Loading...
HomeMy WebLinkAboutNCG080050_NOD_20190827ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Director NORTH CAROLINA Environmental Quality August 27, 2019 CERTIFIED MAIL: 7019 0700 0000 8867 9662 RETURN RECEIPT REQUESTED NHM Constructors Attn: Richard Robinson Post Office Box 6385 Asheville, North Carolina 28816 Subject: NOTICE OF DEFICIENCY (NOD-2019-PC-0190) NPDES Stormwater General Permit NCG08000 Certificate of Coverage NCGO80050 NHM Constructors Buncombe County Dear Mr. Robinson: On August 7, 2019, Isaiah Reed from the Asheville Regional Office of the Division of Energy, Mineral and Land Resources (DEMLR), conducted a compliance inspection for the NHM Constructors facility located at 50 Interstate Boulevard, Buncombe County, North Carolina. A copy of the Compliance Inspection Report is enclosed for your review. The inspection and file review revealed that the subject facility is covered by NPDES Stormwater General Permit NCG080000 under Certificate of Coverage NCG080050. Permit coverage authorizes the discharge of stormwater from the facility to receiving waters designated as Hominy Creek, a Class C waterbody in the French Croad River Basin. As a result of the inspection, the following deficiencies are noted: 1) Stormwater Pollution Prevention Plan (SWPPP) A Stormwater Pollution Prevention Plan (SWPPP) has not been developed, recorded, or properly implemented. �FQ North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Asheville Regional Office 12090 U.S. Highway 701 Swannanoa, North Carolina 28778 a++�� 828.296.4500 2) Analytical and Qualitative Monitoring Analytical and Qualitative monitoring has not been conducted and recorded in accordance with permit requirements. 3) Secondary Containment Secondary containment has not been provided for all bulk storage of liquid materials on site. Requested Response You are asked to respond to this office, in writing, within 30 calendar days from receipt of this notice. Your written response should include a reasonable explanation as to why the above stated deficiencies have occurred, as well as a Plan of Action to prevent them from recurring. Action Items Immediately begin efforts to comply with General Permit NCG080000, including but not limited to: 1. Develop, implement, and maintain an acceptable SWPPP. 2. Begin monitoring at all outfalls. 3. Provide secondary containment for all areas where bulk liquid materials are stored. Thank you for your attention to this matter. This office requires that the deficiencies, as noted above and detailed in the enclosed inspection report, be properly resolved. Failure to address the deficiencies could result in the issuance of a Notice of Violation, which could be subject to a civil penalty assessment of up to $25, 000 per day for each violation. Should you have any questions or concerns, please contact Isaiah Reed or myself at (828) 296-4500. Sincerely, tanley E. Aiken Regional Engineer Land Quality Section Enclosure: Inspection Report ec: Alaina Morman, Environmental Specialist Stan Aiken, Regional Engineer Compliance Inspection Report Permit: NGG080050 Effective: 11/01/18 Expiration: 05/31/21 Owner: Nhm Constructors SOC: Effective: Expiration: Facility: NHM Constructors -shop County: Buncombe 50 Interstate Blvd Region: Asheville Asheville NC 28806 Contact Person: George Davis Title: Phone: 828-252-5651 Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 08/07/2019 Primary Inspector: Isaiah L Reed Secondary Inspector(s): Certification: Phone: Entry Time: 01:OOPM Exit Time: 02:OOPM Phone: 828-296-4614 Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Transportation w/Vehicle Maintenance/Petroleum Bulk/Oil Water Separator Stormwater Discharge COC Facility Status: ❑ Compliant Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NCG080050 Owner- Facility: Nhm Constructors Inspection Date: 08/07/2019 Inspection Type : Compliance Evaluation Reason for Visit: Routine Inspection Summary: On August 8, 2019 this facility was inspected for compliance. During the inspection, the following items were noted: 1) A Stormwater Pollution Prevention Plan has not been maintained on site. 2) Qualitative monitoring has not been conducted on site. 3) Analytical monitoring has not been conducted on site. 4) Secondary containment has not been provided for all bulk storage of liquid materials. Please see the enclosed Notice of Deficiency for corrective actions. If you have any questions, please contact this office at (828) 296-4614. Page 2 of 3 Permit: NCGO80050 Owner • Facility: Nhm Constructors Inspection Date: 08/07/2019 Inspection Type : Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ❑ 0 ❑ ❑ # Does the Plan include a General Location (USGS) map? ❑ 0 ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? ❑ 0 ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ 0 ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ❑ 0 ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ❑ 0 ❑ ❑ # Does the facility provide all necessary secondary containment? ❑ 0 ❑ ❑ # Does the Plan include a BMP summary? ❑ 0 ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ❑ 0 ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ 0 ❑ ❑ # Does the facility provide and document Employee Training? ❑ 0 ❑ ❑ # Does the Plan include a list of Responsible Parly(s)? ❑ 0 ❑ ❑ # Is the Plan reviewed and updated annually? ❑ 0 ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? ❑ 0 ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ❑ N ❑ ❑ Comment: See summary for more information Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ❑ 0 ❑ ❑ Comment: See summary for more information. Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ❑ 0 ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ 0 ❑ ❑ Comment: See summary for more information. Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ❑ 0 ❑ ❑ # Were all outfalls observed during the inspection? 0 ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ 0 ❑ # Has the facility evaluated all illicit (non stormwaler) discharges? ❑ ❑ ❑ Comment: Page 3 of 3