PLAN. THE INSPECTIONS SHOULD BE CONDUCTED AFTER EACH PHASE OF THE PROJECT, AND CONTINUED UNTIL PERMANENT GROUND COVER IS ESTABLISHED. THE FORM CAN BE ACCESSED AT: HTTP: //PORTAL.NCDENR.ORG/WEB/LR/EROSION IF YOU HAVE QUESTIONS OR CANNOT ACCESS THE FORM, PLEASE CONTACT THE FAYETTEVILLE REGIONAL OFFICE AT (910) 433-3300. R=75.00' L=174.27' CHORD N 48°13' 17"E 137.63' TBM 4D DISK #1 N 552,918.568 E 21108,163.589 ELEV 158.16 NC GRID NAD 83 (2011) NAVD 88 -x-x-1 x o00 ss- 657.96 \ ES �v IOOI 00� OOl 00� OOl OOl 00� 00� DIVO01 - )IVa�-6TVa�- DI�� „ v ERB FSTORM ACCESS/MAINTENANCE EASEMENT 1 4 0 IX00i, I `, /,---- Id) TEMPORARY ♦� ` SF v CONSTRUCTION n O TEMPORARY DIVERSION BERM ENTRANCE / TO BE SEEDED WITHIN 7 DAYS j ♦� \ 30' EMERGENCY (TYP) °G ` / \ SPILLWAY TO BE I l j COVERED WITH _ ♦ \��\ 2r TURF REINFORCED / ♦ Q MATTING 10' MAINTENANCE p \ N ACCESS WITH 2% o MAX X-SLOPE J I EDGE OF WATERY I *ATTACH A 2.5FAIRCLOTH SKIMMER WITH A I / s " � a I 2.3" DIAMETER ORIFICE FOR DEWATERING THE p ` I I SKIMMER BASIN DURING CONSTRUCTION. ♦ \ 30' NATURA\ RI-1 ♦ \ �BUFFER I v% BOTTOM OF SHELF TEMPORARY SKIMMER BASIN #I I ` CONCRETE ANTI -SEEP ELEV: 145.50' L=396', W=123', D=6.5' SIDE SLOPES= 2:1 ♦ \ 10 COLLAR I I TOP OF BASIN: 151.75' ♦ o ` I 'tll' ;IIII� BOTTOM OF BASIN: 139.50' 30' EMERGENCY SPILLWAY 150 75' N/F OLDCASTLE APG SOUTH, INC DB 2373, PG 878 PB 2006, PG 1100 R=110.00' L=82.82' CHORD S86°46'43"E 80.87' W EROSION CONTROL NOTES 1. ALL INLET/OUTLET PROTECTION WILL BE CHECKED FOR MAINTENANCE AND FAILURE EACH ACTIVE DAY ON SITE. SEDIMENT WILL BE REMOVED FROM THE SEDIMENT TRAP AND INLET PROTECTION DEVICES WHEN THE STORAGE CAPACITY HAS BEEN APPROXIMATELY 50% FILLED. GRAVEL WILL BE CLEANED OR REPLACED WHEN THE SEDIMENT POOL NO LONGER DRAINS PROPERLY. SEDIMENT WILL BE REMOVED FROM BEHIND THE SEDIMENT FENCE WHEN IT BECOMES ABOUT 0.5' DEEP AT THE FENCE. THE SEDIMENT FENCE WILL BE REPAIRED AS NEEDED TO MAINTAIN A PROPER BARRIER. 2. TEMPORARY EROSION CONTROL FACILITIES AND/OR PERMANENT FACILITIES INTENDED TO CONTROL EROSION OF AND EARTH DISTURBANCE OPERATION SHALL BE INSTALLED BEFORE ANY EARTH DISTURBANCE OPERATIONS TAKE PLACE OR AT THE EARLIEST POSSIBLE POINT DURING CONSTRUCTION. 3. TEMPORARY & PERMANENT EROSION CONTROL MEASURES SHALL BE CONSTRUCTED PER THE DETAILS HEREIN, OR SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. 4. THE CONTRACTOR MUST NOTIFY THE APPROPRIATE NCDEQ OFFICE A MINIMUM OF 48 HOURS PRIOR TO BEGINNING ANY LAND DISTURBING ACTIVITIES. 910-433-3300 5. REMOVE ALL SOILS AND SEDIMENTS TRACKED OR OTHERWISE DEPOSITED ONTO PUBLIC AND PRIVATE PAVEMENT AREAS. REMOVAL SHALL BE ON A DAILY BASIS WHEN TRACKING OCCURS. 6. LOCATE SOIL STOCKPILES NO LESS THAN TWENTY-FIVE (25) FEET FROM ANY PUBLIC OR PRIVATE ROADWAY OR DRAINAGE CHANNEL. IF REMAINING FOR MORE THAN SEVEN DAYS, STABILIZE THE STOCKPILES BY VEGETATIVE COVER, TARPS, OR OTHER MEANS. CONTROL EROSION FROM ALL STOCKPILES BY PLACING SILT BARRIERS AROUND THE PILES. TEMPORARY STOCKPILES LOCATED ON PAVED SURFACES MUST BE NO LESS THAN FIVE FEET FROM THE DRAINAGE/GUTTER LINE AND SHALL BE COVERED IF LEFT MORE THAN 24 HOURS. 7. MAINTAIN ALL TEMPORARY EROSION AND SEDIMENT CONTROL DEVICES IN PLACE UNTIL THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED. INSPECT TEMPORARY EROSION AND SEDIMENT CONTROL DEVICES ON A DAILY BASIS AND REPLACE DETERIORATED, DAMAGED, OR ROTTED EROSION CONTROL DEVICES IMMEDIATELY. 8. TEMPORARILY OR PERMANENTLY STABILIZE ALL DENUDED AREAS WHICH HAVE BEEN FINISH GRADED, AND ALL DENUDED AREAS IN WHICH GRADING OR SITE BUILDING CONSTRUCTION OPERATIONS ARE NOT ACTIVELY UNDERWAY AGAINST EROSION DUE TO RAIN, WIND AND RUNNING WATER WITHIN 14 DAYS. USE SEEDING AND MULCHING, EROSION CONTROL MATTING, AND/OR SODDING AND STAKING IN GREEN SPACE AREAS AND OTHERWISE APPROPRIATE MEASURES. USE EARLY APPLICATION OF GRAVEL BASE ON AREAS TO BE PAVED. 9. DO NOT REMOVE ANY EROSION AND SEDIMENT CONTROL DEVICES AFTER THE PROTECTED AREA HAS UNDERGONE FINAL STABILIZATION AND PERMANENT VEGETATION HAS BEEN ESTABLISHED, IT IS RECOMMENDED THAT NCDEQ APPROVE THE ACTION PRIOR TO REMOVAL. 10. THE CONSTRUCTION ENTRANCE SHALL BE INSTALLED CONCURRENTLY WITH THE INITIATION OF CONSTRUCTION ACTIVITY. 11. THE INSTALLATION OF EROSION CONTROL MEASURES SHALL TAKE PRECEDENCE OVER ALL OTHER CONSTRUCTION ACTIVITIES. 12. THE PERMITTEE SHALL BE HELD RESPONSIBLE FOR THE ACTIONS AND PERFORMANCE OF ANY OTHER PARTIES PERFORMING WORK ON THIS PROJECT. 13. ALL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE CHECKED FOR STABILITY AND OPERATION FOLLOWING EVERY RUNOFF -PRODUCING RAINFALL BUT IN NO CASE LESS THAN ONCE EVERY WEEK. ANY NEEDED REPAIRS WILL BE MADE IMMEDIATELY TO MAINTAIN ALL PRACTICES AS DESIGNED. 14. PURSUANT TO G.S. 113A-57(2), THE ANGLE FOR GRADED SLOPES AND FILLS SHALL BE NO GREATER THAN THE ANGLE THAT CAN BE RETAINED BY VEGETATIVE COVER OR OTHER ADEQUATE EROSION CONTROL DEVICES OR STRUCTURES. IN ANY EVENT, SLOPES LEFT EXPOSED WILL, WITHIN 7 OR 14 CALENDAR DAYS OF COMPLETION OF ANY PHASE OF GRADING, BE PLANTED OR OTHERWISE PROVIDED WITH TEMPORARY OR PERMANENT GROUND COVER, DEVICES OR STRUCTURES SUFFICIENT TO RESTRAIN EROSION. PURSUANT TO G.S. 113A-57(3), PROVISIONS FOR PERMANENT GROUND COVER SUFFICIENT TO RETAIN EROSION MUST BE ACCOMPLISHED FOR ALL DISTURBED AREAS WITHIN 14 WORKING DAYS OR 90 CALENDAR DAYS (WHICHEVER IS SHORTER) FOLLOWING COMPLETION OF CONSTRUCTION DEVELOPMENT. 15. CONTRACTOR IS RESPONSIBLE FOR INSTALLING ALL EROSION CONTROL MEASURES SHOWN AND ANY ADDITIONAL MEASURES REQUIRED TO CONTROL THE SEDIMENT DURING THE COURSE OF CONSTRUCTION. 16. ALL SEEDED AREAS WILL BE FERTILIZED, RESEEDED AS NECESSARY, AND MULCHED ACCORDING TO THE DETAILS HEREIN. 17. THE CONTACT PERSON FOR EROSION CONTROL ISSUES THAT ARISE ON SITE IS ANGIE STEWART. CONTACT 910-814-6893. ss ss N71 °39'11 "E 826.10' SR 1927 (GATEWAY DRIVE) PUBLIC R/W VARIES W W W -- -- -- -- -- -- /-- -- - -- -- -- -- --- ,� 1" EIP (PINCHED) I l�l J INVERT OF SKIMMER: 146.00' / J RIP RAP DISSIPATER ♦ \ ^/ 1 � TOP OF SHELF I I 1 I f SIDE SLOPES OF SEEDED WITHIN BASIN SEVENARE DAYS. / I L=24' W=9'/27' n� III ELEV: 146.50' � ; f -4 D50=10" DMAX=15" FES0 -2-� I �5p "ATTACH A 2.0" FAIRCLOTH SKIMMER (OR EQUAL) i 00 CLASS 1 23" THICK ` CC) N t WET POND #1 / WITH 0.8" ORIFICE FOR DEWATERING THE LO i�o ^ N / II II I I SKIMMER BASIN DURING CONSTRUCTION. N /F �° I J ER S TIMBER, LLC o ' N� RAP I I / WATER POND / \. m i0 I i� ■ SLOPES AS 13 2, P G 969 Z y I SHOWN I 1 YR HIGH WATER:147.85' 0 1 Z I I , I 10 YR HIGH WATER: 150.46' _j LIMITS OF o rnn 1 ' TOP OF POND: 151.75' �� CONSTRUCTION ° \ 1 ) INVERT OF POND: 139.50' 4.8 AC ■ � �v 5 ,N EMERGENCY SPILLWAY: 150.75' I **AFTER SITE IS STABILIZED, CONVERT SEDIMENT BASIN TO N PERMANENT WET POND AS I FOREBAY IR I I I SHOWN. o° LENGTH: 10' III FOREBAY OV ELEV. 145.50' r0 I II I INV AT END: 138.50' INV AT SPILLWAY: 139.50' / I (p00 ' I�i ►1 / \ N - / DI V BOG E R \ TEMPORARY SILT JS I L� \ FENCE ( TYP) �/�' LOCH 30• \ J �- LOC-'� LOC STOR \ 8\ LOCH LOCH LOC x-x x-x M DRq/Alj \ \ 542.13' n jx= F'qS �64'40'15"W � >1 / / 00 / ✓ w (V / N o l �1 0 I 1 / 1 � I � I GROUND STABILIZATION CHART N8S43/0„ \ \ oo a A Know what's below. I 4_e Call before you dig. SITE AREA STABILIZATION STABILIZATION TIME DESCRIPTION TIME FRAME FRAME EXCEPTIONS PERIMETER DIKES, SWALES, DITHCES 7 DAYS NONE AND SLOPES HIGH QUALITY WATER (HQW) 7 DAYS NONE ZONES IF SLOPES ARE 10' OR SLOPES STEEPER 7 DAYS LESS IN LENGTH AND ARE THAN 3:1 NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED SLOPES 3:1 OR 7-DAYS FOR SLOPES FLATTER 14 DAYS GREATER THAN 50 FEET IN LENGTH NONE ALL OTHER AREAS (EXCEPT FOR WITH SLOPES FLATTER 14 DAYS PERIMETERS AND THAN 4:1 HQW ZONES) \ \ 5/8„ ERB CONSTRUCTION SEQUENCE 5/8„ 419.91' 1. OBTAIN ALL NECESSARY PERMITS AND APPROVALS AND ERB S64'38'56"W HOLD PRE CONSTRUCTION CONFERENCE. \ 2. INSTALL STONE CONSTRUCTION ENTRANCE, TEMPORARY DIVERSION BERMS AND TEMPORARY SILT FENCE WHERE SPECIFIED. 3. CONSTRUCT TEMPORARY SEDIMENT BASIN. 4. SITE CLEAR AND AS N /F 5. ROUGH GRA ER THETHE SITE ANDAPPLY TDEMPORARY SEEDING GRAPHIC SCALE GEORGE TERRY WILLIAMS 6. POERFORMSFNEMGIRADNGSSED. DB 1287, PG 788 7 AREAILIZE, SEED AND MULCH ALL REMAINING DISTURBED 60 0 30 60 120 240 8. UPON SITE STABILIZATION, SEEK NCDEQ APPROVAL TO REMOVE ALL TEMPORARY MEASURES. 1' 9. ALL EROSION CONTROL MEASURES SHALL BE MAINTAINED AS OUTLINED IN THE DETAILS WITHIN THE PLANS AND ( IN FEET ) ERB ACCORDING TO THE NCDEQ EROSION CONTROL MANUAL. 1 inch = 60 ft. - I E ice„ THE CONTRACTOR MUST CONTACT NORTH CAROLINA ONE CALL CENTER AT 1-800-632-4949 A MINIMUM OF 72 HOURS PRIOR TO DIGGING IN ORDER TO HAVE THE EXISTING UTILITIES LOCATED 0site solutions civil engineering I land surveying 409 Chicago Drive, Suite 112, Fayetteville, NC 28306 office 1 910-426-6777 fax 1910-426-5777 license number I C-2354 www.4Dsitesotutions.com ``�` y\ IICARO � `� Q••".....•� �''' / Imo' �,240 .OFESS /�r�,••:�'y�� SEA 02 •� G � NE .•: ja��� COTT REVISIONS PROJECT NAME EDGERTON INDUSTRIAL PARK STORM POND GRADING AND EROSION CONTROL PLAN CLIENT HARNETT COUNTY ECONOMIC DEVELOPMENT 200 Alexander Drive Lillington, North Carolina 27546 Phone: (910) 814-6893 Fax: (910)814-8298 PROJECT INFORMATION DESIGNED BY: SCOTT DRAWN BY: SCOTT CHECKED BY: CHRIS PROJECT NUMBER: 1479 DRAWING SCALE HORIZONTAL: 1 "=60' DATE RELEASED AUGUST 2, 2019 SHEET NUMBER C-3nO ILC VICINITY MAP NOT TO SCALE LEGEND: EiP Qo EIP—EXISTING IRON PIPE ERBO ERB—EXISTING REBAR SRBO SRB—SET REBAR c COMPUTED POINT N/F — NOW OR FORMERLY R/W — RIGHT OF WAY PROPERTY LINE ADJACENT PROPERTY LINE — — RIGHT—OF—WAY SETBACK LINE OVERHEAD UTILITY — CREEK WETLANDS PERMANENT EASEMENT X FENCE LINE TREE LINE 150 MAJOR CONTOUR 148 INOR CONTOUR ioo vF 00 YEAR FLOOD LINE 00 LO 0 L0 0 .. X 148.47' SPOT ELEVATION BENCHMARK s SIGN E ELECTRICAL METER FEB] ELECTRICAL BOX m TRANSFORMER pp UTILITY POLE C• GUY WIRE M TELEPHONE PEDESTAL Fo FIBER OPTIC BOX WV D4 WATER VALVE �C, FIRE HYDRANT 1 WATER METER ❑o BACK FLOW PREVENTER iV IRRIGATION VALVE SS SANITARY SEWER MANHOLE oco CLEANOUT 0 WETL NDS 0 BUIL GS N/F OLDCASTLE APG SOUTH, INC DB 2373, PG 878 PB 2006, PG 1100 TBM 4D DISK #1 N 5522918.568 E 2,108,163.589 R=75.00' ELEV 158.16 L-174.27 CHORD NC GRID N A D 83 N 48°13' 17"E 137.63' (2 011) R=110.00' N AVD 88 L=82.82' �CHORD S86°46'43"E 80.87' �x—LCD x ssI N71'39'11"E 657.96' 1I .�gg„ i ( 4 / w �w w ♦ \ Ate\ ERB � � ' / ' \`22 t \x 148.43 I / RI-1 ` \ III i 5 4 1 FES-2 \ I r / I DRAINAGE AREA #1 17.1 ACRES 11 , t i, ERB / \ � x o\ X14(1— x ` S,64°4015542.1x x X"W 3. x �x� / G \ N88 3170„ o •8>• 5 /J - - ERB E � S54°38'56"W 419.91'1 0 0 N/F GRAPHIC SCALE GEORGE TERRY WILLIAMS 60 ° 30 60 120 240 Know wh fs below. e DB 1287, PG 788 Call before . you di '� � ( IN FEET ) I " 1 inch = 60 ft. E R B THE CONTRACTOR MUST CONTACT NORTH CAROLINA ONE CALL CENTER AT 1-800-632-4949 A MINIMUM OF 72 HOURS PRIOR TO DIGGING IN ORDER TO HAVE THE EXISTING UTILITIES LOCATED tK� � N71 °39'11 "E 826.10' SR 1927 (GATEWAY DRIVE) PUBLIC R/W VARIES w-- w w -- ---- -- -- -- -- -- -- -- --- (PINCHED) / J / � 1 I -w — VA a —5/8„—- ERB — — 4Dsite solutions 04 civil engineering I land surveying 409 Chicago Drive, Suite 112, Fayetteville, NC 28306 office 1 910-426-6777 fax 1910-426-5777 license number I C-2354 www.4Dsitesotutions.com "kCARO �Z// �2:pF SSO..V SEA 02 •G � NE .•: ja��� //;, O fl �I %'6\ Ug U2-1� REVISIONS PROJECT NAME EDGERTON INDUSTRIAL PARK STORM POND DRAINAGE AREA MAP CLIENT HARNETT COUNTY ECONOMIC DEVELOPMENT 200 Alexander Drive Lillington, North Carolina 27546 Phone: (910) 814-6893 Fax: (910)814-8298 PROJECT INFORMATION DESIGNED BY: SCOTT DRAWN BY: SCOTT CHECKED BY: CHRIS PROJECT NUMBER: 1479 DRAWING SCALE HORIZONTAL: 1 "=60' DATE RELEASED AUGUST 2, 2019 SHEET NUMBER C-3ol N� 180 175 170 165 160 155 150 TO BOTT( 145 140 135 130 125 120 -1 F 44 �i / Rr7 m w elf \� _ / ' lfv '� \ 'So00 \ • � \ ZTZi�-C� ♦ ! ;Z �7 Vj r rat I I ..60 o IIII �p 146 148 - — 150 152 —� A53 152 154 \ C/) m < c� z �orl \ /1 �� ���� mr`7���>m XC) Z rm wo Zoo n'0-0=c5cnz \ p- \ o S O D 's mN Z �\ \ CO p y CD -C n'Ij -4 P O \i STORM POND STORM DRAIN -0+50 TO 4+50 10' MAINTENANCE SHELF EXISTING GROUND v D OF SHELF: 146.50' 6 IM OF SHELF: 145.50' -------------- 1 YR STORM: 148.20' V-NORMAL POOL: 146.00' N z 0 SEDIMENT CLEANOUT: 140.50' - N p w Z INVERT: 139.50' CV CID r 00 ° O� M 0 . t r 0 r7 to cfl to 04 n 0+00 1 +00 2+00 3+00 4+00 180 180 175 175 170 170 165 165 160 160 155 155 150 150 145 145 140 140 135 135 130 130 125 125 120 120 RI-1 TO FES-2 STORM DRAIN -0+50 TO 2+00 CV I 1n w 0 0 oo'� O o �� o o m> FINISHED GROUND 0 0_ Z \ f/) o o o� o— 00� =) n» �" ±z T 0_ N I u- 112.38 LF ® 0.899 36" RCP — \/STj o ANTI —SEEP COLLAR O �!l 0o co w � 00 L0 0+00 1 +00 180 175 170 165 160 155 150 145 140 135 130 125 120 GRAPHIC SCALE 60 0 30 60 120 240 ( IN FEET ) 1 inch = 60 ft. 4Dsite solutions civil engineering I land surveying 409 Chicago Drive, Suite.U2, Fayetteville, NC 28306 office 910-426-6777 fax 1910-426-5777 license number I C-2354 www.4Dsitesotutions.com REVISIONS PROJECT NAME EDGERTON INDUSTRIAL PARK STORM POND STORM PROFILES CLIENT HARNETT COUNTY ECONOMIC DEVELOPMENT 200 Alexander Drive Lillington, North Carolina 27546 Phone: (910) 814-6893 Fax: (910)814-8298 PROJECT INFORMATION DESIGNED BY: SCOTT DRAWN BY: SCOTT CHECKED BY: CHRIS PROJECT NUMBER: 1479 DRAWING SCALE HORIZONTAL: 1 "=60' VERTICAL: 1 "=6' DATE RELEASED AUGUST 2, 2019 SHEET NUMBER C-400 TEMPORARY SEEDING/MULCHING SPECIFICATIONS (FOR LATE WINTER AND EARLY SPRING) SEEDING MIXTURE: SPECIES RATE (LB./ACRE) RYE (GRAIN) 120 ANNUAL KOBE LESPEDEZA 50 OMIT ANNUAL LESPEDEZA WHEN DURATION OF TEMPORARY COVER IS NOT EXTEND BEYOND JUNE. SEEDING DATES: JANUARY 1 - MAY 1 SOIL AMENDMENTS: FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 LBJACRE GROUND AGRICULTURAL LIMESTONE AND 750 LB./ACRE 10-10-10 FERTILIZER. MULCH: APPLY 4,000 LBJACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. MAINTENANCE: REFERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, REFERTILIZE AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE. TEMPORARY SEEDING/MULCHING SPECIFICATIONS (FOR SUMMER) SEEDING MIXTURE: SPECIES RATE (LB./ACRE) GERMAN MILLET 40 A SMALL -STEMMED SUDANGRASS MAY BE SUBSTITUTED AT A RATE OF 50 LB./ACRE. SEEDING DATES: MAY 1- AUGUST 15 SOIL AMENDMENTS: FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 LBJACRE GROUND AGRICULTURAL LIMESTONE AND 750 LB./ACRE 10-10-10 FERTILIZER. MULCH: APPLY 4,000 LB./ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. MAINTENANCE: REFERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, REFERTILIZE AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE. TEMPORARY SEEDING/MULCHING SPECIFICATIONS (FOR FALL) SEEDING MIXTURE: SPECIES RATE (LB./ACRE) RYE (GRAIN) 120 SEEDING DATES: AUGUST 15 - DECEMBER 30 SOIL AMENDMENTS: FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 LBJACRE GROUND AGRICULTURAL LIMESTONE AND 1,000 LB./ACRE 10-10-10 FERTILIZER. MULCH: APPLY 4,000 LB./ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. MAINTENANCE: REPAIR AND REFERTILIZE DAMAGED AREAS IMMEDIATELY. TOP DRESS WITH 50 LB./ACRE OF NITROGEN IN MARCH. IF IT IS NECESSARY TO EXTEND TEMPORARY COVER BEYOND JUNE 15, OVERSEED WITH 50 LB./ACRE KOBE LESPEDEZA IN LATE OR EARLY MARCH. SEEDING MIXTURES: SPECIES RATE (LBS./ACRE TALL FESCUE 80 PENSACOLA BAHIAGRASS 50 SERICEA LESPEDEZA 30 KOBE LESPEDEZA 10 SEEDING NOTES: 1. FROM SEPT. 1 TO MAR. 1 USE UNSCARIFIED SERICEA SEED. 2. ON POORLY DRAINED SITES OMIT SERICEA AND INCREASE KOBE TO 30 LB./ACRE. 3. WHERE A NEAT APPEARANCE IS DESIRED, OMIT SERICEA AND INCREASE KOBE TO 40 LB./ACRE. NURSE PLANTS: BETWEEN APRIL 15 AND AUG. 15, ADD 10 LB./ACRE OF GERMAN MILLET OR 15 LB./ACRE SUDANGRASS. PRIOR TO MAY 1 OR AFTER AUG. 15, ADD 25 LB./ACRE RYE (GRAIN). SEEDING DATES: BEST POSSIBLE EARLY SPRING: FEB. 15 - MAR. 20 FEB. 15 - APR. 30 FALL: SEPT. 1 - SEPT. 30 SEPT. 1 - OCT. 31 SOIL AMENDMENTS: APPLY LIME AND FERTILIZER ACCORDING TO SOIL TEST, OR APPLY 3,000 - 5,000 LB./ACRE GROUND AGRICULTURAL LIMESTONE (USE THE LOWER RATE ON SANDY SOILS) AND 1,000 LB./ACRE 10-10-10 FERTILIZER. MULCH: APPLY 4,000 LB./ACRE GRAIN STRAW OR EQUIVALENT COVER OF ANOTHER SUITABLE MULCH. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR ROVING OR BY CRIMPING WITH A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. MAINTENANCE: IF GROWTH IS LESS THAN FULLY ADEQUATE, REFERTILIZE IN THE SECOND YEAR, ACCORDING TO THE SOIL TESTS OR TOP DRESS WITH 500 LB./ACRE 10-10-10 FERTILIZER. MOW AS NEEDED WHEN SERICEA IS OMITTED FROM THE MIXTURE. RESEED, FERTILIZE, AND MULCH DAMAGED AREAS IMMEDIATELY. SEEDING SPECIFICATIONS SEEDING MIXTURE: SPECIES RATE (LB./ACRE) COMMON BERMUDAGRASS 40-80(1-2 LB./1,000 FT2) SEEDING DATES: COASTAL PLAIN: APR. - JULY SOIL AMENDMENTS: APPLY LIME AND FERTILIZER ACCORDING TO SOIL TEST, OR APPLY 3,000 LB./ACRE GROUND AGRICULTURAL LIMESTONE AND 500 LB./ACRE 10-10-10 FERTILIZER. MULCH: USE JUTE, EXCELSIOR MATTING, OR OTHER EFFECTIVE CHANNEL LINING MATERIAL TO COVER THE BOTTOM OF CHANNELS AND DITCHES. THE LINING SHOULD EXTEND ABOVE THE HIGHEST CALCULATED DEPTH OF FLOW. ON CHANNEL SIDE SLOPES ABOVE THIS HEIGHT, AND IN DRAINAGES NOT REQUIRING TEMPORARY LININGS, APPLY 4,000 LB./ACRE GRAIN STRAW AND ANCHOR STRAW BY STAPLING NETTING OVER THE TOP. MULCH AND ANCHORING MATERIALS MUST NOT BE ALLOWED TO WASH DOWN SLOPES WHERE THEY CAN CLOG DRAINAGE DEVICES. MAINTENANCE: A MINIMUM OF 3 WEEKS IS REQUIRED FOR ESTABLISHMENT. INSPECTION AND REPAIR MULCH FREQUENTLY. REFERTILIZE THE FOLLOWING APR. WITH 50 LB./ACRE NITROGEN. 1 TEMPORARY SEEDING SPECIFICATIONS I 1 2 PERMANENT SEEDING SPECIFICATIONS 0 DRIVE STEEL POSTS 18" INTO THE GROUND ATTACH WIRE FENCE TO POSTS AND EXTEND NOTES: MAXIMUM 8' O.C. AND EXCAVATE A 4" X 8" TRENCH UPHILL ALONG THE LINE OF THE BOTTOM OF THE FENCE 8" INTO THE EXCAVATED TRENCH AND TURNED OUT POSTS. 4" IN THE TRENCH. 1. WIRE SHALL BE A MINIMUM OF 32 INCHES IN WIDTH AND TOP & BOTTOM STRAND SHALL HAVE A MINIMUM OF 6 WIRES WITH 12" STAY SPACING. MIN. 10 GA. WIRE 2. FILTER FABRIC SHALL BE A MINIMUM OF 36" IN WIDTH AND STEEL POSTS STAY WIRES SHALL BE FASTENED ADEQUATELY TO THE WIRE WITH 49 WIRE MIN. 12-1/2 GA STAPLES 1-112" LONG. FABRIC THAT DETERIORATES TO SUCH EXTENT THAT IT'S EFFECTIVENESS IS REDUCED SHALL BE LINE WIRES REPLACED BY CONTRACTOR AT CONTRACTOR'S EXPENSE. MIN. 12-1/2 GA. 3. STEEL POSTS SHALL BE A MIN. OF F HEIGHT AND SHALL BE THE SELF FASTENER ANGLE STEEL TYPE. 4. CONTRACTOR SHALL REVIEW SILT FENCE ONCE PER WEEK AND AFTER EACH RAINFALL OCCURRENCE. ANY NECESSARY i REPAIRS OR CLEAN-UP TO MAINTAIN THE EFFECTIVENESS OF THE DEVICE SHALL BE MADE IMMEDIATELY. 5. REMOVE DEPOSITED SEDIMENT ALONG THE FENCE TO PROVIDE ADEQUATE STORAGE VOLUME AND TO REDUCE PRESSURE ON THE FENCE AS NEEDED. STEP 1 STEP 2 U 5. TEMPORARY MEASURE SHALL NOT BE REMOVED BY THE CONTRACTOR UNTIL THIS ACTION IS APPROVED BY AN NCDENR ATTACH THE FILTER FABRIC TO THE WIRE FENCE, BACKFILL THE TRENCH AND COMPACT THE SOIL REPRESENTATIVE. THE ACTION WILL BE APPROVED WHEN THE EXTEND THE BOTTOM OF THE FABRIC 8" INTO THE FIRMLY TO ANCHOR THE BOTTOM OF THE SILT CONTRIBUTING DRAINAGE AREA IS STABLE. TRENCH AND TURNED OUT 4" IN THE TRENCH. FENCE. BURIED FABRIC SHALL NOT BE VISIBLE. POSTS MAX 8' O.C. FENCE "HOG WIRE" A -R FABRIC = QRE STAPLES 1-1/2" LONG ` ` TOM OF WIRE FENCE AND IF ER FABRIC BURIED 8" IN AVATED TRENCH & TURNED 4" IN THE TRENCH FLOW STEEL POST DRIVEN 24" INTO GROUND STEP 3 STEP 4 SECTION A -A MAINTENANCE 1. INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. 2. SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. 3. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE FENCE. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT. ■ 4. REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND STABILIZE AFTER NTS S THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED AND NCDENR APPROVES REMOVAL. SILT FENCE SEDIMENT STORAGE (1' MIN) **VEGETATED SHELF AND SLOPES ABOVE THE PERMANENT POOL ELEVATION SHALL HAVE A MINIMUM OF 6" TOPSOIL SUBGRADE SHALL BE ADJUSTED TO ACCOUNT FOR ADDITION OF TOPSOIL IN THESE AREAS SUCH THAT THE ELEVATIONS SHOWN ABOVE ARE TO THE FINISHED GRADE OF THE TOPSOIL. WET POND X-SECTION WITH EARTH BERM 7 DRIVE POSTS 24" INTO THE GROUND MAXIMUM 4' O.C. AND EXCAVATE A 4" X 8" TRENCH UPHILL ALONG THE LINE OF POSTS. STEP 1 ATTACH THE JUTE NETTING OR OTHER FABRIC APPROVED BY THE ENGINEER TO THE STAY WIRE AND POSTS, EXTEND THE BOTTOM OF THE FABRIC 8" INTO THE TRENCH AND TURNED OUT 4" IN THE TRENCH OR USE 8" EROSION CONTROL MATTING STAPLES. STEP 3 ATTACH WIRE FENCE TO POSTS AND EXTEND THE BOTTOM OF THE FENCE 8" INTO THE EXCAVATED TRENCH AND TURNED OUT 4" IN T- T-1- BACKFILL THE TRENCH AND COMPACT THE SOIL FIRMLY TO ANCHOR THE BOTTOM OF THE SILT FENCE. BURIED FABRIC SHALL NOT BE VISIBLE. THE TOP OF THE FABRIC SHALL BE 6" HIGHER THAN THE WEIR. STEP 4 BELOW WATER SURFACE NOTES: 1. GRADE THE BASIN SUCH THAT THE BOTTOM IS LEVEL 2. INSTALL THE BAFFLES AS SHOWN ON THE GRADING PLAN. BAFFLES SHALL EXTEND THE FULL WIDTH OF THE BASIN. 3. DO NOT SPLICE THE FABRIC, USE A CONTINUOUS PIECE ACCROSS THE BASIN OR TRAP. 4. POSTS FOR THE BAFFLES SHALL BE 4' OC. MAINTENANCE 1. INSPECT THE BAFFLES EACH ACTIVE DAY ON SITE BUT IN NO CASE LESS THAN ONCE PER WEEK AND AFTER EACH RAINFALL EVENT. MAKE ANY REPAIRS IMMEDIATELY. 2. REMOVE SEDIMENT DEPOSITS WHEN THE MEASURE REACHES HALF FULL. TAKE CARE TO AVOID DAMAGING THE BAFFLES WHEN THE SEDIMENT IS REMOVED. 3. TEMPORARY MEASURE SHALL NOT BE REMOVED BY THE CONTRACTOR UNTIL THIS ACTION IS APPROVED BY AN NCDENR REPRESENTATIVE. THE ACTION WILL BE APPROVED WHEN THE CONTRIBUTING DRAINAGE AREA IS STABLE. 4. PLACEMENT OF BAFFLES: INLET ZONE-35% OF LENGTH FROM ENTRY POINT FIRST CELL - 25 % OF LENGTH FROM INLET ZONE SECOND CELL - 25 % OF LENGTH FROM FIRST CELL OUTLET ZONE - 15 % OF LENGTH FROM SECOND CELL POSTS MAX 4' O.C. TOP STAY WIRE OR ROPE JUTE NETTING OR EQUIVILENT xQ BOTTOM OF FABRIC BURIED 8" g IN EXCAVATED TRENCH & = TURNED OUT 4" IN THE 0TRENCH, OR PINNED WITH 8" w EROSION CONTROL MATTING x STAPLES. FLOW STEEL POST DRIVEN 24" INTO GROUND SECTION A -A 411k .4116k.�� 0 _ EDGE OF NORMAL PLd OOL > N `l 1. UNLESS OTHERWISE INDICATED, ALL VEGETATIVE AND STRUCTURAL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE CONSTRUCTED AND MAINTAINED IN ACCORDANCE WITH THE MINIMUM STANDARDS AND SPECIFICATIONS OF THE NORTH CAROLINA EROSION AND SEDIMENT CONTROL HANDBOOK. 2. THE CONTRACTOR SHALL NOTIFY PLAN APPROVING AUTHORITY ONE WEEK PRIOR TO THE PRECONSTRUCTION CONFERENCE, ONE WEEK PRIOR TO THE COMMENCEMENT OF LAND DISTURBING ACTIVITY, AND ONE WEEK PRIOR TO FINAL INSPECTION. 3. IF POSSIBLE ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO CLEARING AND/OR LAND DISTURBANCE 4. A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN AND PERMIT SHALL BE MAINTAINED ON THE SITE AT ALL TIMES. 5. PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS (INCLUDING, BUT NOT LIMITED TO OFF -SITE BORROW OR WASTE AREAS STAGING OR STORAGE AREAS), THE CONTRACTOR SHALL PREPARE AND SUBMIT A SUPPLEMENTARY EROSION CONTROL PLAN TO THE OWNER FOR REVIEW AND TO NCDENR REGIONAL OFFICE FOR APPROVAL. CONTRACTOR SHALL PAY ALL FEES REQUIRED AND SHALL INSTALL NECESSARY MEASURES AT NO SEPARATE PAYMENT. THE CONTRACTOR SHALL PROVIDE THE OWNER AND THE ENGINEER A COPY OF THE AMENDED PERMIT. 6. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY ADDITIONAL EROSION CONTROL MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS DETERMINED BY EITHER NCDENR OR THE ENGINEER. 7. ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES DURING LAND DISTURBING ACTIVITIES AND DURING SITE DEVELOPMENT UNTIL FINAL STABILIZATION IS ACHIEVED. 8. ALL AREAS DISTURBED BY CONSTRUCTION UNLESS OTHERWISE IMPROVED SHALL BE SODDED OR SEEDED AS INDICATED AND STABILIZED. 9. DURING DEWATERING OPERATIONS, WATER SHALL BE PUMPED INTO AN APPROVED FILTERING DEVICE PRIOR TO DISCHARGE TO RECEIVING OUTLET. 10. THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES WEEKLY AND AFTER EACH RUNOFF -PRODUCING EVENT ANY NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES SHALL BE MADE IMMEDIATELY. 11. ALL TEMPORARY EROSION CONTROL MEASURES SHALL BE REMOVED BY CONTRACTOR ONCE STABILIZATION OR A SUFFICIENT GROUND COVER HAS BEEN ESTABLISHED OR AS DIRECTED BY THE ENGINEER. NCDENR'S FINAL APPROVAL IS REQUIRED. 12. TEMPORARY GRAVEL CONSTRUCTION ENTRANCE SHALL BE REQUIRED AT ALL CONSTRUCTION STAGING AREA ENTRANCES AND ALL CONSTRUCTION ACCESS LOCATIONS INTO NON -PAVED AREA. 13. WHEN CROSSING CREEK OR DRAINAGE -WAY, THE CONTRACTOR SHALL RIP -RAP WITH FABRIC DISTURBED BANKS AND CHANNEL AND RESTORE SLOPES TO ORIGINAL CONTOURS, BUT NOT STEEPER THAN 2:1 MAXIMUM. DISTURBED CREEK AREA SHALL BE STABILIZED IMMEDIATELY. 3 GENERAL EROSION AND SEDIMENT CONTROL NOTES DESIGN CRITERIA AGGREGATE SIZE - USE 2-3 INCH WASHED STONE DIMENSION OF GRAVEL PAD GRAVEL ENTRANCE SHALL BE 50 FEET THICKNESS - 6 INCHES MINIMUM IN LENGTH AND 12 FEET IN WIDTH WITH 20 FOOT RADIUS AT EXISTING WIDTH - 12 FT. MINIMUM OR FULL WIDTH AT ACCESS ROADWAY POINTS OF THE VEHICULAR ENTRANCE AND EXIT 36'-0" MIN 4'-0" 10'-0" AREA, WHICHEVER IS GREATER 6 LENGTH - 50 FT. MINIMUM. LOCATION - LOCATE CONSTRUCTION ENTRANCES AND EXITS TO LIMIT SEDIMENT FROM LEAVING THE SITE AND TO PROVIDE FOR MAXIMUM UTILITY BY ALL FILTER FABRIC 2-3" WASHED STONE CONSTRUCTION VEHICLES. AVOID STEEP GRADES AND ENTRANCES AT CURVES IN PUBLIC ROADS. CONTRACTOR SHALL INSTALL ADDITIONAL GRAVEL GRAVEL CONSTRUCTION ENTRANCE CONSTRUCTION ENTRANCES NOT INDICATED ON THE PLANS REQUIRED FOR STAGING AND/OR BORROW AREAS AND MAINTAIN AT NO ADDITIONAL EXPENSE TO THE OWNER. CONTRACTOR SHALL SUPPLEMENT AND MAINTAIN GRAVEL CONSTRUCTION ENTRANCES AT HIS EXPENSE UNTIL FINAL ACCEPTANCE. Zol z p�\G MAINTENANCE QJ MAINTAIN THE GRAVEL PAD INBA CONDITION TO PREVENT MUD OR SEDIMENT FROM LEAVING THE CONSTRUCTION SITE. THIS MAY so, REQUIRE PERIODIC TOPDRESSING WITH 2-INCH STONE. AFTER EACH O RAINFALL, INSPECT ANY STRUCTURE USED TO TRAP SEDIMENT AND / CLEAN IT OUT AS NECESSARY. IMMEDIATELY REMOVE ALL OBJECTIONABLE MATERIALS SPILLED, WASHED OR TRACKED ONTO PUBLIC ROADWAYS. O AGGREGATE �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�� SKIMMER (SIZE INFLOW _ STRUCTURE 14' 4' COIR FIBER BAFFLES ' O WOOD STAKE (PRACTICE STANDARD 6.65) _� OR METAL POST �p TRASH RAC SKIMMER :,[;jib �C ) RISER STRUCTURE CONSTRUCTION SPECIFICATIONS CLASS B STONE PAD--/ (4'X4'Xl' MIN.) 1. CLEAR, GRUB & STRIP TOPSOIL FROM AREAS UNDER THE EMBANKMENT TO REMOVE TREES, VEGETATION, ROOTS AND OTHER OBJECTIONABLE MATERIAL. DELAY CLEARING THE POOL AREA UNTIL THE DAM IS COMPLETE AND THEN REMOVE BRUSH, TREES, AND OTHER OBJECTIONABLE MATERIALS TO FACILITATE SEDIMENT CLEANOUT. STOCKPILE ALL TOPSOIL OR SOIL CONTAINING ORGANIC MATTER FOR USE ON THE OUTER SHELL OF THE EMBANKMENT TO FACILITATE VEGETATIVE ESTABLISHMENT. PLACE TEMPORARY SEDIMENT CONTROLS BELOW THE BASIN AS NEEDED. 2. EXCAVATE CUT-OFF TRENCH ALONG THE CENTER LINE OF THE EARTH FILL EMBANKMENT. CUT THE TRENCH TO STABLE SOIL MATERIAL, BUT IN NO CASE MAKE IT LESS THAN 2 FEET DEEP. THE CUT-OFF TRENCH MUST EXTEND INTO BOTH ABUTMENTS TO AT LEAST THE ELEVATION OF THE RISER CREST. MAKE THE MINIMUM BOTTOM WIDTH WIDE ENOUGH TO PERMIT OPERATION OF EXCAVATION AND COMPACTION EQUIPMENT, BUT IN NO CASE LESS THAN 2 FEET. MAKE SIDE SLOPES OF THE TRENCH NO STEEPER THAN 1:1. COMPACTION REQUIREMENTS ARE THE SAME AS THOSE FOR THE EMBANKMENT. KEEP THE TRENCH DRY DURING BACKFILLING AND COMPACTION OPERATIONS. 3. EMBANKMENT - TAKE FILL MATERIAL FROM THE APPROVED AREAS SHOWN ON THE PLANS. IT SHOULD BE CLEAN MINERAL SOIL, FREE OF ROOTS, WOODY VEGETATION, ROCKS, AND OTHER OBJECTIONABLE MATERIAL. SCARIFY AREAS ON WHICH FILL IS TO BE PLACED BEFORE PLACING FILL. THE FILL MATERIAL MUST CONTAIN SUFFICIENT MOISTURE SO IT CAN BE FORMED BY HAND INTO A BALL WITHOUT CRUMBLING. IF WATER CAN BE SQUEEZED OUT OF THE BALL, IT IS TOO WET FOR PROPER COMPACTION. PLACE FILL MATERIAL IN 6 TO 8 INCH CONTINUOUS LAYERS OVER THE ENTIRE LENGTH OF THE FILL AREA AND COMPACT IT. COMPACTION MAY BE OBTAINED BY ROUTING THE CONSTRUCTION HAULING EQUIPMENT OVER THE FILL SO THAT THE ENTIRE SURFACE OF EACH LAYER IS TRAVERSED BY AT LEAST ONE WHEEL OR TREAD TRACK OF HEAVY EQUIPMENT, OR A COMPACTOR MAY BE USED. CONSTRUCT THE EMBANKMENT TO AN ELEVATION 10 % HIGHER THAN THE DESIGN HEIGHT TO ALLOW FOR SETTLING. 4. SECURELY ATTACH THE RISER TO THE BARREL OR BARREL STUB TO MAKE A WATERTIGHT STRUCTURAL CONNECTION. SECURE ALL CONNECTIONS BETWEEN BARREL SECTIONS BY APPROVED WATERTIGHT ASSEMBLIES. PLACE THE BARREL AND RISER ON A FIRM, SMOOTH FOUNDATION OF IMPERVIOUS SOIL. DO NOT USE PERVIOUS MATERIAL SUCH AS SAND, GRAVEL, OR CRUSHED STONE AS BACKFILL AROUND THE PIPE OR ANTISEEP COLLARS. PLACE THE FILL MATERIAL AROUND THE PIPE SPILLWAY IN 4INCH LAYERS, AND COMPACT IT UNDER AND AROUND THE PIPE TO AT LEAST THE SAME DENSITY AS THE ADJACENT EMBANKMENT. CARE MUST BE TAKEN NOT TO RAISE THE PIPE FROM FIRM CONTACT WITH ITS FOUNDATION WHEN COMPACTING UNDER THE PIPE HAUNCHES. PLACE A MINIMUM DEPTH OF 2 FEET OF COMPACTED BACKFILL OVER THE PIPE SPILLWAY BEFORE CROSSING IT WITH CONSTRUCTION EQUIPMENT. ANCHOR THE RISER IN PLACE BY CONCRETE OR OTHER SATISFACTORY MEANS TO PREVENT FLOTATION. IN NO CASE SHOULD THE PIPE CONDUIT BE INSTALLED BY CUTTING A TRENCH THROUGH THE DAM AFTER THE EMBANKMENT IS COMPLETE. 5. INSTALL THE EMERGENCY SPILLWAY IN UNDISTURBED SOIL. THE ACHIEVEMENT OF PLANNED ELEVATIONS, GRADE, DESIGN WIDTH, AND ENTRANCE AND EXIT CHANNEL SLOPES ARE CRITICAL TO THE SUCCESSFUL OPERATION OF THE EMERGENCY SPILLWAY. 6. DISCHARGE THE WATER INTO THE BASIN IN A MANNER TO PREVENT EROSION. USE DIVERSIONS WITH OUTLET PROTECTION TO DIVERT SEDIMENT -LADEN WATER TO THE UPPER END OF THE POOL AREA TO IMPROVE TRAP EFFICIENCY. 7. CONSTRUCT THE STRUCTURE SO THAT THE DISTURBED AREA IS MINIMIZED. DIVERT SURFACE WATER AWAY FROM BARE AREAS. COMPLETE THE EMBANKMENT BEFORE THE AREA IS CLEARED. 8. INSTALL POROUS BAFFLES AS SPECIFIED. 9. AVOID STEEP SIDE SLOPES, AND FENCE AND MARK BASINS WITH WARNING SIGNS IF TRESPASSING IS LIKELY. FOLLOW ALL STATE AND LOCAL REQUIREMENTS. EMBANKMENT STONE ENERGY DISSIPATOR EMERGENCY SPILLWAY TOP OF EMBANKMENT FREEBOARD 1 MIN. 2 EMERGENCY SPILLWAY BARREL n k PIPE SEEP � STABILIZED CUT-OFF TRENCH ANTI -SEEP BLOCK 2' DEEP 1.1 COLLAR OUTLET CROSS-SECTION VIEW NOTES 1. SEED AND PLACE MATITNG FOR EROSION CONTROL ON INTERIOR AND EXTERIOR SIDESLOPES. 2. INSTALL A MINIMUM OF 3 COIR FIBER BAFFLES IN ACCORDANCE WITH PRACTICE STANDARD 6.65. 3. INSTALL SKIMMER AND COUPLING TO RISER STRUCTURE OR DIRECTLY INTO EMBANKMENT 1 FT. FROM BOTTOM OF BASIN. 4. THE ARM PIPE SHALL HAVE A MINIMUM LENGTH OF 6 FT. BETWEEN THE SKIMMER AND COUPLING. I SCH 40 PVC **SKIMMER CAN BE PURCHASED FROM J.W. FAIRCLOTH & SON INC. PIPE SKIMMER CHOSEN SHALL BE EQUAL TO THE FAIRCLOTH SKIMMER. SKIMMER MAINTENANCE INSPECT TEMPORARY SEDIMENT BASINS WEEKLY AND AFTER EACH PERIOD OF SIGNIFICANT RAINFALL. REMOVE SEDIMENT AND RESTORE TRAP TO ITS ORIGINAL DIMENSIONS WHEN THE SEDIMENT HAS ACCUMULATED TO ONE-HALF THE DESIGN DEPTH OF THE TRAP. PLACE THE SEDIMENT THAT IS REMOVED IN AN AREA WITH SEDIMENT CONTROLS. CHECK THE EMBANKMENT, SPILLWAYS, AND OUTLET FOR EROSION DAMAGE AND INSPECT THE EMBANKMENT FOR PIPING AND SETTLEMENT. MAKE ALL NECESSARY REPAIRS IMMEDIATELY. REMOVE ALL TRASH AND OTHER DEBRIS FROM THE RISER AND POOL AREA. 5 TEMPORARY SEDIMENT BASIN 0 11 MAINTENANCE PIPE OUTLET TO 1. INSPECT THE OUTLET PROTECTION WELL-DEFINED CHANNEL AFTER EACH RAINFALL BUT IN NO CASE LESS THAN ONCE PER WEEK. A o A ANY STONES THAT THAT HAVE BEEN - - DISLODGED SHOULD BE REPLACED V AND ANY EROSION AROUND THE OUTLET SHOULD BE REPAIRED. of PLAN GRAVEL OR FABRIC L IT J 3111111 L- _ J ° --1- lll 1L FILTER LAYER I -III -III I I -III- GRAVEL OR FABRIC -III-III=1 SECTION A -A NOTES 1. LA IS THE LENGTH OF THE RIPRAP 3. IN A WELL-DEFINED CHANNEL EXTEND APRON.(SEE EC PLAN) THE APRON THE REQUIRED 4' WIDTH OR UP TO THE TOP OF THE CHANNEL 2. D = 1.5 TIMES THE MAXIMUM BANKS, WHICHEVER IS LESS. STONE DIAMETER BUT NOT LESS THAN 6". 4. A FILTER FABRIC OR BLANKET SHOULD BE INSTALLED BETWEEN THE RIPRAP AND SOIL FOUNDATION. TYPICAL RIP RAP APRON NTS NTS 4Dsite solutions civil engineering I Land surveying 409 Chicago Drive, Suite 112, Fayetteville, NC 28306 office 1 910-426-6777 fax 1910-426-S777 license number I C-2354 www.4Dsitesotutions.com SEA 02 '•• G I IJE••' In11%, REVISIONS PROJECT NAME EDGERTON INDUSTRIAL PARK STORM POND DETAILS CLIENT HARNETT COUNTY ECONOMIC DEVELOPMENT 200 Alexander Drive Lillington, North Carolina 27546 Phone: (910) 814-6893 Fax: (910)814-8298 PROJECT INFORMATION DESIGNED BY: SCOTT DRAWN BY: SCOTT CHECKED BY: CHRIS PROJECT NUMBER: 1479 DRAWING SCALE NOT TO SCALE DATE RELEASED AUGUST 2, 2019 SHEET NUMBER C-500 PVC VENT PIPE_ SCH 40 PVC **SKIMMER CAN BE PURCHASED FROM J.W, FAIRCLOTH & SON INC. PIPE SKIMMER CHOSEN SHALL BE EQUAL TO THE FAIRCLOTH SKIMMER. MAINTENANCE INSPECT SKIMMER SEDIMENT BASINS AT LEAST WEEKLY AN AFTER EACH SIGNIFICANT (0.5 INCH OR GREATER) RAINFALL EVENT AND REPAIR IMMEDIATELY. REMOVE SEDIMENT AND RESTORE BASIN TO ITS ORIGINAL DIMENSIONS WHEN SEDIMENT ACCUMULATES TO 1/2 HEIGHT OF THE 1ST BAFFLE. PULL THE SKIMMER TO ONE SIDE SUCH THAT THE SEDIMENT UNDERNEATH IT CAN BE EXCAVATED. EXCAVATE THE SEDIMENT FROM THE ENTIRE BASIN. MAKE SURE THE VEGETATION GROWING IN THE BOTTOM OF THE BASIN DOES NOT HOLD DOWN THE SKIMMER. REPAIR THE BAFFLES IF THEY ARE DAMAGED. RE —ANCHOR THE BAFFLES IF WATER IS FLOWING UNDERNEATH OR AROUND THEM. IF THE SKIMMER IS CLOGGED WITH TRASH AND THERE IS WATER IN THE BASIN, USUALLY JERKING THE ROPE WILL MAKE THE SKIMMER BOB UP AND DOWN AND DISLODGE THE DEBRIS AND RESTORE FLOW. IF THIS DOES NOT WORK, PULL THE SKIMMER OVER TO THE SIDE OF THE BASIN AND REMOVED THE DEBRIS. CHECK THE ORIFICE INSIDE THE SKIMMER TO SEE IF IT IS CLOGGED; IF SO, REMOVE THE DEBRIS. IF THE SKIMMER ARM OR BARREL PIPE IS CLOGGED, THE ORIFICE CAN BE REMOVED AND THE OBSTRUCTION CLEARED WITH A PLUMBER'S SNAKE OR BY FLUSHING WITH WATER. BE SURE AND REPLACE THE ORIFICE BEFORE REPOSITIONING THE SKIMMER. CHECK THE FABRIC LINED SPILLWAY FOR DAMAGE AND MAKE ANY REQUIRED REPAIRS WITH FABRIC THAT SPANS THE FULL WIDTH OF THE SPILLWAY. CHECK EMBANKMENT, SPILLWAYS, AND OUTLET FOR EROSION DAMAGE AND INSPECT THE EMBANKMENT FOR PIPING AND SETTLEMENT. MAKE ALL NECESSARY REPAIRS. NTS PLAN VIEW O 12„ 1 ANTI —SEEP COLLAR I I TRENCH WIDTH GRADE ANTI—SEEI CLASS B CONCRETE. SECTION A —A NTS GROUND STABILIZATION CHART SITE AREA STABILIZATION STABILIZATION TIME DESCRIPTION TIME FRAME FRAME EXCEPTIONS PERIMETER DIKES, SWALES, DITHCES 7 DAYS NONE AND SLOPES HIGH QUALITY WATER (HQW) 7 DAYS NONE ZONES IF SLOPES ARE 10' OR SLOPES STEEPER 7 DAYS LESS IN LENGTH AND ARE THAN 3:1 NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED SLOPES 3:1 OR 7—DAYS FOR SLOPES FLATTER 14 DAYS GREATER THAN 50 FEET IN LENGTH NONE ALL OTHER AREAS (EXCEPT FOR WITH SLOPES FLATTER 14 DAYS PERIMETERS AND THAN 4:1 HQW ZONES) NTS TOP OF POND SEE PLAN FOR RIP RAP THICKNESS CLASS B SEE PLANSFORE� THICKNESS /�� \�����\ / � WSEE PLAN FOR THE HICH O THE SPILLWAY THE ELEVATION FILTER FABRIC WHERE THE FABRIC SEE PLAN FOR MEETS THE STONE SPILLWAY WIDTH SPILLWAY CROSS SECTION 1. INSTALL THE EMERGENCY SPILLWAY IN UNDISTURBED SOIL. THE ACHIEVEMENT OF PLANNED ELEVATIONS, GRADE, DESIGN WIDTH, AND ENTRANCE AND EXIT CHANNEL SLOPES ARE CRITICAL TO THE SUCCESSFUL OPERATION OF THE EMERGENCY SPILLWAY. 2. ALTERNATIVE MATERIALS MAY BE USED OTHER THAN THE SPECIFIED STONE IF APPROVED BY THE DESIGN ENGINEER. 3. MAX SIDE SLOPES ARE 3:1 1 FAIRCLOTH SKIMMER I 1 2 ANTI -SEEP COLLAR 1 1 3 GROUND STABILIZATION CHART 1 1 4 EMERGENCY SPILLWAY 5 FLARED END SECTION DIMENSIONS PIPE DIA. ID WALL OD L A B C E F G H J K M 15" 15" 2 1/4" 19 1/2. 74 3/4- 7" 27 1/4" 47 1/2" 30' 17 5/8" 16 3/4" 17" 16 1/2" 2- 2' 18" 18" 2 1/2" 23" 74 3/4- 9" 27" 47 3/4" 36' 20 7/8" 20 1/4" 20 1/4" 19 1/2" 2- 2' 24" 24" 3' 30" 80" 9" 43" 37" 47 3/4" 27 1/2" 27 1/8" 26 3/4" 26 1/4" 2 13/16" 2 3/4" 36" 36" 4' 44" 97 1/2" 16" 60" 37 1/2" 71" 40 7/8" 40" 39 3/4" 39" 3 3/4" 3 3/4" 48' 48" 5' 58- 99 1/4- 25 1/2" 70 1/4" 29- 83 1/2" 53 3/4" 52 3/4" 52 1/2" 51 3/4" 4 1/4- 4 1/4" OD F G Ka- TOP VIEW �M B OD H J ID �A C �1 WALL L IE — E NOTES: 1. ALL CONCRETE TO BE 4000 PSI. 2. REINFORCEMENT STEEL MEETS ASTM 615 GRADE 60 . 3. ALL EXPOSED EDGES CHAMFERED 3/4" 4. PIPE TO BE GROUTED INTO FLARED END SECTION JOB SITE BY CONTRACTOR. 5. PRECAST FES STRUCTURES SHOULD BE POSITIONED AROUND AN EXISTING PIPE OR PIPE INSERTED INTO FES. FLARED END SECTIONS SHOULD BE PLACED ON A PREPARED FOUNDATION AS SPECIFIED BY THE ENGINEER. 6. COMPACTION OF BACKFILL MATERIALS SHALL BE AS REQUIRED BY THE ENGINEER. SECTION VIEW OUTLET VIEW FLARED END SECTION NTS LIFTING LUG 3/4"x3/4" ALUK *** THE MAXIMUM SPACING BETWEEN BARS SHALL NOT EXCEED 5.5 INCHES. TRASH RACK NTS SECTION A —A RASH RACK RISER PVC SCREW WIER TYPE PLUG 4" PVC STUBBED INTO BOX PVC TEE TEMPORARY POOL PERMANENT POOL WkL" 0C PVC CAP WITH (SEE CHART)" DRILLED HOLE TYPICAL ORIFICE OUTLET CONFIGURATION NOTES 1. OUTSIDE RISER DIMENSIONS: L=4', W=3' STRUCTURE A (FT) I B (FT) I C IN D FT HOLES 1 E FT F FT INSIDE RISER DIMENSIONS: L=3', W=2' RI-1 1 150.00 1 146.00 1 3.0 1 146.00 1 1 1 148.20 1 2.0 7 STORM BASIN RISER WITH ORIFICE DETAIL NTS NTS NATURAL GROUND MAX. SLOPE (TYP) IN. 2.5 2.5 NATURAL GROUND z 2.5 / 3 1F— Ill,ti o o / COMPACTED SOIL *** WHEN A GRAVEL DIVERSION BERM IS REQUIRED, THE HEIGHT SHALL BE REDUCED TO 12 INCHES AND THE TOP WIDTH TO 6", ALL OTHER REQUIREMENTS SHALL REMAIN THE SAME. TEMPORARY DIVERSION KEY NOTES: 1. CLEAR THE ARE UNDER THE BERM AND STRIP THE ROOTS/OTHER ORGANICS. 2. COMPACT THE SIDE SLOPES, PREFERABLY WITH A TRACKED VEHICLE TO SLOW RUNOFF VELOCITIES. 3. VEGITATE THE RIDGE OF THE BERM IMMEDIATELY AFTER CONSTRUCTION UNLESS THE BERM WILL REMAIN IN PLACE FOR LESS THAN 30 DAYS. INSPECT TEMPORARY DIVERSIONS ONCE A WEEK AND AFTER EVERY RAINFALL. IMMEDIATELY REMOVE SEDIMENT FROM THE FLOW AREA AND REPAIR THE DIVERSION RIDGE. CAREFULLY CHECK OUTLETS AND MAKE TIMELY REPAIRS AS NEEDED. 8 TEMPORARY DIVERSION BERM NTS 4Dsite solutions civil engineering I land surveying 409 Chicago Drive, Suite 112, Fayetteville, NC 28306 office 1910-426-6777 fax 1910-426-5777 license number I C-2354 www.4Dsitesotutions.com \IICARO,��''' 2: Qk SS O .•- i SEA02 G I NE .•:��� ••.....•• REVISIONS PROJECT NAME EDGERTON INDUSTRIAL PARK STORM POND DETAILS CLIENT HARNETT COUNTY ECONOMIC DEVELOPMENT 200 Alexander Drive Lillington, North Carolina 27546 Phone: (910) 814-6893 Fax: (910)814-8298 PROJECT INFORMATION DESIGNED BY: SCOTT DRAWN BY: SCOTT CHECKED BY: CHRIS PROJECT NUMBER: 1479 DRAWING SCALE NOT TO SCALE DATE RELEASED AUGUST 2, 2019 SHEET NUMBER C-501