HomeMy WebLinkAbout20070096 Ver 1_401 Application_20070107
r
PAI
Office Use Only: Form Version March 0~
USACE Action ID No. DWQ No.
X0070096
(If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A".)
I. Processing
] . Check all of the approval(s) requested for this project:
Section 404 Permit ^ Riparian or Watershed Buffer Rules
^ Section 10 Permit ^ Isolated Wetland Permit from DWQ
401 Water Quality Certification ^ Express 401 Water Quality Certification
2. Nationwide, Regional or General Permit Number(s) Requested: Nationwide 19
3. If this notification is solely a courtesy copy because written approval for the 401 Certification
is not required, check here: ^
4. If payment into the North Carolina Ecosystem Enhancement Program (NCEEP) is proposed
for mitigation of impacts, attach the acceptance letter from NCEEP, complete section VIII,
and check here: ^
5. If your project is located in any of North Carolina's twenty coastal counties (listed on page
4), and the project is within a North Carolina Division of Coastal Management Area of
Environmental Concern (see the top of page 2 for further details), check:Ij,~ ~t~~,a~
~~~ ~~1
II. Applicant Information
~rti 1 ~ Z0~7
1. Owner/Applicant Information ~'' ( ~'~'~~'-~~~~°:~,T~'
Name Rick Struck for Rumbling Bald Resort on Lake Lure ~!'"~`'^' ?`~,. ~` er`','"~? 9fEAhCl1
Mailing Address: 112 Mountains Blvd. Lake Lure NC 28746 _
Telephone Number: 828 694 3008 Fax Number: 828 625 9229
E-mail Address: RStruck(a~rumblingbald.com
2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter
must be attached if the Agent has signatory authority for the owner/applicant.)
Name:
Company Affiliation:
Mailing Address:
Telephone Number:
E-mail Address:
Pale 5 of 13
Fax Number:
111. Project Information
5
Attach a vicinity map clearly showing the location of the property with respect to local
landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property
boundaries and development plans in relation to surrounding properties. Both the vicinity map
and site plan must include a scale and north arrow. The specific footprints of all buildings,
impervious surfaces, or other facilities must be included. If possible, the maps and plans should
include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property
boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion,
so long as the property is clearly defined. For administrative and distribution purposes, the
USAGE requires information to be submitted on sheets no larger than I 1 by 17-inch format;
however, DWQ may accept paperwork of any size. DWQ prefers full-size construction
drawings rather than a sequential sheet version of the full-size plans. If full-size plans are
reduced to a small scale such that the final version is illegible, the applicant will be informed that
the project has been placed on hold until decipherable maps are provided.
1. Name of project: Silt removal at residents marina.
2. T.I.P. Project Number or State Project Number (NCDOT Only):
3. Property Identification Number (Tax PIN): 74-2107635 _
4. Location
County: Rutherford Nearest Town: Lake Lure
Subdivision name (include phase/lot number): Rumblin Bald Resort
Directions to site (include road numbers/names, landmarks, etc.): hwv 64/74 to Bill's
Creek Rd west on Buffalo Creek rd north on Buffalo Shoals rd to Rumbling Bald
ward gate Mountains blvd to left on Quail ridge blvd. to wellness spa site across from
parking lot
Site coordinates (For linear projects, such as a road or utility line,
separately lists the coordinates for each crossing of a distinct waterbody.)
Decimal Degrees (6 digits minimum): °N
6. Property size (acres): 2500
7. Name of nearest receiving body of water: Broad River
8. River Basin: Broad river
(Note -this must be one of North Carolina's seventeen designated major river basins. The
River Basin map is available at http:%!h?o.cnr.state.nc.us/admin;'maps/.)
9. Describe the existing conditions on the site and general land use in the vicinity of the project
at the time of this application: lake level down 4 feet surrounding area is a resort
attach a sheet that
oW
Page 6 of 13
that they are will to accept payment for the mitigation must be attached to ti~is form. For
additional information regarding the application process for the NCEEP, check the NCEEP
website at http:/!h2o.enr.state.nc.us/~-,cam.%index.htm. If use of the NCEEP is proposed, please
check the appropriate box on page five and provide the following information:
Amount of stream mitigation requested (linear feet): 0
Amount of buffer mitigation requested (square feet): 0
Amount of Riparian wetland mitigation requested (acres): 0
Amount ofNon-riparian wetland mitigation requested (acres): 0
Amount of Coastal wetland mitigation requested (acres): 0
IX. Environmental Documentation (required by DWQ)
1. Does the project involve an expenditure of public (federal/state/local) funds or the use of
public (federal/state) land? Yes ^ No X~
2. If yes, does the project require preparation of an environmental document pursuant to the
requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)?
Note: If you are not sure whether aNEPA/SEPA document is required, call the SEPA
coordinator at (9l9) 733-5083 to review current thresholds for environmental documentation.
Yes ^ No ^
3. If yes, has the document review been finalized by the State Clearinghouse? if so, please
attach a copy of the NEPA or SEPA final approval letter. Yes ^ No ^
X. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ)
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
required state and local buffers associated with the project. The applicant must also provide
justification for these impacts in Section VII above. All proposed impacts must be listed herein,
and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a
map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ
Regional Office may be included as appropriate. Photographs may also be included at the
applicant's discretion.
1. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233
(Neuse), l5A NCAC 2B .0259 (Tar-Pamlico), l5A NCAC 02B .0243 (Catawba) 15A NCAC
2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please
identify )? Yes ^ No X®
2. If "yes", identify the square feet and acreage of impact to each zone of the riparian buffers.
If buffer mitigation is required calculate the required amount of mitigation by applying the
buffer multipliers.
Zone* Impact
(square feet) Multiplier Required
Mitigation
1 3 (2 for Catawba)
Page I 1 of 13
* Lone I cstends oul 30 feet perpendicular ti-om the top of the near bank of channel: 7.one 2 calends an
additional 2(I Icet Crom the edge of Zone I.
3. II• buffer mitigation is required, please discuss what type of mitigation is proposed (i.e..
Donation of Property, Riparian Buffer Restoration /Enhancement, or Payment
Riparian Buffer Restoration Fund). Please attach all appropriate information as
within 15A NCAC 2B .0242 or .0244, or .0260. N/A
XI. Stormwater (required by DWQ)
Describe impervious acreage (existing and proposed) versus total acreage on the site. Discuss
stormwater controls proposed in order to protect surface waters and wetlands downstream from
the property. If percent impervious surface exceeds 20%, please provide calculations
demonstrating total proposed impervious level. Immediate area has app. 3/4 acre of Harkin;;
lot and roof area with storm drains to the lake.
XII. Sewage Disposal (required by DWQ)
Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of
wastewater generated from the proposed project. or available capacity of the subject facility.
No new waste water to be created by this proiect Current wastewater handled by the
NPDES permitted wastewater facility owned by the town of Lake Lure.
XII1. Violations (required by DWQ)
Is this site in violation of DWQ Wetland Rules (15A NCAC ZH .0500) or any Buffer Rules?
Yes ^ No X~
Is this an after-the-fact permit application? Yes ^ No X~
XIV. Cumulative Impacts (required by DWQ)
Will this project (based on past and reasonably anticipated future impacts) result in additional
development, which could impact nearby downstream water quality? Yes ^ No X
If yes, please submit a qualitative or quantitative cumulative impact analysis in accordance with
the most recent North Carolina Division of Water Quality policy posted on our website at
http:.!h2o.enr.state.nc.us;ncwetland5. If no. please provide a short narrative description:
Area will continue to be used as a recreational boatin;? and swimming area with no future
development that would impact water quality
into the
identified
Pale 12 of 13
~ ~ 1 ~ J
t
~G~~ cC~ rvfCC;! ~i> .r' !'nra-E~.h='~~'C`~ ~~Y'l.n(r' ~~d ~.~f° ~K'~~i'~~;~(-I<. I-~~ t,
~,
'ant/Agent's Signature Date
~gnature is valid only if an authorization letter from the applicant is provided.)
j~LiMBLING BALj~
[tESOKT ON LAKE LU2E
ToM Ju~soN
CHIEF ExE_cu TIVE
112 Mountains Boulevard direct: 528.694.3031
Lake Lure, NC 28746 fax: 866.593.7516
cell: 528.301.6345
tjudson@rumblingbald.com
Page 13 of 13
'SIVLh GJ1!y_f
tl 4r a(~;"~"",, k~f
tP: a9 ~ N fyT - It '~F T :~-r -
,aet~ as M'rr 73 .^ a3 •K"\`.I 81 l9 i0 it •t N~ ~ ,. ~`~'
6a ~ T? ~,.. L} ~ 75
N N ' 76 ~ at '~ ' N Ta
~' as - ~ ~,~+ ' 77 7i iVlay
i ~ 77 ~
. I9a: 1N laI ~ lq : sa "'"~'nNCroN st 7 7a F~• al ~ S . y ~ .rt ~'r ,. A'c
/) %ala' ~~~' ~.. _1 1N N ~ Ro4~ 1Y -` 7a • ~F+4 ~' ~ f ~::. y '
~~ ~ 17t r I7a I7t ; RO , `laa , . 97 ~...~~~"" H ~ .. ;; , ~~, ~ t .;
alt ; I77 ; ' t 1fa 1t; 1pr 1tl .1N N H SI ~ ~~ ~ ;. ~ Jl~ 33 °l~ , ~~.4 ,
,. 17i ~ 17t laa j w,uvnn, ~ _. 93 -~ cY r ,~
qa ` ~ _. ~ ., lal -,.171 Ip f 0! ~ i .:, ~a c
,y ~ I .. /191 1Y+ly r .. ~ at ~ 3T 30
ty ~'W~'~1at?IM. lp; r lt9 ,4 '7Ji ~~.. 1N , 1a7~ ~ so , '~ Nt 3a 35 ~ 3I .*.
o - _ ~ t laa { t laal- . 3N ; ~ +, Ia9 ~, t ._- O7 ~ to to ~~ .~~ ~ -
~~ gat j . ..: 1a7 ~ ..:~ 1K :~9 _ ,:., ie I ~ as uR '° za a4'' d`~ 1 ~
t ~ tat tea • ~ •1K" ~`~ ° . IN ` 1M , lal. f ~;1ta, 13 '. tal N 3 • 'p ~ ' . ` 27 t
'la ' -- _ ~ '' `~ iEE
~aaz a~+ ; r,~ " . ~ ~ r. -.. ~:.... tat , ,W ~- v , .~ ~ ~ u _ . s9
!al f . '•,aM} aa9;as! ~,.,IM~' } lef + Aa ^ Il ~ ' fa ! laa ^ ~ ~ la ut4p.M a ' J '~ ' X
,a~i,' t ~~' ,' 1a1 ``~ 1N ~ ' J11 1__ ~ ~ Sri ` ~ - . '!t ~ - J zo t1 22 ' tl 9 TanRSt *Cy
• ua laa ~ _ lai ~ f#I : i IN - ..,M i -' mot' ,
.. ,; RolrN CT 1N .1K t `_ 11 a ~ ~ g' a v ., 9 n
. _.. _ . a9a`,~ lp .'~\,14i } p ~ i 11a '~ Ia ~ 17 ~~
lt7 ~, u
u ~~. ~.. aal ~ . ,M f - M _ ' 2 ~ Mi ~ +f.. ~. : ,`R li 7 S - 16 ~ 19 `= . 7 a i
11 $ ~
alti ~r •. tIa ~ , i p :.. r 9t Q , ` Lti ~ 77 ~ ~ ~ gyro ~~' a 10 sca 6 Fe~+es: a ee.
2aa pQ`.r tlt n<_ _~. `1 •~4 N . .~ !! - ,~." 1! ~ O~ li K 12 102
r '~t3a: Q Mme. ~s° K K ~ Ar'~ 7t . n7ti !t L,, '~ M w~texentE 101 W takev<wa<
r ~ SS V ~ l
111 ..... ~ ~. ~i t 9a_ ., ~ as • -, al `' ~ .. 7a ~ " ao . »~. t7 ., a y, al N 9a laa • /~(' ~i/
lal N 7,,p 6~ M '.an.M !~ ~ ~M,,b ~=~al/~ ~1a, _ _ ~~ D~~
' r a,+n
7a ..
;: ~VEl7RD ~.. -Q ~ .•'q a7 a alrtrc ~ ~N ~ ~,~ ..}+ ~ .`
p s~. , ., ~ % at ,~ as ' ... alt ma
~` _ gg p
lla ~o N al` __ N tl - ~ r ~ ~ ~ M of l ~ : ~ A '` i
u7 a ut +~ue . a9 ~*s~aa -,,... , : w ~ ~ 1s 17 ~~;~! .. ~ ~ L COVE
. _ . ~ '..17 ~ _ • is ,1s 1~ DOGjy~, . ~: la .t , ~ LAUREL7 _
u. u'u `~ ~ ~ 7 ~LANQ~NG'
is a 1ala~,*~
PROPOSED DEVELOPMENT 19 7 a ~~' 1 \~a
O
,' ~ awa as s ~
i4'r f u e
r i u ~,~ 3 ~ EA R__- F.EK
sj° z
zT pis 9
se ~ tz
ti o lu e
z~ ie 7 f, c*
19, li sNOacJ t
4~
17 9qp 11 12 a~RS i 3
@ ~
15 13 y ~ 5
ii lu 0
HIGHt An,n ~..__ a o-0
~3' s
To
74A
~7
mJ
3
MaiMmreno.
Nea
rry
.r r
SNUMC?NT EST
~ I
sa .
u 3s
u u
s.
- -
ss u `
ti ^;
t7
26 ~ 3a
zs 28
s
ze 'x~ :e
`~
,~, BLACK MTN
;~
w DINK
} -~ `~ ~ CANNON
ASH EVILLE ~~~~~ ,~ A ~~ ~ °°
9 ,;° 1135
JJ t
~~ ~. ~k ~,,e,~ BUFFALO
PISGAH ~ 25 7~-~' GERTON ~° CREEK
~ RD ~~
NATIONAL ~, ~~ ~, ~"" ~~
.~• ~
FOREST ,,~.. r; ~ BAT CAVE ~~'"' o~ o°i
,r
f,.r''~ ~' ~}T4 ~ ~'1f
,.~"' f~,. ~ b~3~ CHIMNEY ROCK ~.~;~,~ r -~~_A
J
,.. ,.
"~ ~- ASHEVILLE BILLS
!' A '•'~~h'.
~~'~,~' ~ AIRPORT fi~ '`t`s LAKE CREEK
°~° ~.~' ~p~ LURE T ~
~~ Q~ HENDERSONVILLE RUTHERFORD 0
n~ j.
~J
' ~ ~~
`f" 2~
?s
N
Y\
~~
COLUMBUS ( ~
c
y~,r'; NORTH CAROLINA ~
TRYON _______
SOUTH CAROLIIVn
I
1046
,~.c
(JiCIN17Y MAP
no scofe
•~~
~.
~~ .
~ ~ ~ `~
'~w\v~~
',.',,.~o`,
M~1 ~,
' 1
Ir ~rrt'.
i ~ ~ ~V ,O1t~
~,
PIfJiEt COGiOI;P. ":iER`;%r~5: ..G `~.
1~ SbIMr a. Uan, cutlly ane o} W ralorinq ore mar. r:
;.; a Hat the rurwy neaten a rup0lrialon or land
dtnN Pt arec o1 o counly a municlpcllty Ihal
naa ar adMOnn foal «qu'oUa paceh of .and:
;; h. that the furwl Ie Ixclta in wch pallor 01 0
counly or a muoiclpollly Ihol It unrpulaled ore to
or ordinance toot requlatet Dace'f of land;
^c. that the eurwy it of an errtlnq parch or pprcUe
of 'cod;
;; d. Iha1 the w+•ry s of anoMer rotegary fud ore
the «compinolion or e.utsq pacNe, o tart ordered
eaf Nr. Of Otnr eaceptlon to the dt~in~tiM: p} d
wadirieion;
': e. Nol tnr inrprmollon oro1lp01a h auch tool ~ am
unwle to mate a Oelerme,pfon to the oeN ar m)
proleniono' opNlly oa Ic parlsiona tontaineC in (p)
;hrou9n (d) wow.
hCC$ MOr:JNENT ~
'
' ~~, `a ^ -
~~~
• , i CODCfQ t' Y.. ~~ ~ ~~ -~ -- - . _ _
~~'
iNC MCNNfMWS
(IiAVJ 2D) E'.i7 ]0]E uE'EpS ~ ,+ \. ~ - -- _ =_-- ~~~ ~1" "
\ (996.?' FT.) ` ~ 1.. t;- n ^~ -
- ^ `_• - - - t~'"~ J _ ..
_
LAKE `'`
~ ~~~
' •~.
/ ~''~`
~
LURE 1 ~+• ~ •
' '`..i,E., 49.88
-,_.~~
~. , Pa,w.t~y
' _i
'
,
"
~
nett gC.eoo a~t~ -'` ~
Q ~ ~
secthq. '
~. ~~.
•
GRAPHIC SCALE 'r '
-/'
: r'', ^= "
- --- ~------_------- O
ac a z r do ap
_ (tti FEET' 1
1 lath -= BO ft
t..
'L Slrnn P. Q.r, prtlft IM PY mq .r set
It rv r rner my IrDr..awn, hrn r Or1Y0
~ y mrr sy me v wM my ~prANr(~ ^ !'^
r N Uovrrt r te~rWelr h t: ]L.~34 : Uel
Ue eanaMr oat rwwr.t rr Ms.n a aaw :hr
pear hrn Flrmoilr fount r rNrrtr re.n
sn Ihh morn Uat Uh mop ~r rrrr h vevas.a
•M 0.Sr7-70 r ore 1Mnw mr npM ma wd
tnb ~_0ay of ~ 2W'
5/wyr
:39.i'''
hpIrVNMf hvnrr
NOMEI:CIrTJ RE
[,5 fA'S7r:C .R71 5'ArE
1.~5 LEA NOV Si~XE
LVSJi.Eff: WIE
,R,fl JNMARMEO Dnr+T
fM EtEC'R'C ME'ER
Ras R.U'.90A:. $DikE
aD ponE9 p~'.~
'r0 ES'.
?ROPE9'Y 'S SU3:E;,' .C :~': R'CH'S
OE 'NAY OE RECORD FOR RC:CS.... ';EF e055
i}'ERE ARE'~0 :i516LE E:dC40rC!-::-='i'E 'C-
r'ROPERTY ~CIES.
!(0 "mE SEARCH tiAS ~OYE ~'1 "~E S,;R.TiCR.
of
GATEWAY I THE
0~~~ MNTS.
pUAiLRIOGf
BLYJ~` ~ n ~ N C
~ ~' A a
' -~
W
i0
LAKE
LURE
0
D
r
N
A
.1
d,
~.
`~, '
~,1` / t
...
. ,... - - -
FAIRFIELD MOUNTAINS
PROPERTY OWNERS ASSOC. INC.
;core. =o~ '?e`ere^~ce: ":'.-.--.--
Ivir FV i7L _ .._ _`rf' ~-'I~!~;~~I ~:Iy,i tl ,.~.~.T~
JL'f':ej 'J j: "' J J.
:y~,,,;e 609 S. Sroaclio~ t. _~~ _ 2-155A
r~ ~''~----rores_ G~__~.__.29G_'-'_-- - ------------
-EaTo
os EsisnNC ua sT•NE
MIS NE• IRON STAKE
-- UNSURVE~'EO LYi
UYP UMYAIINEO PdMT
[M EIFCTIMC YE TER
RRS RAA.ROAO SPIRC
-P 10~ER POLE
U' UGNT POIE
BLVD. C
OF TFIE +~
C.1T~WAy pR. Nnts.
0
NOTES
PROPERTY iS SUB.IECT TO ALL RIGHTS
OF VAY OF RECORD FOR ROADS, UTILITIES, ETC.
THERE ARE NO VISIBLE ENCROACHMENTS ACROSS
PROPERTY LINES EXCEPT AS SHOVN OR OF RECORD.
NO T1TLE SEARCH VAS DONE Br THE SURVEYOR.
SITE:
VICINITY MAP
no scale
gCCS HONUYENT
'THE YOUNTAWS'
(NAOO 29) EUEV.: 3010 ~ETEM
(996.717 FT.)
GRAPHIC SCALE
(a Vt1T
t ~e • eo ft