HomeMy WebLinkAbout20190914 Ver 1_USACE NW 12_20190830U.S. ARMY CORPS OF ENGINEERS
WILMINGTON DISTRICT
Action Id. SAW -2019-01397 County: Craven U.S.G.S. Quad: NC -Askin
GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION
Permittee:
Duke Energy Progress, Inc.
c/o Mr. Thomas Williams, Jr.
Address:
410 South Wilmington Street
Raleigh, North Carolina 27601
Telephone Number:
919-546-2354
E-mail:
Thomas.WilliamsJRnn,duke-energv.com
Size (acres) 8.62 Nearest Town New Bern
Nearest Waterway Neuse River River Basin Neuse
USGS HUC 03020202 Coordinates Latitude: 35.196386
Longitude: -77.055703
Location description: The proiect area is within an existing Duke Energy substation facility located at 3431 Hwy17, Bridgeton,
NC, west of the terminus of Askins Brick Road and Hwv 17. The property is approximately 8.62 acres (Parcel Index Numbers:
2-043-050;2-043-075;2-043-074).
Description of projects area and activity: This verification authorizes the permanent loss of 0.16 acres of wetlands, temporary
impacts to 0.09 acres of wetlands, permanent loss of 125 linear feet of tributaries, and temporary impacts to 64 linear feet of
tributaries. Impacts are associated with the expansion of an existing facility.
Applicable Law(s): ® Section 404 (Clean Water Act, 33 USC 1344)
❑ Section 10 (Rivers and Harbors Act, 33 USC 403)
Authorization: NWP 12. Utility Line Activities
SEE ATTACHED NWP GENERAL, REGIONAL, AND/OR SPECIAL CONDITIONS
Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the enclosed
Conditions, your application received 7/9/20191 additional information provided 8/19/2019, and the enclosed plans Wetland
Impacts Exhibit dated 7/9/2019. Any violation of the attached conditions or deviation from your submitted plans may subject
the permittee to a stop work order, a restoration order, a Class I administrative penalty, and/or appropriate legal action.
This verification will remain valid until the expiration date identified below unless the nationwide authorization is modified, suspended
or revoked. If, prior to the expiration date identified below, the nationwide permit authorization is reissued and/or modified, this
verification will remain valid until the expiration date identified below, provided it complies with all requirements of the modified
nationwide permit. If the nationwide permit authorization expires or is suspended, revoked, or is modified, such that the activity would
no longer comply with the terms and conditions of the nationwide permit, activities which have commenced (i.e., are under construction)
or are under contract to commence in reliance upon the nationwide permit, will remain authorized provided the activity is completed
within twelve months of the date of the nationwide permit's expiration, modification or revocation, unless discretionary authority has
been exercised on a case-by-case basis to modify, suspend or revoke the authorization.
Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You
should contact the NC Division of Water Resources (telephone 919-807-6300) to determine Section 401 requirements.
For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act (LAMA), prior
to beginning work you must contact the N.C. Division of Coastal Management Morehead City, NC, at (252) 808-2808.
This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other required Federal, State
or local approvals/permits.
If there are any questions regarding this verification, any of the conditions of the Permit, or the Corps of Engineers regulatory program,
please contact Emily B. Thompson at (910)251-4629or Emily.B.Thompson(&usace.armv.mil.
Digitally signed by Billy W. Standridge,
Billy W. Standridge, USACE Da[re2
Corps Regulatory Official: 019.08.3013:17:19-0a'00' Date: 8/30/2019
Expiration Date of Verification: 03/18/2022
The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we
continue to do so, please complete the Customer Satisfaction Survey located at
http://corpsmapu.usace.army.mil/cm_apex/Pp=136:4:0
Copies furnished (via e-mail):
Agent: Dewberry
Ms. Beth Steffens
Address: 2610 Wycliff Road, Suite 410
Raleigh, North Carolina 27607
Telephone Number: 984-232-6795
E-mail: esteffens(&dewberry.com
Property Owner: Duke Energy Progress Inc.
Mr. Brad Tripp
Telephone Number: 919-546-2742
E-mail: Brad.TrippAduke-eneray.com
SAW -2019-01397
SPECIAL CONDITIONS
a. In order to compensate for impacts associated with this permit, mitigation shall be provided in accordance
with the provisions outlined on the most recent version of the attached Compensatory Mitigation Responsibility
Transfer Form. The requirements of this form, including any special conditions listed on this form, are hereby
incorporated as special conditions of this permit authorization.
Compensatory Mitigation Responsibility Transfer Form
Permittee: Duke Energy Progress, Inc., c/o Mr. Thomas Williams, Jr. Action ID: SAW -2019-01397
Project Name: Bridgeton 115kV Substation County: Craven
Instructions to Permittee: The Permittee must provide a copy of this form to the Mitigation Sponsor, either an approved
Mitigation Bank or the North Carolina Division of Mitigation Services (NCDMS), who will then sign the form to verify the
transfer of the mitigation responsibility. Once the Sponsor has signed this form, it is the Permittee's responsibility to ensure
that to the U.S. Army Corps of Engineers (USACE) Project Manager identified on page two is in receipt of a signed copy of this
form before conducting authorized impacts, unless otherwise specified below. If more than one mitigation Sponsor will be
used to provide the mitigation associated with the permit, or if the impacts and/or the mitigation will occur in more than one
8 -digit Hydrologic Unit Code (HUC), multiple forms will be attached to the permit, and the separate forms for each Sponsor
and/or HUC must be provided to the appropriate mitigation Sponsors.
Instructions to Sponsor: The Sponsor must verify that the mitigation requirements (credits) shown below are available at the
identified site. By signing below, the Sponsor is accepting full responsibility for the identified mitigation, regardless of
whether or not they have received payment from the Permittee. Once the form is signed, the Sponsor must update the bank
ledger and provide a copy of the signed form and the updated bank ledger to the Permittee, the USACE Project Manager, and
the Wilmington District Mitigation Office (see contact information on page 2). The Sponsor must also comply with all
reporting requirements established in their authorizing instrument.
Permitted Impacts and Compensatory Mitigation Requirements:
Permitted Impacts Requiring Mitigation* 8 -digit HUC and Basin: 03020202, Neuse River Basin
Stream Impacts (linear feet)
Wetland Impacts (acres)
Warm
Cool
Cold
Riparian Riverine
Riparian Non-Riverine
Non -Riparian
Coastal
.32
.16
*If more than one mitigation sponsor will be used for the permit, only include impacts to be mitigated by this sponsor.
Compensatory Mitigation Requirements: 8 -digit HUC and Basin: 03020202, Neuse River Basin
Stream Mitigation (credits) Wetland Mitigation (credits)
Warm
Cool
Cold Riparian Riverine
Riparian Non-Riverine
Non -Riparian
Coastal
.32
Mitigation Site Debited: Neu -Con Wetland & Stream Umbrella Mitigation Bank — Casey King Site
(List the name of the bank to be debited. For umbrella banks, also list the specific site. For NCDMS, list NCDMS. If the NCDMS
acceptance letter identifies a specific site, also list the specific site to be debited).
Section to be completed by the Mitigation Sponsor
Statement of Mitigation Liability Acceptance: I, the undersigned, verify that I am authorized to approve mitigation
transactions for the Mitigation Sponsor shown below, and I certify that the Sponsor agrees to accept full responsibility for
providing the mitigation identified in this document (see the table above), associated with the USACE Permittee and Action
ID number shown. I also verify that released credits (and/or advance credits for NCDMS), as approved by the USACE, are
currently available at the mitigation site identified above. Further, I understand that if the Sponsor fails to provide the
required compensatory mitigation, the USACE Wilmington District Engineer may pursue measures against the Sponsor to
ensure compliance associated with the mitigation requirements.
Mitigation Sponsor Name:
Name of Sponsor's Authorized Representative:
Signature of Sponsor's Authorized Representative Date of Signature
Conditions for Transfer of Compensatory Mitigation Credit:
• Once this document has been signed by the Mitigation Sponsor and the USACE is in receipt of the signed form, the
Permittee is no longer responsible for providing the mitigation identified in this form, though the Permittee remains
responsible for any other mitigation requirements stated in the permit conditions.
• Construction within jurisdictional areas authorized by the permit identified on page one of this form can begin only after
the USACE is in receipt of a copy of this document signed by the Sponsor, confirming that the Sponsor has accepted
responsibility for providing the mitigation requirements listed herein. For authorized impacts conducted by the North
Carolina Department of Transportation (NCDOT), construction within jurisdictional areas may proceed upon permit
issuance; however, a copy of this form signed by the Sponsor must be provided to the USACE within 30 days of permit
issuance. NCDOT remains fully responsible for the mitigation until the USACE has received this form, confirming that the
Sponsor has accepted responsibility for providing the mitigation requirements listed herein.
• Signed copies of this document must be retained by the Permittee, Mitigation Sponsor, and in the USACE administrative
records for both the permit and the Bank/ILF Instrument. It is the Permittee's responsibility to ensure that the USACE
Project Manager (address below) is provided with a signed copy of this form.
• If changes are proposed to the type, amount, or location of mitigation after this form has been signed and returned to
the USACE, the Sponsor must obtain case-by-case approval from the USACE Project Manager and/or North Carolina
Interagency Review Team (NCIRT). If approved, higher mitigation ratios may be applied, as per current District guidance
and a new version of this form must be completed and included in the USACE administrative records for both the permit
and the Bank/ILF Instrument.
Comments/Additional Conditions: A letter from EBX-Neuse I, LLC, confirming they are willing and able to accept the applicants
compensatory mitigation responsibility, dated 6/28/2019 was included with the preconstruction notification.
This form is not valid unless signed below by the USACE Project Manager and by the Mitigation Sponsor on Page 1. Once
signed, the Sponsor should provide copies of this form along with an updated bank ledger to: 1 j the Permittee, 2) the USACE
Project Manager at the address below, and 3) the Wilmington District Mitigation Office, Attn: Todd Tugwell, 11405 Falls
of Neuse Road, Wake Forest, NC27587 (email: todd.tugwell@usace.army. mil). Questions regarding this form or any of the
permit conditions may be directed to the USACE Project Manager below.
USACE Project Manager: Emily B. Thompson
USACE Field Office: Washington Regulatory Office
US Army Corps of Engineers
2407 West Fifth Street
Washington, North Carolina 27889
Email: Emily.B.Thompson@usace.army.mil
Digitally signed by Billy
Billy W. W. Standridge, USACE
Standridge, USACE Date: 2019.08.30
13:20:22 -04'00'
USACE Project Manager Signature
8/30/2019
Date of Signature
Current Wilmington District mitigation guidance, including information on mitigation ratios, functional assessments, and
mitigation bank location and availability, and credit classifications (including stream temperature and wetland groupings) is
available at http://ribits.usace.army.mil
Action ID Number: SAW -2019-01397 County: Craven
Permittee: Duke Energy Progress, Inc., c/o Mr. Thomas Williams, Jr.
Project Name: Bridgeton 115kV Substation
Date Verification Issued: 8/30/2019
Project Manager: Emily B. Thompson
Upon completion of the activity authorized by this permit and any mitigation required by the permit,
sign this certification and return it to the following address:
US ARMY CORPS OF ENGINEERS
WILMINGTON DISTRICT
Attn: Emily B. Thompson
Washington Regulatory Office
U.S Army Corps of Engineers
2407 West Fifth Street
Washington, North Carolina 27889
or
Emily.B.Thompson@usace.army.mil
Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of
Engineers representative. Failure to comply with any terms or conditions of this authorization may
result in the Corps suspending, modifying or revoking the authorization and/or issuing a Class I
administrative penalty, or initiating other appropriate legal action.
I hereby certify that the work authorized by the above referenced permit has been completed in
accordance with the terms and condition of the said permit, and required mitigation was completed in
accordance with the permit conditions.
Signature of Permittee Date
A-�
!�
� T 1
I
II
63 LINEAR FEET OF
r\ INTERMITTENT
STREAM IMPACTS.
INTERMITTENT r
STREAM TA I
�
I �
I �
J V
34 LINEAR FEET OF
DAYLIGHTING OF—
INTERMITTENT STREAM
IA 62 LINEAR FEET OF
INTERMITTENT
STREAM IMPACTS.
/ �-- I — EPHEMERAL STREAM
WETLANDS FLAGS - \
T-1 THRU /
T=6
�l WA-�jT
WA -2A -
HORIZONTAL
GRAPHIC SCALE
40 0 20 40 80
m OIL-
( IN FEET )
1 inch = 40 ft.
PERMANENT WETLAND IMPACTS
(0.16 ACRES)
TC -4
/
J'
IN,
II
WETZA/VOS FLAGS �\
Tc- 1
T//RU TC -4
WB -
I 1 GROUNDING LINE
DITCH, TYP.
LEGEND
►1������I���j�
1
WETLANDS FLAGS W
WA -2A RU WA -14A l
PERMANENT WETLAND
IMPACTS (WA -1)
TEMPORARY WETLAND
IMPACTS (WA -2)
l TZANDFLAGS
f 18" WIDE TRENCH IMPACTS 1NR 96-4A /
78-3-
HE- I
B -3 WB -1
-44
WETZAND
1:0 TTS' U LAGS /
TEMPORARY WETLAND IMPACTS \ \
S
(0.09 ACRES) \ 1
D L
\L
DATE TITLE SHEET NO.
07.09.2019 WETLAND IMPACTS EXHIBIT
PROJ. NO. PROJECT
BRIDGETON 11 5K SUBSTATION
50102846 3431 HWY 17
\I
Dewberry
Dewberry Engineers Inc.
2610 WYCLIFF ROAD
SUITE 410
RALEIGH, NC 27607
PHONE: 919.881.9939
FAX: 919.881.9923
NCBELS # F-0929
PERMANENT WETLAND
IMPACTS (WA -1)
TEMPORARY WETLAND
IMPACTS (WA -2)
l TZANDFLAGS
f 18" WIDE TRENCH IMPACTS 1NR 96-4A /
78-3-
HE- I
B -3 WB -1
-44
WETZAND
1:0 TTS' U LAGS /
TEMPORARY WETLAND IMPACTS \ \
S
(0.09 ACRES) \ 1
D L
\L
DATE TITLE SHEET NO.
07.09.2019 WETLAND IMPACTS EXHIBIT
PROJ. NO. PROJECT
BRIDGETON 11 5K SUBSTATION
50102846 3431 HWY 17
\I
Determination of Jurisdiction:
A. ® There are waters, including wetlands on the above described project area that may be subject to Section 404 of the Clean
Water Act (CWA) (33 USC § 1344) and/or Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403). This preliminary
determination is not an appealable action under the Regulatory Program Administrative Appeal Process (Reference 33 CFR Part
331). However, you may request an approved JD, which is an appealable action, by contacting the Corps district for further
instruction. Please note, if work is authorized by either a general or nationwide permit, and you wish to request an appeal of an
approved JD, the appeal must be received by the Corps and the appeal process concluded prior to the commencement of any work
in waters of the United States and prior to any work that could alter the hydrology of waters of the United States.
B. ❑ There are Navigable Waters of the United States within the above described project area subject to the permit requirements of
Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403) and Section 404 of the Clean Water Act (CWA) (33 USC §
1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to
exceed five years from the date of this notification.
C. ❑ There are waters, including wetlands within the above described project area that are subject to the permit requirements of
Section 404 of the Clean Water Act (CWA) (33 USC § 1344). Unless there is a change in the law or our published regulations,
this determination may be relied upon for a period not to exceed five years from the date of this notification.
D. ❑ The jurisdictional areas within the above described project area have been identified under a previous action. Please reference
jurisdictional determination issued DATE. Action ID: FILE NUMBER.
Basis For Determination: The wetlands within the proiect area were delineated using the Corps of Engineers 1987
Wetland Delineation Manual and the Atlantic and Gulf Coastal Plain Reeional Suaalement Version 2.0.
Remarks: None.
E. Attention USDA Program Participants
This delineation/determination has been conducted to identify the limits of Corps' Clean Water Act jurisdiction for the particular site
identified in this request. The delineation/determination may not be valid for the wetland conservation provisions of the Food Security
Act of 1985. If you or your tenant are USDA Program participants, or anticipate participation in USDA programs, you should request
a certified wetland determination from the local office of the Natural Resources Conservation Service, prior to starting work.
F. Appeals Information (This information applies only to approved jurisdiction determinations as indicated in B and C
above).
This correspondence constitutes an approved jurisdiction determination for the above described site. If you object to this
determination, you may request an administrative appeal under Corps regulations at 33 CFR Part 331. Enclosed you will find a
Notification of Appeal Process (NAP) fact sheet and request for appeal (RFA) form. If you request to appeal this determination you
must submit a completed RFA form to the following address:
US Army Corps of Engineers
South Atlantic Division
Attn: Jason Steele, Review Officer
60 Forsyth Street SW, Room 10M 15
Atlanta, Georgia 30303-8801
Phone: (404) 562-5137
In order for an RFA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the criteria for appeal
under 33 CFR part 331.5, and that it has been received by the Division Office within 60 days of the date of the NAP. Should you
decide to submit an RFA form, it must be received at the above address by Not applicable.
**It is not necessary to submit an RFA form to the Division Office if you do not object to the determination in this correspondence. **
Digitally signed by Billy W. Standridge,
Billy W. Standridge, USACE USACE
Corps Regulatory Official: _ Date. 20 9AR_4o,3.,R-SS-oa'no'
Emily B. Thompson
Date of JD: 8/30/2019
Expiration Date of JD: Not applicable
NOTIFICATION OF ADMINISTRATIVE APPEAL OPTIONS AND PROCESS AND
REQUEST FOR APPEAL
Applicant: Duke Energy Progress, Inc., c/o Mr. Thomas
File Number: SAW -2019-01397
Date: 8/30/2019
Williams Jr.
Attached is: See Section below
PROFFERED PERMIT Standard Permit or Letter of ermission A
RED PERMIT Standard Permit or Letter of ermission B
DENIAL C
LAPPROVED
JURISDICTIONAL DETERMINATION D
INARY JURISDICTIONAL DETERMINATION E
SECTION I - The following identifies your rights and options regarding an administrative appeal of the above decision.
Additional information may be found at or http://www.usace.gM.mil/Missions/CivilWorks/ReizulatoiyProgramandPennits.aspx
or the Corps regulations at 33 CFR Part 331.
A: INITIAL PROFFERED PERMIT: You may accept or object to the permit.
• ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final
authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your
signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all
rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the
permit.
• OBJECT: If you object to the permit (Standard or LOP) because of certain terms and conditions therein, you may request
that the permit be modified accordingly. You must complete Section I1 of this form and return the form to the district
engineer. Your objections must be received by the district engineer within 60 days of the date of this notice, or you will
forfeit your right to appeal the permit in the future. Upon receipt of your letter, the district engineer will evaluate your
objections and may: (a) modify the permit to address all of your concerns, (b) modify the permit to address some of your
objections, or (c) not modify the permit having determined that the permit should be issued as previously written. After
evaluating your objections, the district engineer will send you a proffered permit for your reconsideration, as indicated in
Section B below.
B: PROFFERED PERMIT: You may accept or appeal the permit
• ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final
authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your
signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all
rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the
permit.
• APPEAL: If you choose to decline the proffered permit (Standard or LOP) because of certain terms and conditions therein,
you may appeal the declined permit under the Corps of Engineers Administrative Appeal Process by completing Section II of
this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days
of the date of this notice.
C: PERMIT DENIAL: You may appeal the denial of a permit under the Corps of Engineers Administrative Appeal Process by
completing Section I1 of this form and sending the form to the division engineer. This form must be received by the division
engineer within 60 days of the date of this notice.
D: APPROVED JURISDICTIONAL DETERMINATION: You may accept or appeal the approved JD or provide new
information.
• ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to notify the Corps within 60 days of the
date of this notice, means that you accept the approved JD in its entirety, and waive all rights to appeal the approved JD.
• APPEAL: If you disagree with the approved JD, you may appeal the approved JD under the Corps of Engineers
Administrative Appeal Process by completing Section II of this form and sending the form to the district engineer. This form
must be received by the division engineer within 60 days of the date of this notice.
E: PRELIMINARY JURISDICTIONAL DETERMINATION: You do not need to respond to the Corps regarding the
preliminary JD. The Preliminary JD is not appealable. If you wish, you may request an approved JD (which may be appealed),
by contacting the Corps district for further instruction. Also you may provide new information for further consideration by the
Corps to reevaluate the JD.
SECTION II - REQUEST FOR APPEAL or OBJECTIONS TO AN INITIAL PROFFERED PERMIT
REASONS FOR APPEAL OR OBJECTIONS: (Describe your reasons for appealing the decision or your objections to an initial
proffered permit in clear concise statements. You may attach additional information to this form to clarify where your reasons or
objections are addressed in the administrative record.)
ADDITIONAL INFORMATION: The appeal is limited to a review of the administrative record, the Corps memorandum for the
record of the appeal conference or meeting, and any supplemental information that the review officer has determined is needed to
clarify the administrative record. Neither the appellant nor the Corps may add new information or analyses to the record.
However, you may provide additional information to clarify the location of information that is already in the administrative
record.
POINT OF CONTACT FOR QUESTIONS OR INFORMATION:
If you have questions regarding this decision and/or the
If you only have questions regarding the appeal process you may
appeal process you may contact:
also contact:
District Engineer, Wilmington Regulatory Division
Mr. Jason Steele, Administrative Appeal Review Officer
Attn: Emily B. Thompson
CESAD-PDO
Washington Regulatory Office
U.S. Army Corps of Engineers, South Atlantic Division
U.S Army Corps of Engineers
60 Forsyth Street, Room 1OM15
207 West Fifth Street
Atlanta, Georgia 30303-8801
Washington, North Carolina 27889
Phone: (404) 562-5137
RIGHT OF ENTRY: Your signature below grants the right of entry to Corps of Engineers personnel, and any government
consultants, to conduct investigations of the project site during the course of the appeal process. You will be provided a 15 day
notice of any site investigation, and will have the opportum to participate in all site investi ations.
Date:
Telephone number:
Signature of appellant oragent.
For appeals on Initial Proffered Permits send this form to:
District Engineer, Wilmington Regulatory Division, Attn: Emily B. Thompson, 69 Darlington Avenue, Wilmington, North
Carolina 28403
For Permit denials, Proffered Permits and Approved Jurisdictional Determinations send this form to:
Division Engineer, Commander, U.S. Army Engineer Division, South Atlantic, Attn: Mr. Jason Steele, Administrative Appeal
Officer, CESAD-PDO, 60 Forsyth Street, Room 1OM15, Atlanta, Georgia 30303-8801
Phone: (404) 562-5137
01 ..
Y;� y
A,
j
Ser/C• � .t: .. a• -,
/TA
57 R f 57 LF
01
WA
/ 156 LF
Non-Riverine /
Swamp Forest / y
e my
O
WBTB G
�. p
Forest (Non-Tidal 91
Non-Riverine Swam
Freshwater Marsh
#4 inside easement)
1 AC
, Project Study Area
Potential Wetland Waters of the US
Potential Non-Wetland Waters of the US (Tributary)
0 100 200
Source: NC OneMap High Resolution NC Statewide Orthoimagery,
DUKEI� CGIA, 2016; Project Study Area approximated by ESI from parcel data.
LJ Feet
E N E RAY Note Vegetation removal or alteration of soils or Disclaimer The information depicted on this figure is for informational purposes only and was not
fro"") ENERGY,, hydrology after initial site evaluation can affect Prepared for, and is not suitable for legal or engineering purposes. This information presented is not
jurisdictional status and may require re-evaluation of for regulatory review and is intended for use only by a Professional Land Surveyor prior to regulatory
review.
wetland boundaries.
ENVIRONMENTAL Project: ER15010.135
Potential Wetland/Waters of the US
SERVICES, INC. Date: May 2018
Trademark Drive
Rale N Bridgeton 115k Substation
Raleigh, North Carolina 27610
(919j 212-1760 Drwn/Chkd: CW/JH
(9'9'2'2-'707 FAX Craven County, North Carolina
www. environmentalservicesinc,com J I I I Figure: 3
Path: P:\GeoGra\Projects\2015\010\135\GIS\fig_JDaerial.mxd Date: 5/30/201810:54:21 AM