HomeMy WebLinkAboutWM0100457_Approval_20190826DocuSign Envelope ID: DD167736-B3A7-4780-85FD-E352DC8D96D8
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
LINDA CULPEPPER
Director
Pulliam Properties, Inc.
Attn: Rusty Pulliam
2 Walden Ridge Drive, Suite 70
Asheville, NC 28803
NORTH CAROLINA
Environmental Quality
August 26, 2019
Re: Well Construction Permit WM0100457
Talmadge and Helen Penland Property
675 Patton Avenue
Buncombe County
Dear Mr. Pulliam:
In accordance with the application submitted on your behalf by James Bevers on August 22, 2019, we
are forwarding well construction permit WM0100457 dated August 26, 2019. The permit is for the
construction of three temporary monitoring wells on property owned by Talmadge and Helen Penland
as described in the application and the attached permit.
The permit will be effective from the date of issuance for a period of one year and is subject to the
conditions and limitations as specified therein. A Well Construction Record shall be completed and
signed by the certified drilling contractor for each well. The forms shall be submitted to the Department
upon completion of the wells and shall reference the applicable permit number. Please review the
attached permit conditions.
If you should have any questions or need additional information, contact Andrew Moore at 828-296-
4500.
Sincerely,
DocuSigned by:
r--�)
7E617A38285848C...
G. Landon Davidson, P.G.
Regional Supervisor
Water Quality Regional Operations Section
cc: James Bevers— ECS Southeast, LLP (via email)
ARO file
D Q
�� North Carolina Department of Environmental Quality I Division of Water Resources
Asheville Regional Office 12090 U.S. Highway 70 1 Swannanoa, North Carolina 28778
11 NORTH CAROLINA i
nwr'.m o' enw-g WIKV �� 828.296.4500
DocuSign Envelope ID: DD167736-B3A7-4780-85FD-E352DC8D96D8
NORTH CAROLINA
DEPARTMENT OF ENVIRONMENTAL QUALITY
DIVISION OF WATER RESOURCES
PERMIT FOR THE CONSTRUCTION OF MONITORING WELL
In accordance with the provisions of Article 7, Chapter 87, North Carolina General Statutes, and other applicable
Laws, Rules and Regulations.
PERMISSION IS HEREBY GRANTED TO
Pulliam Properties, Inc.
FOR THE CONSTRUCTION OF A MONITORING WELL SYSTEM consisting of three temporary monitoring wells owned
by Pulliam Properties, Inc., 2 Walden Ridge Drive, Suite 70, Asheville, NC 28803. The monitoring wells will be
located on property owned by Talmadge and Helen Penland in Buncombe County (PIN #9638-58-3667). This Permit
is issued in accordance with the application received August 22, 2019, in conformity with specifications and
supporting data, all of which are filed with the Department of Environmental Quality and are considered integral
parts of this Permit.
This Permit is for well construction only and does not waive any provision or requirement of any other applicable
law or regulation. Construction of any well under this Permit shall be in strict compliance with the North Carolina
Well Construction Regulations and Standards (15A NCAC 02C .0100), and other State and Local Laws and regulations
pertaining to well construction.
If any requirements or limitations specified in this Permit are unacceptable, you have a right to an adjudicatory
hearing upon written request within 30 days of receipt of this Permit. The request must be in the form of a written
petition conforming to Chapter 150B of the North Carolina General Statutes and filed with the Office of
Administrative Hearings, 6714 Mail Service Center, Raleigh, North Carolina 27699-6714. Unless such a demand is
made, this Permit is final and binding.
This Permit will be effective for one year from the date of its issuance and shall be subject to other specified
conditions, limitations, or exceptions as follows:
1. Issuance of this Permit does not supersede any other agreement, permit, or requirement issued
by another agency.
2. The well(s) shall be located and constructed as shown on the attachments submitted as part of the
Permit application.
3. Each well shall have a Well Contractor Identification Plate in accordance with 15A NCAC
02C .0108(0) where applicable.
4. The monitoring well shall be maintained in accordance with 15A NCAC 02C .0108.
5. A Well Construction Record (GW-1) for each well shall be submitted to the Division of Water
Resource's Information Processing Unit within 30 days of the well completion in accordance with
15A NCAC 02C .0114.
6. When the well is discontinued or abandoned, it shall be abandoned in accordance with 15A NCAC
02C .0113 and a well abandonment record (GW-30) shall be submitted to the Division of Water
Resource's Information Processing Unit and the property owner within 30 days of the well
abandonment in accordance with 15A NCAC 2C .0114.
Permit issued the 26th day of August, 2019
FOR THE NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
DocuSigned by:
Landon Dav m6l anahSupervisor�
Water Quality Regional Operations Section
By Authority of the Environmental Management Commission
Permit No. # WM0100457