SUBJECT: Compliance Evaluation Inspection
Wayne Farms WWTP SEP 0 3 2019 -
NPDES Permit No. NC0006548
Surry County •
Water Quality
Permitting Section
Dear Mr. Nordin, -
On August 14, 2019, Gary Hudson of this office met with Jeremy Bowlin, operator in responsible
charge (ORC), to perform a Compliance Evaluation Inspection on the Wayne Farms wastewater
treatment system. This type of inspection consists of two basic parts: an in-office file review and
an on-site inspection of the treatment facility. The attached Environmental Protection Agency
inspection form notes the areas that were evaluated for this inspection. The findings and
observations are outlined below:
I. Permit
The NPDES permit became effective February 1, 2014 and expired on December 31, 2018. A
permit renewal application was submitted in April 2018.
II. Self-Monitoring Program
A review of the monthly discharge monitoring reports (DMR) for the period June 2018 through
May 2019 showed that the facility was in compliance with all permit limits.
Ill. Records/Reports ,
The permit and visitation log were available during the inspection and show visitation times and
plant conditions.The pH calibration log was also available during inspection and was satisfactory.
Chain of custody forms are in good order. All required monitoring was performed per the
frequencies specified in the'NPDES permit. Meritech Environmental Laboratories maintains the
documentation, but Mr. Bowlin also has them available on his computer at the plant.
IV. Flow Measurement _
The instantaneous flow is measured by a 24-inch rectangular weir and an ISCO 4210 ultrasonic
flow meter. The meter was calibrated on April 27, 2019 by Cooper Instrumentation.
DEQ North Carolina Department of Environmental Quality I Division of Water Resources
�) Winston-Salem Regional Office 1450 Hanes Mill Road,Suite 300 I Winston-Salem,North Carolina 27105
NOR1N CAROLINA
o meA mo r� ew° 336.776.9800
tir
V. Operations and Maintenance
The ORC and backup ORC are sufficiently qualified to be running the plant.
VI. Facility Site Review
All components of the 0.70 million gallons per day facility appeared to be functioning properly.
The aeration basin had a light brown color and a good earthy odor. All blowers were functioning
properly and there were no dead spots. The dissolved oxygen is maintained around 3 milligrams
per liter. The secondary clarifier was discharging clear effluent. Effluent is disinfected using
sodium hypochiorite, and then dechlorinated using sodium bisulfate before the effluent leaves the
plant. There is a clear path to where the effluent pipe discharges into the receiving stream.
VII. Effluent/Receiving Waters
The effluent from the facility was clear the day of inspection. Effluent was being discharged into
the Fisher River, class C, waters in the Yadkin/Pee Dee River Basin.
VIII. Sludge Maintenance and Handling
Sludge from the two 0.5 MG anaerobic lagoons is currently land applied under non-discharge
permit#WQ0004609.
If you have any questions regarding the inspection or this report, please contact Gary Hudson or
me at (336) 776-9800.
Sincerely,
CDocuSlgned by:
e n,. 4. .1. 11.4/n,Q.k
OD 3QE F1B7458.. l
for Lon Snider
Regional Supervisor
Water Quality Regional Operations
Division of Water Resources
cc: Central Files
WSRO
/ NPDES-Unit
• United States Environmental Protection Agency Form Approved
EPA Washington,D C 20460 OMB No.2040-0057
Water Compliance Inspection Report Approval expires 8-31-98
Section A.National Data System Coding(t e.,PCS)
Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type
1 I I 2 IL I 3 1 NC0006548 111 12 1 19/08/14 117 18 1,•1 19 I G I 201 1 ,
211II111 I I I III 1 11 11 1 11 1111 I 1 11 111 11I 1111 11 11 P6.
Inspection Work Days Facility Self-Monitoring Evaluation Rating B1 QA Reserved
67I I 70I I 71 iI I 72 I ti I 731
1 174
75I1 1 1 I I I 1 1
80
l Section B Facility Data
L�
Name and Location of Facility Inspected(For Industrial Users discharging to POTW,also include . Entry Time/Date Permit Effective Date
POTW name and NPDES permit Number) 01 OOPM 19/08/14 14/02/01
Dobson Plant
802 E Atkins St Exit Time/Date Permit Expiration Date
02 OOPM 19/08/14 18/12/31
Dobson NC 27017
Name(s)of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s) Other Facility Data
///
Jeremy Elden Bowlin/ORC/336-386-5667/
Name,Address of Responsible Official/Title/Phone and Fax Number
Contacted
Paul Nordin,802 E Atkins St Dobson NC 27 0 1 7//33 6-3 6 6-8 1 51/
No
Section C Areas Evaluated During Inspection(Check only those areas evaluated)
III Permit Flow Measurement II Operations&Maintenance III Records/Reports
El Self-Monitoring Program II Sludge Handling Disposal II Facility Site Review 1. Effluent/Receiving Waters
Section D Summary of Finding/Comments(Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s)and Signature(s)of Inspector(s) Agency/Office/Phone and Fax Numbers Date
Gary Hudson it NfidieLoyDivision of Water Quality//336-776-9694i
2M UGi9
Signature of Manag ment Q A Reviewer poocusigned by: Agency/Office/Phone and Fax Numbers Date
3eA,,, ?A, �-. ) 8/28/2019
EPA Form 3560-3(Rev 9-94)Previous editions are obsolete
Page# 1
y
NPDES yr/mo/day Inspection Type 1
31 NC0006548 Ill 121 19/08/14 117 18 i,.i
Section D:Summary of Finding/Comments(Attach additional sheets of narrative and checklists as necessary)
Page# 2
4
Permit: NC0006548 Owner-Facility: Dobson Plant
Inspection Date. 08/14/2019 Inspection Type: Compliance Evaluation
Permit Yes No NA NE
(If the present permit expires in 6 months or less). Has the permittee submitted a new • ❑ 0 ❑
application'?
Is the facility as described in the permit? • ❑ ❑ 0
#Are there any special conditions for the permit? 0 IN 0 ❑
Is access to the plant site restricted to the general public'? • ❑ 0 0
Is the inspector granted access to all areas for inspection'? • 0 0 0
Comment. -
Operations & Maintenance Yes No NA NE
Is the plant generally clean with acceptable housekeeping'? 11 0 0 ❑
Does the facility analyze process control parameters, for ex. MLSS, MCRT, Settleable • 0 0 0
Solids, pH, DO, Sludge Judge, and other that are applicable'?
Comment: -
Record Keeping Yes No NA NE
Are records kept and maintained as required by the permit? • 0 0 ❑
Is all required information readily available, complete and current'? • ❑ ❑ ❑
Are all records maintained for 3 years(lab reg. required 5 years)? • 0 0 ❑
Are analytical results consistent with data reported on DMRs? • 0 ❑ ❑
Is the chain-of-custody complete'? • 0 0 0
Dates,times and location of sampling •
Name of individual performing the sampling
Results of analysis and calibration •
Dates of analysis •
Name of person performing analyses IN
Transported COCs •
Are DMRs complete do they include all permit parameters'? • 0 ❑ 0
Has the facility submitted its annual compliance report to users and DWQ? ❑ 0 • 0
(If the facility is=or>5 MGD permitted flow) Do they operate 24/7 with a certified operator 0 0 • 0
on each shift?
Is the ORC visitation log available and current'? • ❑ ❑ 0
Is the ORC certified at grade equal to or higher than the facility classification'? • 0 0 0
Is the backup operator certified at one grade less or greater than the facility classification'? MI 0 0 0
Is a copy of the current NPDES permit available on site'? • 0 0 0
•
Page# 3
Permit: NC0006548 Owner-Facility: Dobson Plant
Inspection Date: 08/14/2019 Inspection Type: Compliance Evaluation
Record Keeping Yes No NA NE
Facility has copy of previous year's Annual Report on file for review'? ❑ ❑ • ❑
Comment:
Bar Screens Yes No NA NE
Type of bar screen
a.Manual ❑
b.Mechanical III
Are the bars adequately screening debris'? • ' ❑ ❑ ❑
Is the screen free of excessive debris'? MEIDEI
Is disposal of screening in compliance'? • ❑ ❑ ❑
Is the unit in good condition? • ❑ ❑ ❑
Comment: .
Grease Removal Yes No NA NE
#Is automatic grease removal present'? IIIEIDEI
Is grease removal operating properly? • 0 ❑ ❑
Comment.
Equalization Basins Yes No NA NE
Is the basin aerated'? U ❑ ❑ ❑
Is the basin free of bypass lines or structures to the natural environment'? • ODD
Is the basin free of excessive grease'? ROOD
Are all pumps present'? • ❑ ❑ ❑
Are all pumps operable? 111EIDEI
Are float controls operable'? • ❑ ❑ ❑
Are audible and visual alarms operable'? • ❑ ❑ ❑
#Is basin size/volume adequate'? • ❑ ❑ ❑
Comment _
Aeration Basins Yes No NA NE
Mode of operation Ext.Air
Type of aeration system Jet
Is the basin free of dead spots'? • ❑ ❑ ❑
Page# 4
Permit: NC0006548 Owner-Facility: Dobson Plant
Inspection Date: 08/14/2019 - Inspection Type: Compliance Evaluation
Aeration Basins Yes No NA NE
Are surface aerators and mixers operational'? • 0 0 0
Are the diffusers operational'? 0 0 II ❑
Is the foam the proper color for the treatment process'? • ❑ 0 ❑
Does the foam cover less than 25%of the basin's surface'? 0 ❑, 0
Is the DO level acceptable'? • 0 0 ❑
Is the DO level acceptable2(1.0 to 3 0 mg/I) • 0 0 0
Comment: -
Secondary Clarifier Yes No NA NE
Is the clarifier free of black and odorous wastewater'? • ❑ 0 ❑
Is the site free of excessive buildup of solids in center well of circular clarifier? II 0 0 ❑
Are weirs level'? • ❑ 0 ❑
Is the site free of weir blockage'? ❑ 0 ❑
Is the site free of evidence of short-circuiting'? • 0 ❑ ❑
Is scum removal adequate'? • 0 0 ❑
Is the site free of excessive floating sludge'? II 0 ❑ ❑
Is the drive unit operational'? • 0 ❑ 0
Is the return rate acceptable(low turbulence)? • 0 0 ❑
Is the overflow clear of excessive solids/pin floc? • 0 0 ❑
Is the sludge blanket level acceptable'?(Approximately'A of the sidewall depth) • ❑ 0 ❑
Comment:
Disinfection-Liquid Yes No NA NE
Is there adequate reserve supply of disinfectant'? • ❑ 0 ❑
(Sodium Hypochlonte) Is pump feed system operational'? • ❑ 0 ❑
Is bulk storage tank containment area adequate'?(free of leaks/open drains) • 0 0 ❑
Is the level of chlorine residual acceptable'? MI 0 0 0 _
Is the contact chamber free of growth, or sludge buildup? • ❑ 0 0
Is there chlorine residual prior to de-chlorination'? • ❑ 0 ❑
Comment:
De-chlorination Yes No NA NE
Type of system? Liquid
Page# 5
Permit: NC0006548 Owner-Facility: Dobson Plant
Inspection Date: 08/14/2019 Inspection Type: Compliance Evaluation
De-chlorination Yes No NA NE
Is the feed ratio proportional to chlorine amount(1 to 1)2 • El ❑ El
Is storage appropriate for cylinders? ❑ El 1M ❑
#Is de-chlorination substance stored away from chlorine containers? • ❑ 0 ❑
Comment:
Are the tablets the proper size and type'? El ❑ IN 0
Are tablet de-chlorinators operational'? ❑ ❑ 111 ❑
Number of tubes in use'?
Comment.
Effluent Pipe Yes No NA NE
Is right of way to the outfall properly maintained'? • ❑ ❑ ❑
Are the receiving water free of foam other than trace amounts and other debris'? • ❑ ❑ ❑
If effluent (diffuser pipes are required) are they operating properly'? El ❑ • ❑