Loading...
HomeMy WebLinkAbout20191153 Ver 1_15916_Wetland Permit Drawing 11x17_20190829I A J See Sheet 1-B For Conventional Plan Sheet Symbols eta 53 Jacksonville City Limit 1336 BEGIN PROJECT c °c UVa�ey+ de sec 2714 0, e G BPS 53 e FP 0 'Fly L. Bj END PROJECT 1308 2714 1470 VICINITY MAP STATIC OF NORTH CARO]I INA DIVISION OF HIGHWAYS ONSLOW. COUNTY PERMIT DRAWING SHEET 1 8TA1S -A" FRQIBCr OtIff NCB NO U-5789 1 21 8TAT6 PRO/.NO. F.A.NI Ift 088CRIF110N 44361.1.1 WA PE 44361.2.1 WA ROW & UTIL 44361.3.1 WA CONST. LOCATION: JACKSONVILLE - NC 53 (WESTERN BOULEVARD) AT SR 2714 (JACKSONVILLE PARKWAY) /GATEWAY DR. NORTH/S TYPE OF WORK: WIDENING, GRADING, DRAINAGE, PAVING, RESURFACING, AND SIGNALS WETLAND AND SURFACE WATER IMPACTS PERMIT SITE 2 \ SITE 1 BEGIN TIP PROJECT U-5789 -L- STA. 11 + 50.00 TO HENDERSON DID =__ _cz:- ---------------- NC 53 (WESTEj BEGIN CONSTRUCTION -Yl- STA 21 + 50.00 SITE 3 END TIP PROJECT U-5789 BEGIN CONSTRUCTION/-L- STA. 42 + 50.00 -Y2- STA 24 + 09-00 ,,1 n PRIVATE o I R PRIVATE DR. o I PRIVATE, DR. PRIVATE DR. �c N V z I NC 5 WESTERN BLVD I i Z - _ C 53-----------. Jl -- ---- -- N BLVD.) g aN I TO US PRIVATE DR. X LI O �PTOIlNWAY Z PI HAMPT WAY h'NIVAI L THIS IS NOT A CONTROL OF ACCESS PROJECT THIS PROJECT IS WITHIN THE JACKSONVILLE MUNICIPAL BOUNDARIES. CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD GRAPHIC SCALES 50 25 0 50 100 kill PLANS 50 25 0 50 100 k][11111 PROFILE (HORIZONTAL) 10 5 0 10 20 PROFILE (VERTICAL) DESIGN DATA ADT 2019 = 41500 ADT 2040 = 52000 DHV = 10 % D = 60 % T = 2 % V = 50 MPH * TTST 1% + DUAL 1% FUNC CLASS = MINOR URBAN ARTERIAL REGIONAL TIER r i y END CONSTRUCTION o g = -YA2- STA 13 + 43.80 END C NSTRUCTION s o 'F -Y- STA' .28 + 16.16 TO US 17 M VC 53 (WESTERN BLVD.) `n8 O 17 BUS. (N. MARINE BLVD.) EXISTING SIGNAL TO BE UPGRADED III MODIFIED{ EXISTING SIGNAL TO BE RETAINED Prepared for the North Carolina Department HYDRAULICS ENGINEER PROJECT LENGTH of Transportation in the Office of.- HOME OFFICE O 3722 SHIPYARD BOLLEVARD, S(J E RILMINGTON, NC 2M DAVEI\PORT 9JU51.M12 w.w.d—p—M.— NCBELS FIRM MCEME NO, G 25U LENGTH ROADWAY TIP PROJECT U-5789 = 1.147 MILES 2012 STANDARD SPECIFICATIONS LENGTH STRUCTURE TIP PROJECT U-5789 = 0.000 MILES RIGHT OF WAY DATE: DANIEL R. CUMBO, PE P.E.TOTAL PROJECT ENGINEER SIGNATURE. LENGTH OF TIP PROJECT U-5789 = 1.147 MILES NOVEMBER 9, 2017 ROADWAY DESIGN LETTING DATE: DAVIN B. WALLACE, PE ENGINEER PROJECT DESIGN ENGINEER SEPTEMBER 5, 2019 NCDOT CONTACT.- ERIC MURRAY DIVISION 3 CONTACT P.E. DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED Y� I '(0, I �8 I 409 / Lu BEGIN RESURFACING -L LT- STA. 11+00.00 _5789 0010-0009 I ` I I � I a21I � CITY OF JACKSONVILLE DB 1045 PC 63 ^ h I I / O 1 / 4 % / / f / 1 I I / S 3919'38" E I III 440.87' III\ I Y a09� � f MIN 1 - /0 0 E D.. C - / BURY Plh -ail PIPE OUTLET CHANNEL INVERT 1' ,N C r4FIP'RAP / 4, �, � ON �SA.NKS ONAILC�8 l0 .00 CITY OF JACK 'SONVILLE\"' N.. ��S W REP CE PIP�,x.� I III STA. +50.00 PROJECT REFERENCE NO. SHEET NO. U-5789 2 W SHEET NO. ROADWAY DESIGN I HYDRAULIC DESIGN ENGINEER ENGINEER 48 / DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED DAVE HOMEOFFlCEEOBICE 9iII SHIPYARD SOULEVRRD, SUITE LWLMINGTON, NC 2W 910191.8913 wxw.EevenlmHwaH.mm NCEEHRRMUCENSENO C-2 - 300° - - PERMIT DRAWING E�IFT aL�WAl LPE1F DETAIL JL SHEET / � ' N S y 4LL BU RY 24"G& = DI � N EIP- SHEET 2 uI 9 DB 4276 PG 335 AT wv MB 67 PG 74 36.02 R ACKSO VILLE R, LLC TOP 43.' INV=40.36' CF CRP. JACKSONVILLE INV=40.3864' 11, LLC DB -4276 PG 335 w MB.67. PC._74-. ?III=.. 3 al �Ilm m TOP=43.6T I INV=40.39' a.... L.. ....... . _ _ _. o - I v=39.06 _._ I BST Z� I TIP PROJECT U-5789 + Lj;RET.1'14 SDNRv �` TDP=33.49' I'LTINV=`� USTOP-41.INV 40.48`\INV=19.38' (YI)+0140 , SST )T STA. 11 00.00 NV=38.0 NV=38.02OP 43T11-L- StO.18+94.63= 9000 ryPCP ETAIN 36'HDPE - TOP=43.84' kso �5' i INV 40.53 5° RCP o$ J° CL B RIP RAP / TOP 425 ' R INv 4n Q C1+Y \ i - IN RETAIN TON- STONE 4.7 TOP=95.66'INV 36.23' _ 24" f;3_NOPF -- V - 26.' RETAIN TOP=33.37". � � SY GEOTEXTILE w v 1.38 n n s q� yy 32 4 INV=20.31 �, .4'\ .. .. .. / -1 . l,2 U Unk INV=26.34' - ^C` �S 1 U = i- = GFEF NwdY 'ASEMENT - - - - + INV=34.63' -T INV=35. �_ 24' RC -IV - -- _ -T- MTL GU RD RAIL f\ a IP 2/.3r -LT- Sta.18+94�53=1 ch - - INV=35.61'� -- -- A II P/ 29 R - - _ 9 - - - - YI St0 26+656 N ------- i Nv4zz7' _ � - ---- - _ - = - --- A � Piedmont Natural as Company Inc,nc, , iv � _-_ /0$00 NV=4717e' J AIR CO ------------ ----- -� N �I�INV=97.63' -L-LT INV=47.R' INV=47o42%-) :r h - T r o esr -L_LT- S 38'57' 7 E r / �__ --, J _ - -- -- - - - - - - _ --- -- -- �.86' : MEDIAN 'V' DITCH �j {6�-- TOP=45.23' -EL SEE DETAIL 1 d� - 3.53' i Ln - INV=43.05' - i DI Eli --- -- - ___�U W W -L-RT- REMO E AND --ll' y REMOVE E DI rz, rc -L-RT WN 1 - AIN PIPE RESET APPROX. F. _ _ TOUT �. RIOR 1 W �` "J�NSTALL--_ �- /�i --_-- W Ir^I 11 040 MEDIAN N'DITCH PROP��aU4°�b°iL N o G 24 ', PVC, Ci F of, Jacksonv SEE DETAIL 2 -eG RETAIN .63' JB wrMH SEE DETAIL 1 (TIE TO EXI$TINGjT, SPECIAL IT,ERAL 5/- ASE _ T P=4 R �_ _ / W INV 41.27' .> DITCH v✓/50 TON - - 0400 JB WMH IN - B 1 - T- T- - -T- 67 72' FOOTBRIDGE FLAG a m y `\ - INV 24.93Y{a 36" - - - EasEMEnrv' _ RI s '� �R AIN ONU Nw 040-04=47.09' 36 R6P _ _ ON 60'C� N 60"CONC-S 1 A T - 6.95' INV 37.00' 60'CONC,INNFF3 -3�!- + i / MONUMENT LL N .IS OLE y�[V r29' C& TOP-46.00 24 C&G 9B /L ! _- - - E - �4• fuf. F' _ .39} I I '7 �t�pra - - - C ` , y'%�'l�_IiS�✓± I INV-26.58' IN 2-. JI I p 2O'uTIL EASEMENT V 72'F007E ID - INV=27.83' 84 n n / INV ss4.11' INV-43.55' INV=3 Q Nv= 9.eaL- StO.18+87.41- Nv=za.6� M Nv 43.os T INV 25.�I'� T ROTECTI INV 44. ` I T 8. ZS a INV=43.61 a B ss' 16 , DIP, City fi Jac sonv111e EY. I y I / I I /CLASS 'B' RIP �":m INV 44.7-3Y- StO, /0-l{/1j,00 (pk05y I REMOVE PIPE S y %gVH TOP-31.64" DO DISTURB SEE DETAIL DP o II �/ e `moo BST s 2y, C& INV a d BEGIN RESURFACI _ N B6q' OO R�pGE�H LT - 24"G&G 24 C&G w �T�.� y X Aa �- Ili -L-RT-STA.11+0� J -ocoNc r 200'TAPER \ I ' I I \���----�� cac DUAL RIGHT TURN LAzF �`Vdj; WESTERN PARKWAY, _LC- _._._25-alc-aus -. 9' ... �'. -- -. _oz OMB 66 PG 62 ...._ _...... .I �' _ IN ..B-3160-PG-860,_._....... _.N.. I a, I UL_ _._ _._._._. _._. ............... / \ I 11 I � � I _ z � � � � � � I � I ICJ lo� � I , IS BK/MASONARY m I __ uQ� NV=44.46--CONC� L N' 11� I � I� B� BUS ICI DETAIL 1 DETAIL 3 m oD' S _ MOJACK, LLC MEDIAN V DITCH SPECIAL LATERAL 'V' DITCH .yS �' QI III I �, I - IN°„° s�m.I IN°„° xnlel ESTERN PARK,LLC L_RT- Sto.18+90,82 I �+ I I MB 63 PG 97 66 P� 2 - -Y- StO.10+34✓7 o n I II 1 II OB 3713 PG 317 Iw or I r? n _ Point , P°in, I y 1_ I I C II I IS BK/MASONARY FVOj"e l Fv' e� a e� e 3.A Ey dt e, siaNDRI P. O ' �, �, I BUS o I l I I 8 RETENTION POND FROM STA. 13+18 TO STA.17+00 -L- MED Mi^. D=1 Ff. FROM STA. 20+50 TO STA. 24+93.50 -L- MED FROM STA. 11+20 TO STA. 13+00 -Y- RT o I I DETAIL 2 DETAIL 6 DETAIL 8 cac III0 11 �� LEGEND' SPECIAL LATERAL BASE DITCH - �,,o. (N°„° ECT IN- s°alel /~ I II STREAM OR BODY OF WATER (WET) TOE PROTECTION PIPE OUTLET CHANNEL -II No,ro s alel \ SPECIAL LATERAL V' DITCH J �I. = O oo (PJD ON FILE VM7) R + 7 Natuml \ Fill N00. Flu Grouni \wz '%"---��n� _ -�' �� - cr,°aa ?y 3 ``< sl°P= NATURAL 1. BLaPE � T % Y- STA. _ �J WETLAND BOUNDARY (WET) d D F`°7`e F`p ,, •" ^ SEE SHE (PJD ON FILE 1/3/17) GROUND a LINE B GEa,ExaLETCH T S DENOTES TEMPORARY IMPACTS 0 DENOTES MECHANIZED CLEARING Min. D = 2 Ft. d= 1.0 Ft. CHANNEL BED Max. d=2.5 Ft. Length=25 Ff. r°n°m°7 IN SURFACE WATER Max d = 2 Ft. S S DENOTES IMPACTS IN F F DENOTES FILL IN WETLAND Type of Liner= Class'I' Rip -Rap B=5 Ft. Type of Liner= CI. T Ri STA. E+48 TONS Est.=30 Tons of Class T Rip -Rap FROM STA. 14+00 TO STA. 14+25 -L- RT FROM STA.14+25 TO s7a 1s+as -L- RT STA. 24+39 -Yl- RT SURFACE WATER E E DENOTES EXCAVATION IN WETLAND ODD' m PROJECT REFERENCE NO. SHEET NO. U-5789 3 BEGIN CO �TRU TIONI RAY SHEET NO. BEGIN RES - ING ROADWAY DESIGN HYDRAULIC DESIGN ��;Yl $TA. +51 ENGINEER ENGINEER CITY OF JACKSONVILLE I I DB 1045 PC 63 6. y� 04 (D � ��� "' 0409�` ,! -Yl- PRC Sto.22 +20.48 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED F s� � '/Yl- PT Sto.23+60.71 DAVEI\PORT HOME OFHOE 3M SHIPYARD EOIILEVARD, SUITE on/ 1 I LMMINGTON, NC 2SW9 \ I • r L i' / 9It.151.11 wxwdevmpoHwaB.mm • ( + I I I -' --- - NCEEISRRMUCENSEMOC-2 (Y/) +90.00� - - - - - 440.87' -- iy T X SL r } N EIAZ! - _ lYU +90.00 � _ PERMIT 409 / / (oil)' PDE 12 70. RETA I IT /ALLPE I ETAIL SHEET /N S DRAWING �- _ ID Y v D D ,M e� r// + MIN TB 2 I_A yBUR� PN INVERT ,' , EIP SHEET 3 OF 9 LL `\ _ \ IO 0 EP - 1 `1 P^ 2a" cos DB 4276 PG 335 BURY PIS 28 BST _� MB 67 PC 74 -`� PIPE OUTLET CHANNEL INVERT 1' PD = CROSS rLCCE55 EnSEm�F INV 3�.021 RP VILLE II, LLC / a % _� CRC JACKSONVILLE q w / �,� ON NKS ON o 1 I � - �0.00 � I � INV 40.36' CF �, DI AND �- Y iNV 40.38' ._.-I'j 00 1h / \ - \ , LLC TOP-43.67' F JACKSONVILLE � z N Y 0 _ EMOVE DB, 4276 PG 335 BEGIN RESURFACING -� -L LT- STA. 11 +00.00 s JS C17 z Q \ w 1 m "° 4o'3e' v=39.o6 y '. d#1�0 PC€\\ 06 LF I`I MB fi7$74-.-.� P �I� -/ _�-- . S..- 4 SITE 1 - �,S r W o _ 6" RCP slim Bs 3 EMOVE REP CE PIP�,w� o B ` o `1 r mar•' _ ` IS MASONARY "" N '\ 1 �C INV- \ I - - - I ` i I V 36.54'1 `^ INV 4 ��LT INV TIP PROJECT U-5789 90,00/.40 m I4 ¢ _ s ` - BUS �ii ' CGL{N r I \ ( RETAIN A �� INV 3�.dk2' ,NV48 T l P 4 �S I,, \ 4 I L- Sta. 18+94.63= P� / @ETAIN i36' HDPE S" P TOP 4J.B4' )T $Tl�.,1l + 00.00 ' ' ' I t0.27+ 1 6 CL B RIP RAP p INv n Y Q �� e�si1 ` i6 - RETAIN O _ _ _ 4� TONG STONE 44 7S' , �TUR 45:66' NppS �'-iNV=35.�3 u4u_a _ V _� 2a° 0 -ri RETAIN I SY GEOTEXTILE w n n , q5 �V��,- '�'t+'-'+ 1... - I` P4lBL C�yTRFL 8' - - - LS - O ' - pY£nSFFExIT _-FxrsnNc R/w _ G -- �s A - e r + _ s _ _ 413 _24"RC-IV _ __ 4�jc3 _ Y_- - --_ __ _ o.,y& wzizr _ �4 Rc - a+8 cn cV _f - - _ - - _ - - - - _ _ - -YI L Sto.26 65.66 - -- ' l � � - - `°-- -- -- -- --- - , -.-- --- ----�T� - - - �° _ Pdcrhae cJl � I --------- - >�L - - - - -Nv=47hB J_ -� - T . �- - - -- - -- _ - - ----- ----- -- - --- --- _ - - - N --- -L-LT- Nv=47.5V INvz4?2Y-, _, Jj -L_LT S 38.57' 7 E r / `_ _ _ _ _ _ _ r -- ---_"r--- 2.86' _... __ - _.-- MEDIAd 'V'DITCH_---_-� ___ 4_____ __ ____ t5 � _ -_ -T - ___ _ _ _ _ _-\i r`>Ln ii -- IOP=4E.?3-_ -EL - _a_- - DETAIL 1 -- __ __ - - - - - __ - __ -- - - - _ _ INV=43.L 7 s -� -i - - DI _-._ -_ _ '-_ _ _ _-- SEE-_- - -- eoNc -L- S 38-57'3 .6 __ - - _ -_ -- --------- - -_i L �i Ir--- _ -�> - w -- �\ -L-RT- REMO E AND _ - -_ _ - J -- REMOVE E DI ill - _ -- ,P ° RESET APPROX. I� - E �. WN AJN PIPE � - RIOR -.-_'' - - - -- 1 _ LLI EAN OUT -..TS%JB�IJSTAR- __- --_ _. -_ �I II �i _ _ _ _-__.---_-___- -- LU _ 1 w 040 MEDIAN N' DITCH PROP. GUAkDkAiL _. - -- - o r � N (TIE TO EXISTING) SPECIAL LATERAL S+.-, +l CAT-1 -- - -- - _ -- -�y / �� - _-_ __ DETAIL _-_- W TON RIPRAu- 0400 1B v4MH - RETAIN - 04 4 \ 3 1 f'- _ _ _ _ _ S _ _ O .wM SEE DE --°a _� 24 ', P J'i Cl I - of aC - SEE DETAILI 36" , 36+' fi6P� _ CfF RET - _- _ •- __ __ _ _ _ 6 ' / JB H Y Y, 5% Jr - It S-4 � - - �R AI 67' iw -- ___ 6P CON - - - 60" - - E95' - Mtl`37.00' b0'CYINC INNFBYP - _-F- 040 �r _47. 9 J TOP T bG _ CONB ,' FXISTIN(; R/ �' EA'sEMEary _ I �_ _ '. _ _- II _ _ ` 44 _ I qCE 24• rl r. I - � - z0' a IL EASEMENT u V Irz4• ca TOP-46.o0 24 cacI ! T - INv z�.F `� _INv-� - - 1 NV 'Pr I I INv IN'- P- n� 44.11 - TOP-4 \ 1 I % I ,IN -. m \ '.DIR,IC't OT R�IO ,Y- I TOY"PROTECTI � 11NV 44° 7 - _ VE '_ iS iS ss TNV=43.05' T-_INV-4\3.6f INV= g B ss 1 I Y - i ry - S O. I 0405 I REMOVE PIPE J ; I L ���yyy[[[ REMO 3 _ 1 I 1 CLASS TAIL IINtl 44.7-3� f •/Q-/-( j�� 1 SEE DETAIL040 BST Ted=3L64^ DO NOT DISTURB aQ � ` � INV > t ?4 &D 24' C&D - P n `To- �' FOOT BRIDGE OF BEGIN RESURFACI \o �� \ - --- -- --', -L_RT- STA. 11 200 TAPER \ - -��cKc 3 I / DUAL RIGHT TURN LAN t5�� PG 62- �� - !25-sK_aus------- /n¢�- '.. -.-1. _. - OB 316 P 880 m / R4 P RKWAY tj-C ��� �➢ I ) w�� Bsr Is 11/MA10NA11 m qq,,rr BUS NV�44.46�--"ICI DETAIL 1 DETAIL 3 i l� ; Iyl 1° co c oDL, MEDIAN V DITCH SPECIAL LATERAL'V' DITCH I �' I MOJACK, LLC I Na„a semel INmm sealel TERN PARK YLLC yL_RT- Sto.18+90,82 �. I fi I %_ MB 63PG 97 Iw r Poim a Pomr I �, MM� 66 P� 2 -Y- Sto.10+34✓7 o n m1 1 I OB 3713 PG 317 , m I I a_ t11 5 5 N.-I \° rill NDRI IS BK/MASONARY _ lO_�y A Ground°Ao E\fie, SbPe ' ]y 'Y r BUS T I 4 I I I I is I O FROM STA. 13+18 TO STA. 17+00 -L- MED Min. D=1 Ft. I J I w w� I-z I �u I FROM STA. 20+50 TO STA. 24+93.50 -L- MED FROM STA. 11+20 TO STA.13+00 -Y- RT �' DETAIL 2 �� C II Q LEGEND: DETAIL 8 � -� �� I DETAIL 6 - a e SPECIAL LATERAL BASE DITCH TOE PROTECTION PIPE OUTLET CHANNEL STREAM OR BODY OF WATER WET ( No, ro Scale) ( Na„a Smle 'I II �I (WET) Na1ta seal•I ��� SPECIAL LATERAL v' DITCH I�I o l (PJD ON FILE 1/317) Nataml \ rnl �di�� Mu d"-mow, ,o'i-- �� SEE DETAIL 3 I• _ 13 + / 0.0� craaaa 2.v D F\ a< slope NATMRALs.PE`TCHLJNE Y- STA. WETLAND BOUNDARY (WET) d GROUNDSEE SHEET 7 (PJD ON FILE 1/3/17) Gea,ex,il° B GE-E DENOTES MECHANIZED CLEARING Min. D=2 Ft. d= 1.0 Ft. Length=25 Ft. CHANNEL BED T S DENOTES SURFACE WATER A TEMPORARY IMPACTS 0 Max. Ft. Ft. Max d = 2 Ft. F F DENOTES FILL IN WETLAND Type of Liner= Class T Rip -Rap B=5 Ft. Type of Liner= CI.'B' Rip -Rap EST.60 TONS Est-30 Tons of Class T Rip -Rap S S DENOTES IMPACTS IN FROM STA. 14+00 TO STA. 14+25 -L- RT FROM STA. 14+25 TO STA. 15+48 -L- RT STA. 24+39 -Yl- RT SURFACE WATER E E DENOTES EXCAVATION IN WETLAND CITY OF JACKSONVILLE DB 1045 PC 63 Oi / /"c�Yl- STA. +50.00 �r o ,o. ri PROJECT REFERENCE NO. SHEET NO. U-5789 4 w SHEET NO. ROADWAY DESIGN I HYDRAULIC DESIGN ENGINEER ENGINEER / �� -rl- Q.4t4 DOCUMENT NOT CONSIDERED FINAL PRC .StO. -: U / / / UNLESS ALL SIGNATURES COMPLETED F F -rl- Pr sto. 23+60it _ DAVEl�PORT / , HOME ORICE slazsxlILMINGTON Evnxo.sunEE / F / I IIII LMMNc1oHf1C1p / I I sl NOBE lz wxCENSEnNHC-2 I / 1 (Y11+90.00 xa sOBMucEHSE xo.cus - 5 39°I9'38" E 440.87' X T X ST "0NPERMIT DRAWING /+90.00=j PDE RETA IFi aL�WAl LPE1F DETAJL SHEET / TB 2 I_A yBURY �aN- T TIP, SHEET 4 OF 9 Y \ IO 0 I W \\ BURY PIPE 6�0> 6" CP III 2428'BST DMB 6B 42 7 PC 4PC 35 INVERT 1' --'CROSS tLCCE55 EASEMENT INV 36.02I CRP VILLE II, LLC 1'4PIPE OUTLET CHANNEL I pp a yVrL ,KS R oz 0.004s. � I CF I If 4, 4, � ON S NKSTAIL 8 \ I I M I TOP-43.64' INV=40.36' 5 + nn II // + INV 40.38' �-- >y l Jll '%' � 3J. DI AND CRP JACKSONVILLE BEGIN RESURFACING �� y j-�/' \ �> III= E L LLC w m TOP 43.67' v=39.06 CITY OF JACK SONVILLE-- �' 41 \ - w EMOVE DB 4276 PC 335 -L LT- STA. 11 + 00.00\ 06 LF M6 6z PG -74 - - . o .. l 1. u5789 0010-0009 w s�- ,y s . o- tJT z o _ I N m. ti 6" RCP / .' _ _ 3 al �Ilm es u RE VE AND -DIVE � � 41 0 �M(JJ I /_ ___ REPLACE PIP�,x.� I N B ally \ l41 INV--- TIP PROJECT 1 1_C �O(] t� i S TOP=33.49' \e M/ I I III IIII _ MASONARYI'V-36.54' INV 40.43 C�11 �T LT INV3 r PROJECT C V 5 v 7 ss� _ pNv=I9.3e' (( 100 1.40 I 4 1 TOP 1. Q441f Nv 4o.4s' )T STA. 11 00.00 _ _ RETAIN NV-38 0 NV-38.02' _ I �, \ �, -L- Sto.18+94.63= / aj/ IN 36 HDPE INNV 40.53� C TOP=43.8L PVC. CItY 0�-_- 26.f; + / 6 CL B RIP RAP h,� i INV 36.23, RE NINu aQ."iL 1 = 24. 8 _fss- �' RETAIN 7�iON-STONE TO 44.78' P TOP=95.6b' OpF -- V 5 3' RETAIN TOP 33.37 \ o SY GEOTEXTILE w v L38' n n q� �- - INV 20.31 w P e c TRA a - - - .. __��- JlilV896-u L Pa INV-26.34' � '�'\� _ .. -�C� li - = i _ �dY�'ASEMENT^o � -- - E - -� F a - INV=34.63' -T Fo- - 24" RC -IV - -- _ _T- 2/ 8.3r -L_LT- Sta.18+94�53=1 ch _ INV=35.61 �'ll 'p Piedmont Natural Gas Company Inc, 8 ", PLASTIC A C a ej IATL cu Ro RAIL R �� -YI- Sto.26+65.6 1 PI N y m NIINV .. _ _ _ - - 4 - I1 - - - -- 4 7.2 7' - _ - T - - - - 6 L - _ - -T--------- -G- - -- GI C-_--- ---- _-_ l0$BD It- INV=47: Li,,nti nt JI -------- ----- -L-LT- INV=47.5v INV=47.AA2'YZa _ C =� r h - r O esr -L_LT- S 38'57' 7 E r MEDIAN TTIE ITCH TOP=45.23' -EL ;SEE DETAIL 1Ln INv=43.05' DI cONc -L- S 38 57' 3 .6x E W - - -- -- --- -- - _-----+�8----- ���a Emil W REMOVE AND zi, y REMOVE E DI rz, - wN - AIN PIPE RESET APPROX. _ _ RIOR 1 W "J�NSTAll--_ �- /�i --_-- W Ir^I I, 040 MEDIAN'V'DITCH PROP��aU4°��°iL N a �, 24 ', PVC, Ci F of; Jacksonvl SEE DETAIL 2 -e C RETAIN _ 6 �. v_ 514. INV-3 .63' JB wrMH SEE DETAIL 1 �� \ (TIE TO EXI$TINGjT, SPECIAL IT,ERAL 5/- ASE - T P-4 R �_ _ / W INV 41.27' .> DITCH Y✓750 TON - - 0400 JB WMH IN - T- T- - -T- 72' FOOTBRIDGE PLAG a ro _ y ` INV 24.93Y{a 36" _ - - 3 E Irv' _ RET s � �R AIN O67 �w 040-0F=47.09' 60'CONC� N SO, CONC i -S '- T - 6.95 INV 37.00' 60'CONC,INNF =3�! - - - + i MONUMENT LL N .I5 J OLE - - 9g - 1 _- - - - - A 2a• faf. .39 r Illvv ll- a�p 2a'uTIL EASEMENT C V -' �',?1 r29'C& TOP=46.00' - -- �E INV=27.83' INV=28.6 541I n n I 77 / INV ss4.11' �S�Pra INV-43.55' TOP=4 INV=26.58' INV 25 JI - I P r Poo7eR1D Nv= 4.BaL- St1.18+87.41= 5 14 Nv=43.os' 7 INv=3 INV 25.�I'� ` INV=43.61 T ROTECTI INV 44. I T 8. �y ZS a B ss 16 ,DIP, City fi Jac sonvllle ,85r 4 I I /CLASS 'B' ,StO, to+L/U,00 I REMOVE PIPE S y%gVH TOP-31.64' DO DISTURB SEE DETAIL DP o II \\��J// s 29, C& INV J d a BEGIN RESURFACI N -4 �' oo E�H LT 24"CAD 24 P&G 1 w .� y X 4a �- -L-RT- STA. 11+0� J-o1CONc M / 200'TAPER i `V WESTERN PARKWAY, LLC J \ 11 IJ � oz , w l oQ w aQ r -as sx aus II Y . jz 1 ✓ DUAL RIGHT URN LA _oz DBB316C PC 62 -- _ I _........ .... ... m' IS BK/MASONARY 'Y 'Y Nv=44.96-- BUS DETAIL 1 DETAIL 3 coNc m aG m �� MOJACK, LLC MEDIAN V DITCH I I �' I I I SPECIAL LATERAL 'V' DITCH .yam �' QI III I �,- INe„e s�m.I INmm s�alal WESTERN PARK Y, LLC I -L-RT- Sto.l8+90,82 I �+ I I I I MB 63 PG 97 sna,lae, sna�lae. I _ Point , Poin, I N O 1 11 1 66P 2 I I D83713PG317 -Y- Sto.10+34J7 I I I I O NDR I Is El/W11NARI II a I I c IL ju I I I FVOj"el FVO e� a e� a 3.A Eye, Fill ' �, 4, I Bus �, cO 8 RETENTION POND (_ FROM STA. 13+18 TO STA.17+00 -L- MED Min. D=1 Ff. �' I 41 I J U I w \ FROM STA. 20+50 TO STA. 24+93.50 -L- MED i I I y m NI I C I I I I \ FROM STA. 11+20 TO STA. 13+00 -Y- RT o I \ I DETAIL 2 DETAIL 6 DETAIL 8 cn c III 0 11 �� LEGEND: SPECIAL LATERAL BASE DITCH - -- J �,,o. I \ (Nu„c ECT IN- s�alel /~ I II STREAM OR BODY OF WATER (WET) TOE PROTECTION PIPE OUTLET CHANNEL I No,ro sEalel \ SPECIAL LATERAL 'V'DITCH IJ O 00 (PJD ON FILE VM7) N.-I Q- SEE DETAIL 3 ------ - -}- 7 _ Pf11mow, --�a - 13 - c.=aa 2.y ', °`< slop, NATMwL 1. SLOPE e 1(_ STA. WETLAND BOUNDARY (WET) d D Fie �� "�," " LINE SEE SHEET 7 f____, (pJD ON FILE U3/17) G0.0UN0 d _ Geo,� i1e B GEa,E E MgTCI I DENOTES MECHANIZED CLEARING Min. D=2 Ft. d= 1.0 Ft. Length=25 Ff. CHANNEL T S DENOTES RFACE`TEMPORARY IMPACTS 0 Max. d=2.5 Ft. Max d = 2 Ft. F F DENOTES FILL IN WETLAND Type of Liner= Class'I' Rip -Rap B=5 Ft. Type of Liner= CI.'B' Rip -Rap EST.60 TONS Est.=30 Tons of Class T Rip -Rap $ $ DENOTES IMPACTS IN FROM STA. 14+00 TO STA. 14+25 -L- RT FROM STA. 14+25 TO STA. 15+48 -L- RT STA. 24+39 -Yl- RT SURFACE WATER E E DENOTES EXCAVATION IN WETLAND ODD' m PROJECT REFERENCE NO. SHEET NO. U-5789 5 BEGIN CIO fi U TIONI RAY SHEET NO. BEGIN RESU ING ROADWAY DESIGN HYDRAULIC DESIGN F Y _ � �­yi STA. +,51 ENGINEER ENGINEER 3� CITY OF JACKSONVILLE !O DB 1045 PC 63 -Yl- PRC Sto. 22+20.48 DOCUMENT NOT CONSIDERED FINAL co UNLESS ALL SIGNATURES COMPLETED 22� * F ' �' % -Yi- RT Sto. 23+60.71 DAVEl\PORT / F� - F HOME OFHOE i t 111 - - F srazexlILM NGTOULwnso.suOEE MLMIHc1OH, Mcseas i �I sla.zssslz mx.ee�NmmlB.mm A --' NCEEIB RRMMOENBEMO.62512 -- •� 44o.ar - I Fxl r x v� N Ecez! � rru +eo.00 � _ 12 -3° - 'N3 PERMIT DRAWING \ > r I PDE RETA I LL DETAIL'SHEET / l - YD+ MILV�� j TB - M I' IP, SHEET 5 OF 9 BURY #INVERT 1', 0 �I/pE C N 0„-1-_-___--ter-�� _ 2a" 8' EI r DB 4276 PG 335 INVERT P 6 6 ' "055 B �E55/cASEMErvA -r MB 67 PC 74 \\ PIPE �NLC,LrTLEr Cf� Al I. I I III ry +45. � RP VILLE II, LLC / 1 \� RAC�p' _ _-4000 INN 3 �.02 $' PDO. CF ON NKS ON INN=40.36' a F-R TOP-43.64' , I + ,! - DI AND SCRIP JACKSONVILLE j}, INv 40.38' BEGIN RESURFACING �� .00 �y \ E LLC m OP 43.6T / F JACKSONVILLE �' 'y \ _ EMOVE DB,4276 PG 335 wl r INv 40.39' v=39.o6 -L LT- STA. 11+00.00 M - -�r -' _.. `' CITY Od#PG-t;6S\\ 6'`.. t 06 LF MB_6T--PCe_-74-.-.a �o ih 1 41 6" RCP RE VE AND / I' - EMOVE Z1� -"'� B r m 1 ffrry� _ \ I/S�� 41 �' REPI'ACE PIPER, III 9 �� ) �ee \ -.-.. l 0 S �a,M- , , _ - - - - \ s, asoNARv s° _mac NV - TIP PROJECT U-5789 _ �� ��T� _ �� °�-��I 4 �� RETAIN (¢- .o��� �N�3�. - '- �° �T N�3 q V 36.54'I `^� INN 40.g3 �.L - - lYD +0/.40 I 1 4� r ,uNv b 4s' �T $TA,.11 �Q-, 0� - o lu L _ StO. �8+94.63= I q_ , - _ .- gGe / @ETAIN 36' HDPE TOP 43T3 - OP 4 .$4' - �,-L- Ste+ L B RIP BUS P 4 I�N� a 0.53 "_,P I f - �y CF�s���. I "•'s }H �/ .RETAIN - RETAIN TON- I\ C ` fD. 27'f t 6 SY -STONE 44.48' V 'r ��FOR d5.66' T NOP �"-INV�35.23' _sNu=a - V 24° O - _c i -. - - OTEXTILE L,n+. T D_ SI;-eLc TRAILL�I' f FX4�T4V( 61,dW� -FXISTINR R/W _ _ �S F_iecltt a-� _ _ + - _ ass ., _ -¢, _ 4l3 24' RC -IV __ ___ 453 _ r__ - - - a m �1 l 4 Rc W _ - -+8 N - = - - =�8' --- -_-YIL Sto-26 65b6 __ F_8 32 \`+INV=47.63' _L_LT_ INN=47.51' INN47�42' -] `_] ] r - T°--L_LT- S 38.57' 7 E r h _�� --- --- _"r--- �.g6' - MEDIAd 'V' DITCH_ _ ' _ __ _ __ _ _ t5�� _ _ _ _ _ - J _ - - - _ I0P-45.?3=- -EL _o '-SEE DETAIL -_ o� - _ __ - _ _ _ _ _ __ __ _ __ _- _ _ _ _.._ _ _ - - ---_ _ _- _ 3 $ INN=43.L1"i, ---- - __. o - --___ - _- _---____- _ _ _ _ __- --- DI - __ -- __ - - - - _ __ L _ - __ - - - eoNC -L- S 38'5T-3 6" _- _ <. aG - _ -_ -- ----- --------- - - "_ - -�> - ��--�DT�T�-- Lc� Lu-- - - -- _ - - - - - -_INN 43.73' ; 6 _ _-- ___"- LLI - - - -_ >; \\ -L-RT - REMO E AND _" __ * REMOVE E DI I C N -- - ,P RESET APPROX. I� - - � - ---- I �. E _ wN �N PIPEOUT " _.-IR -.__'_ _ I C .- - Y - 7 AN Uj I1J - - �i-f_- ♦�.,_..:+., .. y....:, --.;,,..Ii% _ _ II w 040 - _ MEDIAN 'V'DITCH PROP. GUA�t6kXIL _ o - -- to - ,\ -- (TIE TO EXISTING) SPECIAL LATERAL 5+. +l CAT-1 --- - - - -- RSA �g v - J- / �� - - - -- '.DETAIL 1 TON RIP&kP�'rt ... 0400 1B v4MH IN •. 04 4NV 3 3 I 3- _ _ - _ _ _ - - - S _ _Lu 24 P � Ci lY, of, aC SEE DETAIL Z 36+'R6P� _ 4c oC. �- _FRET - vvh1H SEE DETAIL _ z �`' �3T FAO �iID6ET _=q 5 IJ- 36 - -- #-- _ - R AIN .67'JB ' �I 60 - m 60"CONE FXl-STING R/W o - - E9S - Mtl-37.00' SO"CY19C INNFC4TN� - 24 P _ , MOHUMEnt 040 _ _ _ _ _ TOP_47,1 9 J - - - - - - - • - - - +� - - - __ - ___ T e� - _ - �4• cur. • I - = � ;_ - - za-urn EASENEHT ' E _ - ' IIIJr INN 2y.58' ' INN ' ^ r r " INN 2T,F _ ss4.11- \ I' I- s _ - T6P-4 Gam. lwitttfiT- _ s �' zt ROOT RIO ,� - ", INN 4.88E Sto. t8+87.4�- INN-'.- REMOVE - I '- I: ii iS I I INN=43.0 - INTJ=43,bY, INN' `° TOE'PROTECTI 11NV 44. 7.45. T INN=3 I I T!)P 1 ..\ g B ss I�' I I DIR Clty f �, i CLASS 'B' RIP Il�tl 44.- ,SfO, �0 (jT�� 0405 I REMOVE PIPE - 4S•R%gXH 1 I L SEE DETAIL i + (34400.1I�, - BST \ ' OA Tod 3C64^ DO NOT DISTURB - s 2q•C` \ � INN FOOT BRIDGE ��I BEGIN TA.RESURFACI 24 cac 4 cac / m i WESTERN PARKWAY, C N -L RT- STA. 11 +00 0 aco e- r, 200' TAPER F 1 -T w I DUAL RIGHT TURN LAN S, -- �____ __ r - 41 OB 316 P 880 60�G-62 ,Icc,,ssrr� n I �U BST IIQ IS BK/MASONARY I �, p�NV�44.46�-- o. I`Y' ( �W I� I BUS DETAIL 1 DETAIL 3 i!�I�� �y I, CONC 1I/^ ` I I MOJACK, LLC MEDIAN V DITCH SPECIAL LATERAL 'V' DITCH I IC I I I Ne„e semel INmm sAolel iw STERN PARK YLLC L_RT- Sto.18+90.82 a- I �' I I MB 63PG 97 MM� 66 P 2 -Y- StO. /0+34✓7 0 11 InIl ill 1 I '� DB 373 PG 37 o ` m I a I'1 5 5 I FXo/%s.' FVO oc No,uml \° Fill NDRI IS BK/MASONARY _ A , , Ground `!'I el D E\oKe, SbPe ' �. 4' BUS O FROM STA.13+18 TO STA.17+00 -L- MED Min. D=1 Ft. �' I r I w w I V F FROM STA. 20+50 TO STA. 24+93.50 -L- MED I r I I I \ Io FROM STA. 11+20 TO STA. 13+00 -Y- RT � oI III - ' Q LEGEND: DETAIL 2 DETAIL 8 ca c - DETAIL 6 SPECIAL LATERAL BASE DITCH TOE PROTECTION PIPE OUTLET CHANNEL I I, " I STREAM OR BODY OF WATER WET I No, ro Scale) ( Nu„a Smle II �I (WET) I INe,ro sealel � ��� SPECIAL LATERAL v' DIreH � � � o -1 (PJD ON FILE 1/3i17) NmPmI V FnI NO�p Mu d--"-mow, ,o'i-- A SEE DETAIL 3 I• _ 13 + / 0.00 croPaa 2.T D F\ e< SIePe NATM�,� Fes' N`OPE "'°>t�'."* d TCHL)NE Y- STA. r� WETLAND BOUNDARY (WET) d GROUND d SEE SHEET 7 f_--_! (PJD ON FILE 1/3/17) Gec,ex,ile B GEDTExaLE ; DENOTES MECHANIZED CLEARING Min. D=2 Ft. d= 1.0 Ft. Length=25 Ft. CHANNEL IBED T S DENOTES SURFACE WATER IMPACTS 0 Max. d=2.5 Ft. Max d=2 Ft. F F DENOTES FILL IN WETLAND Type of Liner= Class 'I' Rip -Rap B=5 Ft. Type of Liner= CI.'B' Rip -Rap EST.60 TONS Est.=30 Tons of Class'(' Rip -Rap S S DENOTES IMPACTS IN FROM STA.14+00 TO STA.14+25 -L- RT FROM STA. TO STA. is+as -L- RT STA. 24+39 -Y1- RT SURFACE WATER E E DENOTES EXCAVATION IN WETLAND a / Air air i is CITY OF JACKSONVILLE j') I I ( -190 00 DB 1045 PC 63! ��� 00 I > 12 e (Y/) _41 7 1 0. 4 0411 1 E r1312 ,; T / I I7III rYn 30.L / I �r S 39°I9'38" E 440.87' I P X1 51' r /.'m- STA. +50.00 o/ 'fir ° / alv-- � / o c/ ri ti PROJECT REFERENCE NO. SHEET NO. U-5789 6 RW SHEET NO. ROADWAY DESIGN I HYDRAULIC DESIGN ENGINEER ENGINEER -YI- PRC Sta. 0.48 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED PT Sto.23+60,71 DAVEl'sPORT 9iII SHIPYARD EOULEVARD, SUITE ® HOME OFHCE LNLMINGTNGiON, NC20103 914]5-2 wxw.Ae poHwaH 5 _ -- `�'- 1 000 NCEEHRRMUCENSENO C-2 II w III E41L TA 11�`�HEET N3 PERMIT DRAWING - = r 409 SHEET 6 OF 9 W ems' y + TB � Ei v alv T EIP , �� M 1 /0 G �) -_-- - �-� BURY PIPE ) 6 0> 0" 6° 2 BST ---- D MB 76PC 335 PC / \ .. .. I / (Y) f45, PIPE OUTLET CHANNEL' INVERT 1' I oo� d W S' CROSS CESS+4EASEMENT INV 36.021 CR ACKSO VILLE II, LLC KS �P-0,00 ICF ONON NV=40.36' J`.-°/ .i1' -i' SEA -RETAIL 8 .�, \ I I TOP 43.64' �JS� III + DI AND CRP JACKSONVILLE INv 40.38' II, LLC o I TOP-43.67' BEGIN RESURFACING -is- --VI\ILL oz w EMovE E DB 4276 PG 335 w w 40.39' v=39.06 -L LT- STA. 11+00.00 Us7e9 0010-0009 w �s 4 LPG s G' C7 06 LF MB 6z PG-74- - ?=. _ _ �aa� ti m.. - SITE 3 j 6" RCP Jal gIlm - Z �B -�' REhM�(JVE AND41 EMOVE I A,� I REPLACE PIP�,•� I N B TIP PROJECT U-v% I v 7 t TOP=33.49' MASONARY III 6.54' NV 40.43 C�II NV 3 1\ `O I 4 BUS TOP-41.9Q441f INV 40.48` ss� _ \INV=19.38' (YI)+OI 40 I I SST )T STA. �� 00.00 _iF - RETAIN NV=38.0 NV=38.02' NVm43T� - k5v �' 9 _ 9000 �, �S, pG 36 HDPE INV 40.53 5°RCP T0P=43'84' 04 J° • \ CL B RIP RAP / TOP 425 ' RETAIN INv 4n = Q C1+Y 8++4� 6 i INV 36.23' 24" 6. -\ IN RETAIN L 7iOW STONE - TO 44.78' W TOP=45.6b' NOPF StO.I �I RETAIN TOP 33.37' \ o SY GEOTEXTILE w V 1.38' n n -. .. y-32 4 INv 20.31 �, \ w Llnk INV-26.34' _ - - -. - - ^C� \S 1 - = i _dY'ASEMENT IP Q zun_ - - 24" RC -IV _ _ - - -- .. INV 34.63' -T F 2/, INV=35. _ - _ -T- INv-35.6r�1 ^ a c/ P 4 ac 0 a.3z' -L-LT- StO.18+94�53 N ---------- INv47.27' / - - . v m - - - ahy MTL cu RD RAIL I � YI St0 26+65.6 I A � Piedmont Naturcl Gas Com any Inc, 8 ,PLASTIC - - - - - �I _ _ I I' I _ _ C I r AIR CO PER --- - - - - - - - ----- `_ +INv=47.63' -L-LT INv=47.k' INv=`1 A42'Y-O o Bsr -L-LT - S 38' 57' 7 E r _ _ = J _ - -- -- ----- - - _ - -- -- �.86' : MEDIAN 'V' DITCH >` ^ -- TOP=45.23' _EL SEE DETAIL 1 dI - INV=43.05' - i DI CONC -L- S 38' 57' 3 .6" E _ -- -- --- -------- sop - mINv-43:73' --- lir W x II I -L RT- REMO E AND - y REMOVE E DI �z, RESET APPROX. - --- WN - RETAIN PE �. RIOR I W - - _ I�-cif- - "J�NSTAR �I 3 � _- W \ I' \ 040 MEDIAN N' DITCH PROP��aU,4°���°iL AI � � � N �IA H ETAIN , v_S4..JB wiMH SEE DETAIL 1W(TIE TO EXISTIN SSE OT P=4 • R _INV 41.27' o D0400 72•FoOTBRIDGE 24 PVC, Ci y of; Jacksonville '36' - -- �--� -RET '� R AIN 67' Z 60"C3 it 7 040 i. IL i ---- -- EN A / LL TNP 4i.159 J F3FLA� r � uonuu T FLAG 9e' ..� -- - - �4• fuf. E _ - .39} I I qp 20'UTIL EASEMENT C V yyVl IiQS✓,j3 r24' C& TOP 26.00' 24 C&G : /Ly, - E INV-27.83' INV=28.6 / INV is .11' P INV 43.55' TOP-4 INV=26.58' INV 25.g1 I P r 1.071ERID Nv= 4.saL- Sto.18+87.41= 5 �4 Nv=43.os' r Nv=3 INV-25.�I'T ROTECTI INV 44. ` I T 8. ZS a INV=43.61' B B ss 16 ,DIP, City fi Jac Sonvllle T r I q I I ss/CLASS 'B'RIP �":m INV 44.7-3Y- ,StO,/Q-fuu,ou I (pkQSy I - REMOVE PIPE a hw" ,,,I i.�, \4i ' DO X D�ISTURB"CSEE DRETAIL L oii A Ili`� �B�ST TOP 31.6 Nye � .......2.a.'.b c.c.a .I.N. V ;2TAPE-L-RT- STA.11 00 DUAL RIGHURN LA WESTERN PARKWAY'4LC F MB 66 P6 62 aS-Bc-BUS BEGIN RESURAI 4 cac S � II'"...... ..OB-3160-PG-880,-.- {-- IS BK/MASONARY 41 'Y Nv=44.416---� -- I I I I . Ir I°� BUS DETAIL 1 DETAIL 3 coNc m MOJACK, LLC MEDIAN V DITCH SPECIAL LATERAL 'V' DITCH .yam III I �,- INa„a s�m.I INmm s�alel WESTERN PARK Y, LLC I -L-RT- Sto.18+90,82 0 I �+ I I I I MB 63 PG 97 snaalaa, snaalae. I _ I I n r? n I Point , Poin, I N O 1 11 1 66P 2 I I D83713PG317 ^+� -Y- Sto.10+34J7 I I I I O NDR I IS BK/MASONARr II a I t o I 1U I I I Fzp'"•,l Fv' a� a I I.,Ey e, Fill ' SbP.�, �, I Bus w RETENTION POND I I I III ( FROM STA. 13+18 TO STA. 17+00 -L- MED Min. D=1 Ff. I I J U I `7 FROM STA. 20+50 TO STA. 24+93.50 -L- MED FROM STA. 11+20 TO STA. 13+00 -Y- RT o I IQ DETAIL 2 DETAIL 6 DETAIL 8 cn c III o II �� LEGEND:- EGEND: SPECIAL LATERAL BASE DITCH - I -- J o. N.f,aSmle) IN -Scale) /~ STREAM OR BODY OF WATER (WET) TOE PROTECTION PIPE OUTLET CHANNEL ' I Nafro s�alal \� SPECIAL LATERAL 'V'DITCH IJ �I. = O 00 (PJD ON FILE VM7) N.-I Q- SEE DETAIL 3 ------ - -}- 7 _ Pill .� a F�I� -- � w,-��a 13 - c.aaaa ?y 3`a`< SI.P. NATURAL 1.SLOPE e, �, Y_ STA. WETLAND BOUNDARY (WET) d D Fie �� "�, LINE SEE SHEET 7 f_ _ _� (pJD ON FILE U3/17) GROUNO d _ Geo,a,4He B GEaTE E MATCH DENOTES MECHANIZED CLEARING Min. D=2 Ft. d= 1.0 Ft. Length=25 Ft. CHANNEL BEa T S IN SURFACE WATER A TEMPORARY IMPACTS 0 Max. Ft. Ft. Max d = 2 Ft. F F DENOTES FILL IN WETLAND Type of Liner= Class T Rip -Rap B=5 Ft. Type of Liner= CI.'B' Rip -Rap EST.60 TONS Est.=30 Tons of Class T Rip -Rap S S DENOTES IMPACTS IN FROM STA. 14+00 TO STA. 14+25 -L- RT FROM STA. 14+25 TO STA. 15+48 -L- RT STA. 24+39 -Yl- RT SURFACE WATER E E DENOTES EXCAVATION IN WETLAND m ' PROJECT REFERENCE NO. SHEET NO. U-5789 7 ' BEG CO T U� TIONI wW SHEET NO. BEGIN RESU & ING ROADWAY DESIGN HYDRAULIC DESIGN �_;Yl STA. �+5A.00 ENGINEER ENGINEER IIII 1045 PC LE CITY O OF JACKSONVIL I 'I' /(� /� J740 7 �% -Yl- PRC StG. 22iP20.48 DOCUMENT NOT CONSIDERED FINAL 12 (/�/ /) / / -, / ! UNLESS ALL SIGNATURES COMPLETED M o 41 1\ PDE - - ' y �_ � - �'' � � -Yl-, Rr St 0. 23+60.71 _ DAVEl',PORT -- / HOMEOFHCE 3M SHlPrnRD aouLEvnao.SUITE E _ I LNLMINGTON, W2 W TB 2 -/� T / N - 3i0.251MI3 7­0 m�.a -F I NCEEISRRMUCENSEW.GP51i -- S39'19'38"E 6 I III (Y/J Sasso 2a:E �r 440.87' / r x S7 N EA 100 E 12 T INS=WA A" EET ' N3 PERMIT DRAWING r - ANAL SHEET 7 OF 9 PDE ,wee 4D9 , TB -/- MIL_I I -. \ IO 0 �'�\APE N 1 / /�� �, \ �� � 0 C ter- 24"C-- DB 4276 PG 335 -- \ BURY PIPE 6 2 BST - 3 Mill 67 PC 74 'y S ETAIL B INVERT 1' �'cposs cess EASEMEN� 1 RP VILLE II, LLC (Y�� f`TS.00 'y °�- _ �N LINKll SO I o,o 0,0045 CRC JACK NVI INv 3 �� a PIPE OUTLET CHANNEL Cy.02 30e ON �3 NK5 04C� I OP 43.64' NV 40.36' CF JS �� '%' I05.00 y / - '' �I $z 30: + E II, LSO LLE �� o INv 4o.3s' - �J' w_ DI AND Imo, BEGIN RESURFACING y J - m OP 43'67' v-39.06 JS EMOVE DB, 4276 PC 335 4 -L LT- STA. 11+00.00 �s °R �o gq ��� 06 LF nB__a7-Pc�_74 a ���o �11 1 - SITE 3 - W RCP -' BST 3 - REM(JVE ANDi\ HN `� i S\ - REPI'ACE PIP�,w ICI P i�4 III - TIP PROJECT U-5781 _ �VI Y - 5A5°NARY ¢ °�ii �r �INtl=3 ° �� T j - BUS P qq V 36.54'L ^ INV AO.g3 INV- - + " < I 4 RETAIN NW--3B.Od�: INV 3�.d2' VNV P i @ETAIN �6' HDPE 3.73 �T $Tl�.,,�1 + �Q.Q� -L- StO.18+94.63- �00 / : g.R� i IN� g os30 KIP RAP' RETAIN I RETAIN I 4: 1.O.27 / 6 iOI�GSTONE `, w I0 4I4.78 ✓ ... n �TUR d5.6 - NOa JCIv_3ad6' _INV.35.23'- Sf PUB C TRFL 8 - - - LS _ O 11' _ bRF�r - _ f _ _ 413 24'RC IV _ __- 4r53 __ - e3z L_LT-"S7o.18+9 F _ - - N - � r �, ,r � �LTr _ _ • I YI $ta 26+65b6 -- -- - - -- T-- -----_ - - - -_____INv-4Y�B'J---� -L-LT - INv=47sv INv=azunzY-� �_� I `_� I °- esF---- -L-LT- S 38'57' 7 E r- -- ----------- _�---- _ MEDIAN 'V'DITCH_______ _ __. __r.}\i -- -- 353'- __ TpP=45.?3-- -ELSEE 1_ ':fi INV=43.L15•-' -- __. o DETAIL - __ -- __ - - - eoNc -L- S 385T-3 b" _- x - - _ --------- - - - -ter -- - -- --#�� - - - --___ __. �\ \a INV 43.73' IIIIII� a. ��_ ______ _- - ___"- W , - - _.. x : \� -L RT- REMO E AND - -. - REMOVE E DI I N 57 , E RESET APPROX. _ I� 17 PROP. G R @IOR - - _ wN_r - - �N _ _ p JBPNSTAR- - �i _ _-__.---_-___ - N LEA PELu _ SPECIAI LA _ k - -• -..i -- --- 0 i __ - MEDIAN N - UAkD)S'AlL O r - _ I 40 - 'DITCH _ (TIE TO EXISTING) TERAL S< ,SASE + CAT-1 - - -- - _ - �g v _ INV= 3 �y / __ __ DETAILI _-- "- - - - r� RETAIN 3 .6 ' / _ JB vvPo1H SEE DITCH W/50 TONLu 24 ', PY/_C; Ci lY, SEE DETAIL Z 36 - 36y R6P_ _ - C __ RET _ �R AIN .67' iw •. __ -_ __ -- Z O N FXISTINI; R/W o NV-37.Q°' SO'CY19C _ 4' P _ �r - _ - \ TOP=47 09 ,32T OTJ31iID6E _ _ _ � `a. , , , L � MONUMENT 04D ��� gLEI -� _�� ,axsEMENrv� . r I� : _ -"' - - - - - .. IT - T - _ _ v �� Ir24 ca TOP-46.o0 24 c&c 1_ - Nr -, - i INV-2T,F E _ N e,1 n n .�, 4NV-s4.11' p- �, I'\ INV-2§!58' -L I INV INNFB cE �' ZtPOOT RID ,� - , INV 4.BSL- $fo.18+87.4/= INV-]z REMOVE - - - s INV-430 za a IL EASEM.0 " `g I B ss 13ANV­ DR tC�ty TOY PROTECTI llNV 44B T REMOVE CLASS B' RIP Ilrytl 44.- ,Sfp, /Q (j,00 0405 I d I I I SEE DETAIL i 040 - 857 _ L� �TOd=3C64^ LDO NOT DISTURB �MP + OP II'I e �1 �0 2q.0& Vv BEGIN RT- STA�11+A OI0-�z 1~F - FOOT BRIDGE _ _ _ _ 24 C&G 24 C&G \` - -aco e w� o / 200' TAPER d N > _� �� t -14� DUAL RIGHT TURN LAN S ���--MB 66 PG 62 cac �� WESTERN-FARKWA�' -�•-e d �.-_--- ��I--2S-sK-aus ------ pn � _ .. - OB 316 P 880 - I 1 - �15° -.-- o a N �ol a o �I I w`- = s BK/MASONARI I LNtl�44.4o---- BUS V4DETAIL 1 DETAIL 3 �;�y coc sFonoamvlao, a�a J I No„o sTmol 3 a` sFano"wr ao. SPECIAL LATERAL '' DITCH M� , aoa _ fl3I �Ih9 n'11, I � I II I MOJACK, LLCMEDIAN V DITCH IAI L_RT- $f0.18+9Q,82 MB 63PG 97N1 Ia 1,,I,, TERN PARK LLC 66 Pz -Y- $to.10+34J7 n DB 3713 PG 317 NDRI IS BK/MASONARr N.-I \ a Fill '' I A Ground `!'I al D E\oKe, s6p" ' 41 41 BUS T I I I I I I O I I --...... �I III iI I I 41 w�l I FROM STA. 13+18 TO STA. 17+00 -L- MED Min. D=1 Ft. �' I 3 w �`�' �'��- FROM STA. 20+50 TO STA. 24+93.50 -L- MED DETAIL 2 FROM STA. 11+20 TO STA.13+00 -Y- RT 01 III LEGEND: cac DETAIL 6 DETAIL 8 _ \ - m o N SPECIAL LATERAL BASE DITCH TOE PROTECTION PIPE OUTLET CHANNEL I of STREAM OR BODY OF WATER /WET I No, ro Scale) II I l ( ) Nu„c s-II No,fo sTalel ��� SPECIAL LATERAL v' DITCH I� 3 + (PJD ON FILE 1/M7) Nmuml \ FNI \Ow. Mu d--"-mow, ,o'i-- �� SEE DETAIL 3 I• _ _ _�__ { �-a __-.__ 0.00 c,o"aa 2.7 D 0 .1 slop, NATURAL �pt� SLOPE v °a '' d TCHLJNE �i- STA. r� WETLAND BOUNDARY (WET) d GROUND d SEE SHEET 7 f_--j (pJD ON FILE 1/3/17) Gee,ex,ile B GEOTExaLE DENOTES MECHANIZED CLEARING Min. D = 2 Ft. d= 1.0 Ft. Length=25 Ff. CHANNEL BEa T S DENOTES RFACEM`PORER Y IMPACTS 0 Max. Ft. Ft. Max d = 2 Ft. F F DENOTES FILL IN WETLAND Type of Liner= Class T Rip -Rap B=5 Ft. Type of Liner= CI.'B' Rip -Rap EST.60 TONS Est-30 Tons of Class T Rip -Rap S S DENOTES IMPACTS IN FROM STA. 14+00 TO STA. 14+25 -L- RT FROM STA. 14+25 TO STA. 15+48 -L- RT STA. 24+39 -Yl- RT SURFACE WATER E E DENOTES EXCAVATION IN WETLAND Uu 6 IU PROJ. REFERENCE NO. SHEET NO. N ■. ■TT U-5789 8 ...................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... 150 140 130 120 110 100 40 80 70 60 50 40 30 20 10 0 10 2.0 30 40 50 60 70 80 40 100 110 120 130 140 150 PERMIT DRAWING SHEET 8 OF 9 E L ..50..... ......... SITE 1 ...... FILL IN WETLANDS .......: ....... ........ .... .... ...... 50.... - ------ ------EXIST. EXISTS MATCH o LIMITS'OF MECHANIZED CLEARING WETLANDS ....40....... .. ......... ......... ........ ........ .,. .....----.-.� __.EXI.STi... 00 40...... 40.33 .24+50.00-..30 TEMPORARY: CHANNEL IMPACTS E , w .... ......... ......... ......... ........ :........ ...... ..:.... ......... ......... ......... ......... .....:....... ...... ...... ...... ......... ......... .................................. ................. ........ ......... PERMANENT CHANNEL IMPACTS ....... .................................. ........ ........ ........ ..... .. .... ................................... N SITE 3 ... 50. _ ........ ................................... ................................... ........ ................................... ...... LIMITS OF MECHANIZED CLEARING MATCH C .... 40......... ......... ......... ........ ......... WETLANDS... ...' �=-- L EXIST.. EXIS -- EX1ST.... -- ---- 0° ......40...... -�� 39!64 , 3: I -- WETLANDS O 7 .... 30 - -- J ___ .......: . ......... ......... ......... ........ ...... .,.... ........ ......... ___ TEMP0-RAlR - CHANNEL IMPACTS 24 + 00.00 ......... ......... ., ........ ...... .. .. ...... ......... ......... ....... .... .. ........ ......... ......... ....... .... T - ........ ......... ........ ..... ... .. ......... 30 ............ .................'., ................:..................;.................;................. ................. ;................................................... .................:.................;.................;.................:..................:.................;................:..................:............... ............. SITE 2 ............ ............ ............. ............ ............ FILL IN ;WETLANDS ............. ............. ............ ............ ............. ............ ................................... 50 50 z MATCH WETLANDS ------ ------ __-- EXIST. EXIST EXIS T .... o '' 40......... ......... ��--- ' :. ................. ....... .. ......... ' ......40...... 30 22 +50.00 3Q N� 150 140 130 120 110 100 90 80 70 60 50 40 30 20 10 0 10 2;0 30 40 50 60 70 9.0 90 100 110 120 130 140 150