Loading...
HomeMy WebLinkAbout20190914 Ver 1_Amended Impact Information_20190823Thompson, Emily B CIV USARMY CESAW (US) From: Steffens, Beth <esteffens@Dewberry.com> Sent: Monday, August 19, 2019 10:08 AM To: Thompson, Emily B CIV USARMY CESAW (US) Subject: [Non-DoD Source] RE: Bridgeton 115kV Substation - Duke Energy Project (UNCLASSIFIED) Emily, We made a math error when adding up the impacts (the exhibit is correct). The impacts are as follows: Permanent Impacts (culvert install) = 125 LF (62+63) Temporary Impacts (culvert removal/daylighting) = 34 LF Total Stream and Ditch Impacts = 159 LF What is the best way to make this correction to the application? Thanks, Beth Beth Steffens, PE Project Manager Dewberry 2610 Wycliff Road, Suite 410 Raleigh, NC 27607 984.232.6795 Blockedwww.dewberry.com -----Original Message ----- From: Thompson, Emily B CIV USARMY CESAW (US) [ma ilto: Emily. B.Thompson@usace.army.mi1] Sent: Friday, August 16, 2019 4:17 PM To: Steffens, Beth <esteffens@Dewberry.com> Subject: RE: Bridgeton 115kV Substation - Duke Energy Project (UNCLASSIFIED) [CAUTION] External Email. Do NOT click links or open attachments unless expected. Please use the "Phish Alert" button to report all suspicious emails. CLASSIFICATION: UNCLASSIFIED Beth, Thank you for the explanation - it's important for our records to know whether it's mechanized land clearing vs. handcut and conversion of wetland types. Also, I noticed that the Wetland Impacts Exhibit shows 63 linear feet and 62 linear feet of intermittent stream impacts and 34 linear feet of daylighting of the same intermittent stream; however, that would add up to be 125 linear feet of permanent impacts (loss for our records) or if including the daylighting it would be 159 feet, not the 139 linear feet proposed for culvert installation. I'm not seeing where the 71 linear feet of temporary impacts (culvert removal) to the intermittent stream on the exhibit either. Hope you have a great weekend, Emily Emily B. Thompson Regulatory Specialist U.S. Army Corps of Engineers Washington Regulatory Field Office 2407 W. 5th Street Washington, NC 27889 (910) 251-4629 Emily.B.Thompson@usace.army.mil -----Original Message ----- From: Steffens, Beth [mailto:esteffens@Dewberry.com] Sent: Friday, August 16, 2019 3:13 PM To: Thompson, Emily B CIV USARMY CESAW (US) <Emily.B.Thompson@usace.army.mil> Cc: Covil, Patrick <pcovil@Dewberry.com> Subject: [Non-DoD Source] RE: Bridgeton 115kV Substation - Duke Energy Project (UNCLASSIFIED) Emily, Duke Energy maintains two areas near their transmission line: 1. The right-of-way (fully cleared of trees, but not grubbed) 2. The Danger Tree Zone outside of their right of way. Duke Energy identifies (flags) any trees that are tall enough to damage the transmission line if they would fall and removes only those trees. Vegetation that does not threaten Duke Energy's facilities will remain. The 0.09 acres of temporary wetland impacts is in the Danger Tree Zone. Only trees identified as tall enough to damage the transmission line will be removed from this area. Duke Energy will then periodically evaluate this danger tree zone and remove any trees that have grown large enough to threaten their facilities. Hope that answers your question. Please let me know if you need any more info. Thank you, Beth Steffens, PE Project Manager Dewberry 2610 Wycliff Road, Suite 410 Raleigh, NC 27607 984.232.6795 Blocked Blockedwww.dewberry.com -----Original Message ----- From: Thompson, Emily B CIV USARMY CESAW (US) [ma ilto: Emily. B.Thompson@usace.army.mil] Sent: Friday, August 16, 2019 2:47 PM To: Steffens, Beth <esteffens@Dewberry.com> Subject: RE: Bridgeton 115kV Substation - Duke Energy Project (UNCLASSIFIED) [CAUTION] External Email. Do NOT click links or open attachments unless expected. Please use the "Phish Alert" button to report all suspicious emails. CLASSIFICATION: UNCLASSIFIED Good afternoon, I appreciate you reaching out. In my review, I notice that there is 0.09 acres of temporary impacts for tree clearing. Will this area be cut/maintained or will it be left to grow back after the project is complete? Sincerely, Emily Emily B. Thompson Regulatory Specialist U.S. Army Corps of Engineers Washington Regulatory Field Office 2407 W. 5th Street Washington, NC 27889 (910) 251-4629 Emily.B.Thompson@usace.army.mil -----Original Message ----- From: Steffens, Beth [mailto:esteffens@Dewberry.com] Sent: Friday, August 9, 2019 1:47 PM To: Thompson, Emily B CIV USARMY CESAW (US) <Emily.B.Thompson@usace.army.miI> Cc: Covil, Patrick <pcovil@Dewberry.com> Subject: [Non-DoD Source] Bridgeton 115kV Substation - Duke Energy Project Ms. Thompson, I'm checking in to see if you need any additional information in order to complete the review of Duke Energy's Bridgeton 115kV Substation project in Craven Co. The electronic 404 PCN was submitted on 7/11/2019. Please let me know if you have any questions. If you are not the reviewer of this project, please let me know who I should contact. Thank you, Beth Beth Steffens, PE Project Manager Dewberry 2610 Wycliff Road, Suite 410 Raleigh, NC 27607 984.232.6795 Blocked Blocked Blockedwww.dewberry.com <BlockedBlockedBlockedhttp://www.dewberry.com/> Visit Dewberry's website at Blocked Blocked Blockedwww.dewberry.com <BlockedBlockedBlockedhttps://www.dewberry.com> If you've received this email even though it's intended for someone else, then please delete the email, don't share its contents with others, and don't read its attachments. Thank you. CLASSIFICATION: UNCLASSIFIED Visit Dewberry's website at BlockedBIockedwww.dewberry.com<BlockedBlockedhttps://www.dewberry.com> If you've received this email even though it's intended for someone else, then please delete the email, don't share its contents with others, and don't read its attachments. Thank you. CLASSIFICATION: UNCLASSIFIED Visit Dewberry's website at Blockedwww.dewberry.com<Blockedhttps://www.dewberry.com> If you've received this email even though it's intended for someone else, then please delete the email, don't share its contents with others, and don't read its attachments. Thank you.