HomeMy WebLinkAbout20170637 Ver 2_Inspections_20190823Wetland Inspection Report
Project Num: 20170637
Project Name: NCDOT - SR 1526A, Sampson Road
County: Watauga
Location: NCDOT - SR 1526A, Sampson Road
Latitude: +36' 09'
SW Plan Location
Site Owner Name NC DOT Division 11
Inspection Date: 8/20/2019
Reason for Inspection Complaint
Inspection Type: Site Inspection (DOT)
Inspection Contact Person:
On -Site Representative(s):
Primary Inspector: Dave Wanucha
Secondary Inspector(s):
Facility Compliance Status: 0 Compliant
Program Areas: 401 (includes isolated/non-404)
Question Areas:
Permit (401 WQC)
Inspection Summary:
Version: 2 Status: Issued
Project Type: Road
maintenance/repair/improvemen
Region: Ylinston-Salem
Longitude: -81 ° 35' 49"
Title: Phone:
❑ Not Compliant
Phone: 336-776-9703
The project is on hold until budget issues return to normal. In the meantime, Roadside will continue to monitor veg until
80% cover is achieved at which point the project may be handed over to maintenance until project is active again. Paving,
minor shoulder work, stream channel work and a pipe extension are left to do. Further inspections will occur unitl project
is offically completed.
page: 1
Site Number: 20170637 Owner: Pettyjohn, Michael A.
Inspection Date: 8/20/2019 Inspection Type: Site Inspection (DOT) Reason for Visit: Complaint
Permit (401 WQC) Yes No NA NE
Does the impact(s) match what was approved in the 401 WQC or non 404 permit? 0 ❑ ❑ ❑
Are the culverts and/or filled areas installed properly? 0 ❑ ❑ ❑
Is the site compliant with additional conditions of the 401 WQC or non 404 permit? 0 ❑ ❑ ❑
Comment: This was a follow-up inspection due to a complaint by WRC staff working in the area. I met with several
DOT staff including the resident engineer and assistant, environmental officer, roadside environmental
engineer and maintenance engineer. All pipes were installed per the plans. One site had a few pieces of
Class B rip rap that had fallen into the channel. They were removed immediately. Bare soil throughout
was seeded and matted or vegetation was actively growing. EC measures were in place and maintained.
page: 2