Loading...
HomeMy WebLinkAboutNCC191518_ESC Approval Submitted_20190823ROY COOPER Governor MICHAEL S. REGAN story �. OANIEL SMITH Director NORTH CAROLINA Environmental Quality July 8, 2019 LETTER OF APPROVAL WITH MODIFICATIONS NVR, Inc 1 Ryan Homes Attention: Mark Langford 9920 Kincey Avenue, Building X Suite 200 Huntersville, North Carolina 28078 RE: Project Name: Pendleton Phase 2 Supplemental EC Plan for Ryan Homes Lots 81-73 & 127-145 Acres Approved: 5.3 Project ID: CABAR-2019-102 County: Cabarrus City: Concord Address: Temple Ridge Drive South East River Basin: Yadkin-PeeDee Stream Classification: Othe Submitted By: NVR, Inc / Ryan Homes Date Received by LQS: July 8, 2019 Plan Type: Revised Dear Mr. Langford: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The Modifications Required for Approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129, As of March 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (N01) form requesting a Cercate of Coverage (COC) under the NCG010000 Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on the above named project. The NOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the NOI form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NGG01 permit. However, on or after May 1, 2019, a $100 fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. Title 15A NCAC 46.0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: D_EQ� North Carolina Department ofEnvlronmentalQuality I DIvlslonofEnergy,MlneralandLandResources �/� Mooresville Regional OfFlce 1610 East Center Avenue, Sutte 301 I Mooresville, North Carolina 28115 +� / 704.663.1699 Letter of Approval with Modifications NVR, Inc/ Ryan Homes July 8, 2019 Page 2 of 3 The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 30 days. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sin ly, '/ Christopher Graybeal Assistant Regional Engineer Land Quality Section Enclosures: Certificate of Approval Modifications Required for Approval NCG01 Fact Sheet c: Harris Engineering Attention: Wayne Harris, PE 5200 Park Road, Suite 231 Charlotte, North Carolina 28209 Inspection Department Letter of Approval with Modifications NVR, Inc / Ryan Homes July 8, 2019 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Pendleton Phase 2 Supplemental EC Plan for Ryan Homes Lots 61-73 & 127-145 Project ID: CABAR-2019-102 County: Cabarrus Modifications pursuant to applicable North Carolina General Statutes and/or Regulations: 1) The stockpile must be wrapped in silt fencing on the downgradient side and the site must be maintained such that flow to the sediment basin is not hindered by the stockpile. [G.S.113A-57(3),15A NCAC 4B .0115] 2) The angle for graded slopes and fills, including stockpiles, shall be no greater than the angle that can be retained by vegetative cover or other adequate erosion control devices or structures. [G.S. 113A-57(2)] 3) Be advised the 7/14-day soil stabilization requirements apply to any section of the project including stockpiles where land -disturbing activities have temporarily or permanently ceased and shall supersede any less stringent stabilization requirement on the plans. [G.S.143-215.1] Additional Comments: Our Division maintains an interactive web -based map to help the public determine whether development activities are subject to the post -construction state stormwater permitting program or other stormwater permitting requirements. If your project is subject to state Phase II stormwater permitting requirements, you must, have the post -construction stormwater permit prior to construction. The web -based map is located at: https:I/deq.nc.govlaboutldivisionslenergy-mineral-land-resou rceslenergy-mineral-land- datalstormwatermaps-gis-resources � � r..i .., �. w �+ 0 0 rmq p w° c� 'bn " 4ma o y" *ma ILLI ca o nn cd o � b a0 u 00 moma 4.4 PIZ ^ V d � PO 1 0