HomeMy WebLinkAbout20191132 Ver 1_Mitigation Site Visit_20190114Strickland, Bev
From: Price, Zan (George)
Sent: Wednesday, August 21, 2019 8:38 AM
To: Davis, Erin B
Cc: Haupt, Mac
Subject: FW: [External] RE: East Buffalo Mitigation IRT Site Walk Notes
Follow Up Flag: Follow up
Flag Status: Flagged
-----Original Message -----
From: Price, Zan (George)
Sent: Monday, January 14, 2019 10:57 AM
To: Leslie, Andrea J <andrea.leslie@ncwildlife.org>; Tugwell, Todd J CIV USARMY CESAW (US)
<Todd.J.Tugwell@usace.army.mil>; Shawn Wilkerson <swilkerson@wildlandseng.com>; Jake McLean
<jmclean@wildlandseng.com>; Steve Kichefski <Steven.I.kichefski@usace.army.mil>
Cc: Andrea Eckardt <aeckardt@wildlandseng.com>; Haupt, Mac <mac.haupt@ncdenr.gov>; Kim Browning
<Kimberly. D. Browning@ usace.army.mil>
Subject: RE: [External] RE: East Buffalo Mitigation IRT Site Walk Notes
No additional comments from DWR.
Zan Price, P.E.
Assistant Regional Supervisor—Asheville Regional Office Water Quality Regional Operations Section NCDEQ— Division of
Water Resources
828 296 4662 office
828 2319634 mobile
zan.price@ncdenr.gov
2090 U.S. Hwy. 70
Swannanoa, N.C. 28711
Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed
to third parties.
-----Original Message -----
From: Leslie, Andrea J
Sent: Monday, January 14, 2019 10:31 AM
To: Tugwell, Todd J CIV USARMY CESAW (US) <Todd.J.Tugwell@usace.army.mil>; Shawn Wilkerson
<swilkerson@wildlandseng.com>; Jake McLean <jmclean@wildlandseng.com>; Price, Zan (George)
<Zan.Price@ncdenr.gov>; Steve Kichefski <Steven.Lkichefski@usace.army.mil>
Cc: Andrea Eckardt <aeckardt@wildlandseng.com>; Haupt, Mac <mac.haupt@ncdenr.gov>; Kim Browning
<Kimberly. D. Browning@ usace.army.mil>
Subject: RE: [External] RE: East Buffalo Mitigation IRT Site Walk Notes
Hi Shawn,
Sorry for long lag time in response. I also think that you have captured the discussion well. It's a site with great
opportunity for habitat protection and enhancement. Here are a few comments to add to Todd's:
-There are several references to "NHP Managed Areas". Change NHP managed areas to NHP Natural Areas.
-1 noted multi -flora rose on UT2 and multi -flora and privet on UTS; this should be treated. I recommend that reaches
proposed for preservation should be surveyed for invasives and those found treated.
Andrea
Andrea Leslie
Mountain Habitat Conservation Coordinator NC Wildlife Resources Commission
645 Fish Hatchery Rd., Building B
Marion, NC 28752
828-803-6054 (office)
828-400-4223 (cell)
www.ncwildlife.org
Get NC Wildlife Update delivered to your inbox from the N.C. Wildlife Resources Commission.
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third
parties.
-----Original Message -----
From: Tugwell, Todd J CIV USARMY CESAW (US) <Todd.J.Tugwell@usace.army.mil>
Sent: Wednesday, January 09, 2019 1:50 PM
To: Shawn Wilkerson <swilkerson@wildlandseng.com>; Jake McLean <jmclean@wildlandseng.com>; Price, Zan (George)
<Zan.Price@ncdenr.gov>; Steve Kichefski <Steven.Lkichefski@usace.army.mil>; Leslie, Andrea J
<andrea.leslie@ncwildlife.org>
Cc: Andrea Eckardt <aeckardt@wildlandseng.com>; Haupt, Mac <mac.haupt@ncdenr.gov>; Kim Browning
<Kimberly. D. Browning@ usace.army.mil>
Subject: [External] RE: East Buffalo Mitigation IRT Site Walk Notes
CAUTION: External email. Do not click links or open attachments unless you verified. Send all suspicious email as an
attachment to report. spa m@nc.gov<mailto:report. spa m@nc.gov>
Shawn, I think most of the discussion was captured. A few additional points that were in my field notes:
1. UT2 seemed to have more sediment than some of the other preservation reaches (except UT5), and the buffer
vegetation was younger, so the trib was generally not as high quality.
2. UT3 had several hundred feet of underground flow that disconnected it from the upper watershed. This area needed
to be identified.
3. East Buffalo Creek main stem (upstream of the confluence with Ut2 Reach 2) appeared to have areas that could use
bank stabilization, especially on the right bank where the grass was mowed. This area is a candidate for E2 (2.5:1) if the
amount work needed justifies the ratio. In the revised pre -prospectus, this reach is still shown at a 4:1 ratio.
4. The buffer width was discussed, and IRT applauded the fact that the buffer is proposed to be much wider than the
minimum requirement. It was also discussed that the wider buffers would be considered toward justification for the
proposed credit ratios, rather than being considered using the non-standard buffer credit tool. This is primarily due to
the extent of preservation proposed on the site.
Thanks,
Todd Tugwell
Mitigation Project Manager
Wilmington District, US Army Corps of Engineers
3331 Heritage Trade Drive, Suite 105
Wake Forest, North Carolina 27587
(919) 554-4884 ext. 58
-----Original Message -----
From: Shawn Wilkerson [mailto:swilkerson@wildlandseng.com]
Sent: Wednesday, January 09, 2019 6:51 AM
To: Jake McLean <jmclean@wildlandseng.com>; Price, Zan (George) <Zan.Price@ncdenr.gov>; Kichefski, Steven L CIV
USARMY CESAW (US) <Steven.L.Kichefski@usace.army.mil>; Leslie, Andrea J <andrea.leslie@ncwildlife.org>; Tugwell,
Todd J CIV USARMY CESAW (US) <Todd.J.Tugwell@usace.army.mil>
Cc: Andrea Eckardt <aeckardt@wildlandseng.com>; Haupt, Mac <mac.haupt@ncdenr.gov>
Subject: [Non-DoD Source] RE: East Buffalo Mitigation IRT Site Walk Notes
All
Generally speaking, does the updated pre -prospectus reflect the agreed upon approach and credit ratios for this site
based on our site walk in November? We are planning on moving forward with the site in this manner unless anyone
has any comments or questions.
Thanks,
Shawn
From: Jake McLean <jmclean@wildlandseng.com>
Sent: Wednesday, December 12, 2018 9:36 AM
To: Price, Zan (George) <Zan.Price@ncdenr.gov>; Kichefski, Steven L CIV USARMY CESAW (US)
<Steven.L.Kichefski@usace.army.mil>; Leslie, Andrea J <andrea.leslie@ncwildlife.org>; Tugwell, Todd J CIV USARMY
CESAW (US) <Todd.Tugwell@usace.army.mil>
Cc: Shawn Wilkerson <swilkerson@wildlandseng.com>; Andrea Eckardt <aeckardt@wildlandseng.com>
Subject: East Buffalo Mitigation IRT Site Walk Notes
Good Morning,
Please find the site walk notes attached, along with updated pre -prospectus and figures. Based on our discussions in the
field, and follow-up work, we've prepared updates to the project approach and an explanation of these updates is
provided at the end of the meeting notes.
We hope that you can review and provide comment/feedback on this revised approach and we would be happy to have
a quick call to discuss this in the next couple of weeks. We want to make sure that we have your general buy -in to the
revised approach so that we can proceed with the project.
Please let me know if you have any comments on the minutes.
Thanks,
Jake
Jake McLean I Water Resource Engineer, Project Manager
0: 828.774.5547 M: 828.545.3865
Wildlands Engineering, Inc. <Blockedhttp://www.wildlandseng.com/>
167-B Haywood Road
Asheville, NC 28806