From: laserfiche@ncdenr.gov
Sent: Wednesday, August 28, 2019 9:00 AM
To: tim@maxeybuilders.com
Cc: Georgoulias, Bethany; tim@maxeybuilders.com
Subject: Construction Stormwater NOI Not Accepted
This email is to notify you that your application for WYNNE BROOK, PHASE 2 was not accepted for the
following reason:
Part A 12 - acres disturbed should be 0.42 acres (match the E&SC approval letter)
Part D 2 - E&SC Plan Project ID should be EN1902422276 (Land Disturbing Permit 9 in E&SC letter)
Please resubmit a new eNOI with these items corrected. Everything else looked okay.
Please contact The Stormwater Program Administrative Assistant for more information at(919) 707-
3640. Please reference NOI application no. 15353 and Project ID NCC-GUILF-2019-WYNNE BROOK,
PHASE 2.
This email was automatically generated by Laserfzche. Please do not respond to this email address, as
responses are not monitored.