HomeMy WebLinkAboutNCC191518_ESC Approval Submitted_20190823ROY COOPER
Governor
MICHAEL S. REGAN
story
�. OANIEL SMITH
Director
NORTH CAROLINA
Environmental Quality
July 8, 2019
LETTER OF APPROVAL WITH MODIFICATIONS
NVR, Inc 1 Ryan Homes
Attention: Mark Langford
9920 Kincey Avenue, Building X Suite 200
Huntersville, North Carolina 28078
RE: Project Name: Pendleton Phase 2 Supplemental EC Plan for Ryan Homes Lots 81-73 & 127-145
Acres Approved: 5.3
Project ID: CABAR-2019-102
County: Cabarrus
City: Concord
Address: Temple Ridge Drive South East
River Basin: Yadkin-PeeDee
Stream Classification: Othe
Submitted By: NVR, Inc / Ryan Homes
Date Received by LQS: July 8, 2019
Plan Type: Revised
Dear Mr. Langford:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be
acceptable with modifications and hereby issue this letter of Approval with Modifications. The Modifications
Required for Approval are listed on the attached page. This plan approval shall expire three (3) years
following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A
NCAC 4B .0129,
As of March 1, 2019, all new construction activities are required to complete and submit an electronic Notice
of Intent (N01) form requesting a Cercate of Coverage (COC) under the NCG010000 Construction
Stormwater General Permit. This form MUST be submitted prior to the commencement of any land disturbing
activity on the above named project. The NOI form may be accessed at deq.nc.gov/NCG01. Please direct
questions about the NOI form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark at
Paul.clark@ncdenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you
within three business days. Initially, DEMLR will not charge a fee for coverage under the NGG01 permit.
However, on or after May 1, 2019, a $100 fee will be charged annually. This fee is to be sent to the DEMLR
Stormwater Central Office staff in Raleigh.
Title 15A NCAC 46.0118(a) and the NCG01 permit require that the following documentation be kept on file
at the job site:
D_EQ� North Carolina Department ofEnvlronmentalQuality I DIvlslonofEnergy,MlneralandLandResources
�/� Mooresville Regional OfFlce 1610 East Center Avenue, Sutte 301 I Mooresville, North Carolina 28115
+� / 704.663.1699
Letter of Approval with Modifications
NVR, Inc/ Ryan Homes
July 8, 2019
Page 2 of 3
The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 30 days.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure
compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing
natural resources and adjoining properties. If, following the commencement of this project, the erosion and
sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act
of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan
and implementation of the revisions to insure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water
quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this
land -disturbing activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial
Responsibility Form, which you provided. You are requested to file an amended form if there is any change
in the information included on the form. In addition, it would be helpful if you notify this office of the proposed
starting date for this project. Please notify us if you plan to have a preconstruction conference.
Your cooperation is appreciated.
Sin ly, '/
Christopher Graybeal
Assistant Regional Engineer
Land Quality Section
Enclosures: Certificate of Approval
Modifications Required for Approval
NCG01 Fact Sheet
c: Harris Engineering
Attention: Wayne Harris, PE
5200 Park Road, Suite 231
Charlotte, North Carolina 28209
Inspection Department
Letter of Approval with Modifications
NVR, Inc / Ryan Homes
July 8, 2019
Page 3 of 3
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: Pendleton Phase 2 Supplemental EC Plan for Ryan Homes Lots 61-73 & 127-145
Project ID: CABAR-2019-102
County: Cabarrus
Modifications pursuant to applicable North Carolina General Statutes and/or Regulations:
1) The stockpile must be wrapped in silt fencing on the downgradient side and
the site must be maintained such that flow to the sediment basin is not hindered
by the stockpile. [G.S.113A-57(3),15A NCAC 4B .0115]
2) The angle for graded slopes and fills, including stockpiles, shall be no greater than
the angle that can be retained by vegetative cover or other adequate erosion control
devices or structures. [G.S. 113A-57(2)]
3) Be advised the 7/14-day soil stabilization requirements apply to any section of the
project including stockpiles where land -disturbing activities have temporarily or
permanently ceased and shall supersede any less stringent stabilization requirement
on the plans. [G.S.143-215.1]
Additional Comments:
Our Division maintains an interactive web -based map to help the public determine whether
development activities are subject to the post -construction state stormwater permitting
program or other stormwater permitting requirements. If your project is subject to state
Phase II stormwater permitting requirements, you must, have the post -construction
stormwater permit prior to construction. The web -based map is located at:
https:I/deq.nc.govlaboutldivisionslenergy-mineral-land-resou rceslenergy-mineral-land-
datalstormwatermaps-gis-resources
� �
r..i .., �. w �+
0 0 rmq p w°
c� 'bn
" 4ma
o y"
*ma ILLI
ca o nn cd o
� b
a0 u
00
moma
4.4
PIZ
^ V d
� PO
1
0