Loading...
HomeMy WebLinkAboutNC0041386_Inspection_20190828ROY COOPER Governw MICHAEL S. REGAN 5errelory LINDA CULPEPPER Dlnrtw Robert Peele NC Department of Commerce PO Box 549 Wanchese, NC 27981-0549 NORTH CAROLINA Environmental Quality August 28, 2019 SUBJECT: Compliance Inspection Report Wanchese Marine Industrial Park WWTP NPDES WW Permit No. NCO041386 Dare County Dear Mr. Peele: The North Carolina Division of Water Resources conducted an inspection of the Wanchese Marine Industrial Park WWTP on 8/27/2019. This inspection was conducted to verify that the facility is operating in compliance with the conditions and limitations specified in NPDES WW Permit No. NC0041386. The findings and comments noted during this inspection are provided in the enclosed copy of the inspection report entitled "Compliance Inspection Report". The 2019 permit annual fee is overdue. A copy of the 2019 Invoice for the Annual Permit Fee is included for your convenience. If you should have any questions, please do not hesitate to contact me with the Water Quality Regional Operations Section in the Washington Regional Office at 252-946-6481 or via email at robert.e.bullock@ncdenr.gov. Sincerely, Robbie Bullock, Environmental Specialist Il Water Quality Regional Operations Section Washington Regional Office Division of Water Resources, NCDEQ Cc: Laserfiche Northr mi,Ina D.panro ntot Envnonm ntei¢uaGy I DwsonoMmer Reeourws WesM1irtgton RsgiwNDff�w 346 Vlsshington ^rwere Mall �Washingbn, North Gro'ne 27689 °'^ 252-M-6461 United State. Environmental Protection Agency Form Approved. EPA Washington, D.C. 20460 OMB No. 2040-0057 Water Compliance Inspection Report Approval expires 8-31-98 Section A: National Data System Coding (i.e., PCS) Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type 1 i( 2 IG I 3 I NCO041386 I11 12 19/08/27 17 18 r C I 19 I c I 20M 211111 I I I I I I II I I I I I I I I I I I I I I I I I I I I I I I II I I I I I f6 Inspection Work Days Facility Self -Monitoring Evaluation Rating B1 CIA ----------------Reserved-------------- 671 I 70I, I 71 itI I 72 I h I I I LJ LJ 73I I 174 75I M I L L I I80 I I I Section B: Facility Data Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include Entry Time/Date Permit Effective Date P07W name and NPDES permit Number) 10:20AM 19/08/27 17/06/01 Wanchese Marine Industrial Park W WTP Exit Time/Date Permit Expiration Date 615 Harbor Rd 11:00AM 19/08/27 20/01/31 Wanchese NC 27981 Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s) Other Facility Data Name, Address of Responsible OffictaVTitle/Phone and Fax Number Contacted Robert Peele,PO Box 549 Wanchese NC 279810549/Director/252-473-5867/2524736139 No Section C: Areas Evaluated During Inspection (Check only those areas evaluated) Permit Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) (See attachment summary) Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date Robert E Bullock Division of Water Quality//252-948-3924i %0 O l9 Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date EPA Form 35603 (Rev 9.94) Previous editions are obsolete. Page# NPDES 31 NCO041386 I11 1 yr/mo/day Inspection Type 19/08/27 17 18 ICI (Cont.) Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) Robbie Bullock, Robert Tankard and Randy Sipe (DWR WaRO) met with Bob Peels (N.C. Seafood Industrial Park Authority) to inspect the Industrial Park's WWTP. The Wastewater Treatment Plant has been constructed with plans to start connecting the Industries to the wastewater collection system by the end of 2019. The facility was reminded that an Operator in Responsible Charge and Backup Operator in Responsible Charge must be designated 60 calendar days prior to wastewater being intoduced into the system. The Washington Regional Office needs to be notified 48 hours prior to startup of the wastewater treatment facility. The 2019 permit annual fee is overdue. A copy of the 2019 Invoice for the Annual Permit Fee is included for your convenience. Page# Permit: NC0041386 Inspection Date: 08/27/2019 Permit Owner -Facility: wanchese Marine Industrial Park W WTP Inspection Type: Compliance Evaluation (If the present permit expires in 6 months or less). Has the permittee submitted a new application? Is the facility as described in the permit? # Are there any special conditions for the permit? Is access to the plant site restricted to the general public? Is the inspector granted access to all areas for inspection? Comment: Yes No NA NE ■ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ Page# 3 NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY INVOICE Annual Permit Fee IIIIIIIIIIIIII IIIIIIIIIIIIII * 2 0 1 9 P R 0 0 5 2 6 2 Overdue This annual fee is required by the North Carolina Administrative Code. It covers the administrative costs associated with your permit. It is required of any person holding a permit for any time during the annual fee period, regardless of the facility's operating status. Failure to pay the fee by the due date will subject the permit to revocation. Operating without a valid permit is a violation and is subject to a $10,000 per day fine. If the permit is revoked and you later decide a permit is needed, you must reapply, with the understanding the permit request may be denied due to changes in environmental, regulatory, or modeling conditions. Invoice Number: 2019PR005262 Permit Number: NCO041386 Dare County Wanchese Marine Industrial Park WWiP Robert Peels NC Department of Commerce PO Box 549 Wanchese, NC 27981-0549 Notes: Annual Fee Period: 2019-07-01 to 2020-06-30 Invoice Date: 06/06/2019 Due Date: 07/0612019 Annual Fee: $860.00 1. You may pay either by mall with checklmoney order OR by electronic payment (eCheck or Credit Card). 2. If payment is by checklmoney order, please remit payment to: NCDEQ - Division of Water Resources Attn: Animal/Discharge/Non-Discharge Billing 1617 Mail Service Center Raleigh, NC 27699-1617 3. If payment is electronic, please see hftes:lldea.nc.gov/eoavments/we to pay electronically. Payments by eCheck will debit your checking account. Credit card transactions will incur a convenience fee. 4. Please include your Permit Number and Invoice Number on all correspondence. 5. A $25.00 processing fee will be charged for returned checks in accordance with North Carolina General Statute 25-3-512. 6. Non -Payment of this fee by the payment due dale will initiate the permit revocation process. 7. Should you have any questions regarding this invoice, please contact the Annual Administering and Compliance Fee Coordinator at 919-707-3698. (Return This Portion With Check) 111 1111111[111 II IIII I 111111 111 * 2 0 1 9 P R 0 0 5 2 6 2 ANNUAL PERMIT INVOICE Overdue Invoice Number: 2019PR005262 Annual Fee Period: 2019-07-01 to 2020-06-30 Permit Number: NCO041386 Dare County Invoice Date: 6/6/2019 Wanchese Marine Industrial Park W WTP Due Date: 7/6/2019 Annual Fee: $860.00 Robert Peels INC Department of Commerce PO Box 549 Check Number: Wanchese, NC 27981-0549