HomeMy WebLinkAboutEmail RE Construction Stormwater NOI Not Accepted - 15256 Morman, Alaina
From: laserfiche@ncdenr.gov
Sent: Monday, August 26, 2019 8:18 AM
To: jlewis@drbgroup.com
Cc: Georgoulias, Bethany; rtalton@drbgroup.com
Subject: Construction Stormwater NOI Not Accepted
This email is to notify you that your application for Trinity Creek Phase 3A was not accepted for the following
reason:
Everything looked good, except the NOI Certification Form uploaded in Part D 96 was *NOT* the NOI
Certification Form with the original signature of Jay Lewis -- instead it was just a PDF copy of the eNOI with
an electronic signature at the end. Please see the link to the NOI Certification Form right above this section of
the eNOI form. You must submit a new eNOI with that form uploaded.
Please contact The Stormwater Program Administrative Assistant for more information at(919) 707-
3640. Please reference NOI application no. 15256 and Project ID NCC-WAKE-2019-Trinity Creek Phase
3A.
This email was automatically generated by Laserfzche. Please do not respond to this email address, as
responses are not monitored.
i