Loading...
HomeMy WebLinkAbout20191164 Ver 1_Wetland Impact Summary Sheet_20190826_20190903WETLAND PERMIT IMPACT SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Site No. Station (From/To) Structure Size / Type Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) Permanent SW impacts (ac) Temp. SW impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp. (ft) Bank Stabilization (ft) SITE #1 N/A Stream Excavation 60.00 TOTALS*: 60 *Rounded totals are sum of actual impacts NOTES: