Loading...
HomeMy WebLinkAboutNC0020052_Remission (Request)_20190816 At402;` ` McAD E VI LLE August 16, 2019 RNCEIVED/NGDEQ/DWR NC Division of Water Resources AUG 2 2 2019 QC Permitting Section- NPDES Permitting and Compliance Program 1617 Mail Service Center P Waterity �rmitting Section Raleigh, NC 27699-1617 Subject: Request for Rescission of NPDES Permit#NC0020052 Location, as listed in the permit, end of Church St. McAdenville, NC Dear Permitting Unit Staff, McAdenville's wastewater treatment plant has been taken offline by the Phase II South Fork Sewer Project,which has rerouted the Town's wastewater flow into the City of Gastonia's collection system. Sewer flow is no longer entering the treatment plant,sludges and solids have been removed from the plant, and the piping has been disconnected such that the plant can no longer discharge to the South Fork Catawba River. Demolition of the treatment plant structure is scheduled to be completed within the next 90 days. Any rain water that accumulates in the treatment plant prior to demolition will be pumped into the new collection system piping to ensure proper treatment. Additionally, Ori Tuvia, Environmental Engineer at the Mooresville Regional Office, completed a site visit on August 14, 2019. A partial engineer's certification for the sewer project was submitted to and approved by PERCS Branch staff, please see attached. The partial certification was necessary since flow would automatically be routed into the new sewer infrastructure upon completion of three sewer line tie-ins. These three tie- ins were completed after approval of the partial certification. The City of Gastonia's engineer is compiling information now to submit the final engineer's certification. It is understood that the NPDES permit cannot be rescinded until the final engineer's certification is approved by PERCS. The Town respectfully requests permit rescission as soon as is feasible to avoid the expense of the required five day per week visitation. Should there be any questions regarding this notification, please contact Lesley Dellinger at 704-824- 3190 or clerk@townofmcadenville.org. Sincerely, Ji Robinette Mayor Certified Mail: 7016 1370 0000 8337 6859 CC: Stephanie Scheringer, City of Gastonia Teresa Murray,CWMTF Ori Tuvia, Mooresville Regional Office PO Box 9 • 163 Main St. • McAdenville, NC 28101 • 704-824-3190 • Fax 704-824-3248 North Carolina Department of Environmental Quality Division of Water Resources Permit Number: W00038297 Version: 1.0 Issued Date: 8/5/2016 Permit Type: Gravity Sewer Extension.Pump Stations.B.Pressure Sewer Extensions Facility Name: South Fork Sewer-Phase Ij Facility County: Gaston Latitude: 35.254000 Longitude: -81.086000 Facility Region: Mooresville Owner Information Details: Submit a Permit Ownership/Name Change form to DWR to make any changes to this Owner information. Note that the owner is the legally responsible entity. (Click Here for"Permit Ownership/Name Change"Palm) Owner Name: City of Gastonia Owner Affiliation: Michael Peoples Title: Addressl: PO Box 1748 Address2: City,State&Zip: Gastonia,NC 28053 Work Phone: 704-866-6721 Fax: Email Address: michaelp@cityofaastonia.com Permit Engineer/Environmental Consultant Name Organization Name Phone Email Eric Howard 704- - erich@twonversutdities.com Permit Events Event Description Date Comment Permit issued 8/5/2016 Partial Engineer Certification 7/8/2019 Approx.1370 LF 18-inch gravity,1699 GPM tnpex PS,approx 750 LF 8-inch FM, Received approx 10,427 LF 16-inch FM. Permit Comments(including all prior versions) Date Comment Text Version 8/5/2016 for the construction and operation of approximately 88 linear feet of 8-inch gravity sewer;approximately 1,370 1.00 linear feet of 18-inch gravity sewer;a 1,6990gallon per minute triplex pump station(3 pumps),on-site audible and visual high water alarms,telemetry,and a permanent generator with automatic transfer switch;as well as approximately 150 linear feet of 6-inch force main,approximately 750 linear feet of 8-inch force main and approximately 10,427 linear feet of 16-inch force main to serve as part of the South Fork Sewer 0 Phase II project,and the discharge of 321,000 gallons per day of collected wastewater into the City of Gastonia❑s existing sewerage system G1 p e C 6� i C W d r i-x. f OP l f]p,ll r rel Liz?ope . o n .�r p f c�n iryn 7/16/2019 Page 1