Loading...
HomeMy WebLinkAbout20160825 Ver 1_August 2019 Inspection_20190903Wetland Inspection Report Project Num: 20160825 Version Project Name: NCDOT - US 64/NC 90 Improvements (R-5745) County: Caldwell Location: NCDOT - US 64/NC 90 Improvements (R-5745) Latitude: +35' 55' 27" SW Plan Location Site Owner Name NC DOT Division 11 Inspection Date: 8/28/2019 Reason for Inspection Routine Inspection Type: Site Inspection (DOT) 1 Status: Issued Project Type: Road maintenance/repair/improvemen Region: Asheville Longitude: -81 ° 30' 15" Inspection Contact Person: Title: Phone: On -Site Representative(s): Primary Inspector: Dave Wanucha Phone: 336-776-9703 Secondary Inspector(s): Facility Compliance Status: 0 Compliant ❑ Not Compliant Program Areas: 401 (includes isolated/non-404) Question Areas: Permit (401 WQC) Inspection Summary: page: 1 Site Number: 20160825 Owner: Pettyjohn, Michael A. Inspection Date: 8/28/2019 Inspection Type: Site Inspection (DOT) Reason for Visit: Routine Permit (401 WQC) Yes No NA NE Does the impact(s) match what was approved in the 401 WQC or non 404 permit? 0 ❑ ❑ ❑ Are the culverts and/or filled areas installed properly? 0 ❑ ❑ ❑ Is the site compliant with additional conditions of the 401 WQC or non 404 permit? 0 ❑ ❑ ❑ Comment: I reviewed the project with DEO Kevin Hining and DOT project manager Aaron Johnson. The culvert was underconstruction. The upstream section was mostly complete. US 64 will be moved to completed section of the culvert and then work will begin on the downstream section. Construction BMPs were in place as well as erosion control measures. Relocated channel appeared to be stable. Project is progressing and should be complete by end of the year. page: 2