Loading...
HomeMy WebLinkAboutWQ0031818_Sewer Extension Permit Status Update_20190829 Request for Engineering Certification Date of Letter August 9,2019 Sewer Extension Permit Status Update Please complete the applicable portion of this form for each permit and return to the Division by the delivery method below rind within 30 days of the date of this letter: NCDEQ/DWR WQPS—PERCS UNIT RECEIVED/NCDEQ/DWR By U.S.Postal Service: By Courier/Special Delivery: By Email: AUG 2 9 2019 1617 Mail Service Center 512 N.Salisbury St.Suite 925 Nyle Hothem Raleigh,NC 27699-1617 Raleigh,NC 27604 Nyle.Hothem@ncdenr.gov Water Quality Permit No.: (tip CZ p 0 3(S-(&' Permittee: r v v1.51".• CO U K l Project Name: 'tri, sw�c IL C[wbtt�w�i'� w l Co �.•6 1ie._ "sera, at el ********************************************************************************************************** Project Status (Check appropriate box to indicate Permittee's response and complete&sign below) 0 Permit to Remain Open. The Permittee certifies that the permitted project has not been constructed but shall be constructed in the future in conformity with the approved Permit,project plans,specifications,and supporting documents.The Permittee understands that the appropriate certification documents will need to be forwarded to the Division prior to operation. Subject permit shall be maintained in Active status. ❑ The Permitted project has been constructed and the required Engineer's Certification and supporting documents will be submitted to the Division with this form. Permittee understands that failure to submit required certification documents for an active,in-service system may result in enforcement action. Request Extension: Permittee requests extension to reply to this letter not to exceed 60 days of the date of this letter. Name&Title(print):• W i•a a ' • P_I_Le1111X P _ l re-G+O r a L l Y'f.r. Signature: Date: �f � / d / Comments: W P O•'re re 11/e.ct IAA c -e.)cte In 5( b v. Tor W i S r-4 fe G� *********************************************************************************************************** Permit Rescission Request The Permittee requests that the subject permit be rescinded and certifies that the permitted sewer system has not been and shall not be constructed nor made operational.We understand that,in the future,should we wish to operate a non-discharge sewer system,we shall apply for and receive a new Wastewater Collection System Permit. Name&Title(Print): Signature: Date: Comments: ********************************************************************************************************** Contact Information Updates Updated Contact Person: Will ia L\ 1... �►r<v�l x r r• L p i VeG to I dr E PLC/,ttieel"r ttp d Updated Mailing Address: 17. 0 , o A. Z(0 "Re, 1+ v ifkl )4. C- 7 f 2 2 Updated Email: W►lt'&a.� . Itn.h.iX @ bruNS J(CtCDUVtt tin(' •r✓ a -r North Carolina Department of Environmental Quality Division of Water Resources Permit Number: W00031818 Version: 1.0 Issued Date: 6/29/2007 Permit Type: Gravity Sewer Extension,Pump Stations,&Pressure Sewer Extensions Facility Name: Brunswick Community College Public Force Main Facility County: Brunswick Latitude: Longitude: Facility Region: Wilmington Owner Information Details: Submit a Permit Ownership/Name Change form to DWR to make any changes to this Owner information. Note that the owner is the legally responsible entity. (Click Here for PermitOwnership/Name Change"Form) Owner Name: Brunswick County Owner Affiliation: John Nichols Title: Utilities Director Addressl: PO Box 249 Address2: City,State&Zip: Bolivia,NC 28422-0249 Work Phone: 910-253-2653 Fax: 910-253-2581 Email Address: John.Nichols(albrunswickcountvnc.aov Permit Engineer/Environmental Consultant Name Organization Name Phone Email John Phillip Norris Norris Kuske&Tunstall Consulting Engineers 910-343-9653 pnorris@nkteng.com Permit Events Event Description Date Comment Permit issued 6/29/2007 permit Comments(including all prior versions) Date Comment Text Version 1.00 • NOTE: Receipt of an Engineering Certification(Partial and/or Final)is required prior to operation of the facility. 8/15/2019 - Page 1