Hey Dave,
I talked to Brandon via phone, and its correct that we didn’t do any work within the 25ft buffer during the
moratorium. However, we did allow the contractor to work outside the buffer during that period, but nothing close to
the creek /within the trout zone.
Thanks,
Kevin
Kevin Hining
Division 11 Environmental Officer
North Carolina Department of Transportation
336 903 9129 office
828-386-8687 cell
kjhining@ncdot.gov
801 Statesville Rd.
PO Box 250
North Wilkesboro, NC 28659
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
_____________________________________________________________
From: Hining, Kevin J
Sent: Thursday, August 22, 2019 11:43 AM
To: Wanucha, Dave <dave.wanucha@ncdenr.gov>
Cc: Greer, Brandon S <bgreer@ncdot.gov>
Subject: RE: Sampson Road question
1
Hey Dave,
I don’t know of any work done within the trout moratorium….I suppose it’s possible there may have been some work
done in areas outside the 25 ft trout/buffer zone (possibly up high on the project nr the ridge line), but I’m not sure. I’ve
cc’d Brandon for clarification.
Thanks,
Kevin
Kevin Hining
Division 11 Environmental Officer
North Carolina Department of Transportation
336 903 9129 office
828-386-8687 cell
kjhining@ncdot.gov
801 Statesville Rd.
PO Box 250
North Wilkesboro, NC 28659
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
_____________________________________________________________
From: Wanucha, Dave <dave.wanucha@ncdenr.gov>
Sent: Thursday, August 22, 2019 11:40 AM
To: Hining, Kevin J <kjhining@ncdot.gov>
Subject: RE: Sampson Road question
OK great, and so all the work that has been completed up to this point was done outside of the moratorium? I did not
check that in the NPDES records.
Dave Wanucha
Division of Water Resources
401 & Buffer Transportation Permitting
NC Department of Environmental Quality
336-776-9703 office
336-403-5655 mobile
Dave.Wanucha@ncdenr.gov
2
NC DEQ Winston Salem Regional Office
450 West Hanes Mill Road, Suite 300
Winston Salem, NC 27105
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
From: Hining, Kevin J <kjhining@ncdot.gov>
Sent: Thursday, August 22, 2019 11:23 AM
To: Wanucha, Dave <dave.wanucha@ncdenr.gov>
Cc: Greer, Brandon S <bgreer@ncdot.gov>
Subject: RE: Sampson Road question
Hey Dave,
No, we are still required to follow the WRC moratorium - so no instream work or land disturbing within the 25-foot trout
zone between Oct 15 and April 15. So, we’ll either have to tackle the additional jurisdictional items (pipe extension at
th
Station 35 and stream stabilization at Station 49) on Sampson prior to Oct 15 or after April 15. It sounded like our
maintenance crew may work on the stabilization at Station 49 soon. I’ve Cc’d Brandon Greer this email, just to clarify
thth
that we’ll need to do that work before Oct 15, or wait till after April 15.
Thanks,
Kevin
Kevin Hining
Division 11 Environmental Officer
North Carolina Department of Transportation
336 903 9129 office
828-386-8687 cell
kjhining@ncdot.gov
801 Statesville Rd.
PO Box 250
North Wilkesboro, NC 28659
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
_____________________________________________________________
From: Wanucha, Dave <dave.wanucha@ncdenr.gov>
Sent: Thursday, August 22, 2019 11:12 AM
3
To: Hining, Kevin J <kjhining@ncdot.gov>
Subject: Sampson Road question
Kevin,
Does that trout waiver from DEMLR include in-stream work during the moratorium period Oct 15 – April 15 as requested
by WRC?
Thanks.
Dave Wanucha
Division of Water Resources
401 & Buffer Transportation Permitting
NC Department of Environmental Quality
336-776-9703 office
336-403-5655 mobile
Dave.Wanucha@ncdenr.gov
NC DEQ Winston Salem Regional Office
450 West Hanes Mill Road, Suite 300
Winston Salem, NC 27105
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.
4