HomeMy WebLinkAbout20160825 Ver 1_August 2019 Inspection_20190903Wetland Inspection Report
Project Num: 20160825 Version
Project Name: NCDOT - US 64/NC 90 Improvements (R-5745)
County: Caldwell
Location: NCDOT - US 64/NC 90 Improvements (R-5745)
Latitude: +35' 55' 27"
SW Plan Location
Site Owner Name NC DOT Division 11
Inspection Date: 8/28/2019
Reason for Inspection Routine
Inspection Type: Site Inspection (DOT)
1 Status: Issued
Project Type: Road
maintenance/repair/improvemen
Region: Asheville
Longitude: -81 ° 30' 15"
Inspection Contact Person: Title: Phone:
On -Site Representative(s):
Primary Inspector: Dave Wanucha Phone: 336-776-9703
Secondary Inspector(s):
Facility Compliance Status: 0 Compliant ❑ Not Compliant
Program Areas: 401 (includes isolated/non-404)
Question Areas:
Permit (401 WQC)
Inspection Summary:
page: 1
Site Number: 20160825 Owner: Pettyjohn, Michael A.
Inspection Date: 8/28/2019 Inspection Type: Site Inspection (DOT) Reason for Visit: Routine
Permit (401 WQC) Yes No NA NE
Does the impact(s) match what was approved in the 401 WQC or non 404 permit? 0
❑
❑
❑
Are the culverts and/or filled areas installed properly? 0
❑
❑
❑
Is the site compliant with additional conditions of the 401 WQC or non 404 permit? 0
❑
❑
❑
Comment: I reviewed the project with DEO Kevin Hining and DOT project manager Aaron Johnson. The culvert was
underconstruction. The upstream section was mostly complete. US 64 will be moved to completed
section of the culvert and then work will begin on the downstream section. Construction BMPs were in
place as well as erosion control measures. Relocated channel appeared to be stable. Project is
progressing and should be complete by end of the year.
page: 2