Loading...
HomeMy WebLinkAboutNCS000250_NCDOT McDowell Co Maintenance Facility Inspection_20190603MUNICIPAL SEPARATE STORM SEWER SYSTEM (MS4) PROGRAM AUDIT REPORT NPDES PERMIT NO. NCS000250 Marion Facility, NORTH CAROLINA 3931 NC 226 S Marion, NC 28752 Audit Date: June 3, 2019 Report Date: June 3, 2019 North Carolina Department of Environmental Quality Division of Energy, Mineral & Land Resources Stormwater Program 512 N. Salisbury Street, 9th floor 1612 Mail Service Center Raleigh, NC 27699-1612 NCS000250 Marion MS4 Audit 20190603 Audit Details Audit ID Number: Audit Date(s): NCS000250_ MS4 Audit_20190603 June 3, 2019 Minimum Control Measures Evaluated: ❑ Program Implementation, Documentation & Assessment ❑ Public Education & Outreach ❑ Public Involvement & Participation ❑ Illicit Discharge Detection & Elimination ❑ Construction Site Runoff Controls - No delegated Sediment and Erosion Control Program ❑ Construction Site Runoff Controls — Delegated Sediment and Erosion Control Program ❑ Post -Construction Site Runoff Controls ❑ Pollution Prevention and Good Housekeeping for Municipal Operations ❑ Total Maximum Daily Loads (TMDLs) Field Site Visits: N Municipal Facilities. Number visited: Choose an item. ❑ MS4 Outfalls. Number visited: Choose an item. ❑ Construction Sites. Number visited: Choose an item. ❑ Post -Construction Stormwater Runoff Controls. Number visited: Choose an item. ❑ Other: Number visited: Choose an item. ❑ Other: Number visited: Choose an item. Inspector(s) Conducting Audit Name, Title Oreanization Isaiah Reed, Environmental Specialist NCDEQ Audit Report Author, Date: Signature Q �Jy Audit Report Author: Date Signature NCS000250_Marion MS4 Audit_20190603 Page 1 of 4 Permittee Information M54 Permittee Name: NCDOT Permit Effective Date: October 1, 2015 Permit Expiration Date: September 30, 2020 Mailing Address: Date of Last M54Inspection/Audit: 11/29/2016 Co-permittee(s), if applicable: Permit Owner of Record: James H. Trogdon III Primary MS4 Representatives Participating in Audit Name, Title Organization Wade Tate, County Maintenance Engineer NCDOT Donnie Dockery, Maintenance Mechanic NCDOT Dan O'Connor, Roadside Environmental NCDOT Walt Russell, Division Safety Coordinator NCDOT Evan M. Hollifield, Equipment Supervisor NCDOT MS4 Receiving Waters Waterbodv Classification Impairments Youngs Fork(Corpening Creek) C N/A NCS000250_Marion MS4 Audit_20190603 Page 2 of 4 Site Visit Evaluation: Municipal Facility No. 1 Facility Name: Marion NCDOT Facility Date and Time of Site Visit: June 3, 2019 Facility Address: 3931 NC 226 S Marion, NC 28752 Facility Type (Vehicle Maintenance, Landscaping, etc.): Vehicle Maintenance, Landscaping, Road, Bridge yard. Name of MS4 inspector(s) evaluated: Donnie Dockery and Evan M. Hollifield Most Recent MS4 Inspection (List date and name of inspector): Name(s) and Title(s) of Facility Representative(s) Present During the Site Visit: Name Title See list "Primary MS4 Representatives Participating in Audit" Observations Facility Documentation/Training' Does the facility have a Stormwater Pollution Prevention Plan (SWPPP) or similar document? Is it facility -specific? -SWPPP was available at facility, and has been reviewed annually and maintained. What type of stormwater training do facility employees receive? How often? -Annual video training, and online course/test. Inspector Training/Knowledge What type of stormwater training does the MS4 inspector receive? How often? -Annual video training, and online course/test. Did the MS4 inspector appear knowledgeable about Permit requirements for pollution prevention and good housekeeping? -Yes Did the MS4 inspector appear knowledgeable about stormwater pollution prevention and good housekeeping? -Yes Inspection Procedures Does the MS4 inspector's process include the use of a checklist or other standardized form? -Yes Does the MS4 inspector's process include taking photos? -No Does the MS4 inspector's process include reviewing the facility's SWPPP (or similar document)? -No NCS000250_Marion MS4 Audit_20190603 Page 3 of 4 Site Visit Evaluation: Municipal Facility No. 1 Does the MS4 inspector's process include walking the entire facility and inspecting all points of discharge? -Yes Did the MS4 inspector miss any obvious areas of concern? If so, explain: -No Does the M54 inspector's process include presenting the inspection findings to the facility contact? -Yes Inspection Results - Did the facility inspection result in any corrective actions to be implemented? If so, for what issue(s)? -Insufficient Secondary Containment was identified at the facility. Corrective action is to replace the containment pallets with sufficiently sides containment pallets. If compliance corrective actions were identified, what timeline for correction/follow-up was provided? -None Notes/Comments/Recommendations -There are specific reports (Forms 7, 17, 19, 23, and 24) for various locations at the facility. However, there was no checklist for the laydown area adjacent to Hwy 226, the fueling area, and the area at the NW end of the facility. It is recommended that the same forms be filled out for inspections in those areas. -Stormwater training on the subject of secondary containment is recommended for future training. -Wording in the inspection reports was misleading/confusing for the MS4 inspectors. It is recommended that those inspection reports be revised for clarification. NC5000250_Marion MS4 Audit_20190603 Page 4 of 4