HomeMy WebLinkAbout330064_Compliance Evaluation Inspection_20190826- 27-1 — i
0 Division of Water Resources
Facility Number - I i J O Division of Soil and Water Conservation
0 Other Agency
Type of Visit: 0 Co lance Inspection Operation Review Q Structure Evaluation 0 Technical Assistance
Reason for Visit: Routine Q Complaint O Follow-up O Referral 0 Emergency O Other ( Denied Access
Date of Visit: Arrival Time: Q : O Departure Time:County:
Farm Name: Owner Email:
Owner Name:
Mailing Address:
Physical Address:
Facility Contact:
Phone:
LL ,�,__il Title: Phone:
Onsite Representative: A/12r Hata,/
Region:
Certified Operator:
Integrator:
Certification Number:
Back-up Operator: Certification Number:
Location of Farm:
Swine
Wean to Finish
Wean to Feeder
Feeder to Finish
Farrow to Wean
Farrow to Feeder
Farrow to Finish
Gilts
Boars
Other
Other
Latitude: Longitude:
Design Current Design Current
Capacity Pop. Wet Poultry Capacity Pop.
EE I I Layer
Non -La er I I El
Pullets
Other
Design Current
Design Current
Cattle Capacity Pop.
Dairy Cow
Dairy Calf
Dairy Heifer
Dry Cow
Non -Dai
Beef Stocker
Beef Feeder
Beef Brood Cow
Discharges and Stream Impacts
1. is any discharge observed from any part of the operation? ❑ Yes Nc . ❑ NA ❑ NE
Discharge originated at: ❑ Structure ❑ Application Field ❑ Other:
a. Was the conveyance man-made? ❑ Yes o ❑ NA ❑ NE
b. Did the discharge reach waters of the State? (if yes, notify DWR) ❑ Yes 2 No ❑ NA ❑ NE
c. What is the estimated volume that reached waters of the State (gallons)?
d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑ Yes Qro [_]NA ❑ NE
2. Is there evidence of a past discharge from any part of the operation? ❑ Yes No ❑ NA ❑ NE
3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes ❑ No ❑ NA ❑ NE
of the State other than from a discharge?
Page I of 3 2/4/2015 Continued
Facility Number: - Date of Inspection- —Z /
Waste Collection & Treatment
4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes En <No NA [—]NE
a. If yes, is waste level into the structural freeboard? ❑Yes o ❑ NA ❑ NE
Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6
Identifier:
Spillway?:
Designed Freeboard (in):
Observed Freeboard (in):
5. Are there any immediate threats to the integrity of any of the structures observed?
(i.e., large trees, severe erosion, seepage, etc.)
6. Are there structures on-site which are not properly addressed andlor managed through a
waste management or closure plan?
❑ YesNo ❑ NA ❑ NE
❑ Yes /No ❑ NA ❑ NE
If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environments reat, notify DWR
7. Do any of the structures need maintenance or improvement? ❑ Yes ❑ NA ❑ NE
8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes No ❑ NA ❑ NE
(not applicable to roofed pits, dry stacks, and/or wet stacks)
9. Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ NE
maintenance or improvement?
Waste Application
10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes No ❑ NA ❑ NE
maintenance or improvement?
11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE
❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.)
❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil
❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area
12. Crop Type(s):
13. Soil Type(s):
14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes❑ NA ❑ NE
15. Does the receiving crop andlor land application site need improvement? ❑ Yes N NA ❑ NE
16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes No ❑ NA ❑ NE
acres determination?
17. Does the facility lack adequate acreage for land application? ❑ Yes ❑ NA [:]NE
18. Is there a lack of properly operating waste application equipment? ❑ Yes No ❑ NA ❑ NE
Required Records & Documents
19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ YeseNo
❑ NA ❑ NE
20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes ❑ NA ❑ NE
the appropriate box.
❑WUP ❑Checklists ❑Design ❑Maps ❑ Lease Agreements ❑Other:
21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes 6 No ❑ ❑ NE
❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Trans , s Weather Code
❑ Rainfall ❑Stocking ❑ Crop Yield El120 Minute Inspections ❑ Monthly and 1" Rainfall Inspectio s Sludge Survey
22. Did the facility fail to install and maintain a rain gauge? ❑ Yes No ❑ NA ❑ NE
23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No ❑ NA ❑ NE
Page 2 of 2/4/2015 Continued
Facilit Number: - lI Date of Ins ection: — 19 1
24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes❑ NA [:]NE
25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes��No[_] NA ❑ NE
the appropriate box(es) below.
❑ Failure to complete annual sludge survey [] Failure to develop a POA for sludge levels
❑ Non-compliant sludge levels in any lagoon
List structure(s) and date of first survey indicating non-compliance:
26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes No NA ❑ NE
27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes o ❑ NA ❑ NE
Other Issues
28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document
❑ Yes ❑ No ❑ NA ❑ NE
and report mortality rates that were higher than normal?
29. At the time of the inspection did the facility pose an odor or air quality concern?
❑ Yes ❑ No ❑ NA ❑ NE
If yes, contact a regional Air Quality representative immediately.
30. Did the facility fail to notify the Regional Office of emergency situations as required by the
❑ Yes ❑ No ❑ NA ❑ NE
permit? (i.e., discharge, freeboard problems, over -application)
31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below.
❑ Yes ❑ No ❑ NA ❑ NE
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other:
32. Were any additional problems noted which cause non-compliance of the permit or CAWMP?
❑ Yes [] No ❑ NA ❑ NE
33. Did the Reviewer/Inspector fail to discuss review/inspection with an on-site representative?
❑ Yes ❑ No ❑ NA ❑ NE
34. Does the facility require a follow-up visit by the same agency?
❑ Yes ❑ No ❑ NA ❑ NE
Comments (refer to question #): Explain any YES answers and/or any additional recommendations or any other comments.
[Tse drawings of facility to better explain situations (use additional panes as necessarv).
�� 6 i) J1 w L 014-1 Pe. r fl -7; r'✓A leas S t n U �c 2
� o vg15 .
Reviewevinspector Name:
Reviewer'[ nspector Signature: fwd eipw
Page 3 of 3
Phone: / Il zo 6
Date: Z,
214/20!5