Loading...
HomeMy WebLinkAboutNCG070193_Inspection Report_20190903ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Director Appalachian Stone Company, Inc Attention: Daniel Ray Post Office Box 1598 Marion, North Carolina 28752 NORTH CAROLINA Environmental Quality September 3, 2019 Subject: Compliance Evaluation Inspection Permit: NCG070000 Certificate of Coverage: NCG070193 McDowell County, North Carolina Dear Mr. Ray: Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspection I conducted at the subject facility on August 29, 2019. The report should be self-explanatory; however, should you have any questions concerning this report, please do not hesitate to contact me at (828) 296-4500 or by email at Isaiah.reed@ncdenr.gov. Sin Isaiah Reed, C SWQ, CEPSCI, MS4CECI Environmental Specialist Land Quality Section Enclosure: Inspection Report D_EQ�� North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Asheville Regional Office 1 2090 U.S. Highway 70 1 Swannanoa, North Carolina 28778 °eo-;e 828.296.4500 Compliance Inspection Report Permit: NCG070193 SOC: County: McDowell Region: Asheville Contact Person: Daniel Ray Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Effective: 06/01/18 Expiration: 05/31/23 Owner: Appalachian Stone Company Inc Effective: Expiration: Facility: Appalachian Stone Company -Marion Mine 4582 Hwy 221 N Inspection Date: 08/29/2019 Primary Inspector: Isaiah L Reed Secondary Inspector(s): Title: Entry Time: 10:30AM Certification: Marion NO 28752 Phone: 828-286-2541 Phone: Exit Time: 11:30AM Phone: 828-296-4614 Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Stone, Clay, Glass, and Concrete Products Stormwater Discharge COO Facility Status: Compliant E Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NCG070193 Owner - Facility:Appalachian Stone Company Inc Inspection Date: 08/29/2019 Inspection Type : Compliance Evaluation Reason for Visit: Routine Inspection Summary: On August 29, 2019 this facility was inspected for compliance. I met with Joe Washburn on site. During the inspection, the following items were noted: 1) A Stormwater Pollution Prevention Plan (SWPPP) has not been implemented and maintained. A SWPPP was available at the time of the inspection, but it has not been updated annually and maintained. The permittee is directed to immediately review and update all components of the Stormwater Pollution Prevention Plan as outlined in the NCG070000 General Permit. 2) Qualitative monitoring and non-stormwater discharge records could not be located at the time of the inspection. The permittee is directed to locate, and have available all monitoring records outlined and described in the NCG070000 General Permit. This facility will be re -inspected on or after October 3, 2019. If the above items have not been addressed, further action will be taken. If you have any questions, please contact this office at (828) 296-4614 Page 2 of 3 Permit: NCG070193 Owner- Facility: Appalachian Stone Company Inc Inspection Date: 08/29/2019 Inspection Type : Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Does the site have a Stormwater Pollution Prevention Plan? # Does the Plan include a General Location (USGS) map? # Does the Plan include a "Narrative Description of Practices'? # Does the Plan include a detailed site map including outfall locations and drainage areas? # Does the Plan include a list of significant spills occurring during the past 3 years? # Has the facility evaluated feasible alternatives to current practices? # Does the facility provide all necessary secondary containment? # Does the Plan include a BMP summary? # Does the Plan include a Spill Prevention and Response Plan (SPRP)? # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? # Does the facility provide and document Employee Training? # Does the Plan include a list of Responsible Party(s)? # Is the Plan reviewed and updated annually? # Does the Plan include a Stormwater Facility Inspection Program? Has the Stormwater Pollution Prevention Plan been implemented? Comment: See summary for more information. Qualitative Monitoring Has the facility conducted its Qualitative Monitoring semi-annually? Comment: See summary for more information. Permit and Outfalls # Is a copy of the Permit and the Certificate of Coverage available at the site? # Were all outfalls observed during the inspection? # If the facility has representative outfall status, is it properly documented by the Division? # Has the facility evaluated all illicit (non stormwater) discharges? Comment: Yes No NA NE ❑ ❑ ❑ ■❑❑❑ • ❑ ❑ ❑ • ❑ ❑ ❑ ❑■❑❑ ❑ M ❑ ❑ ■❑❑❑ ■❑❑❑ ■❑❑❑ ❑ ❑ ❑ ❑■❑❑ ❑ M ❑ ❑ ❑0❑❑ ❑0❑❑ Yes No NA NE ❑■❑❑ Yes No NA NE Page 3 of 3