Loading...
HomeMy WebLinkAboutSW3190701_Responce to Comments_20190822LATHAM-WALTERS ENGINEERING, INC. E CIVIL ENGINEERING LAND PLANNING SITE DEVELOPMENT 1 6507-A NORTHCROSS DRIVE B /'- __� / HUNTERSVILLE, NC 28078 August 22, 2019 Mr. Jim Farkas NC Department of Environmental Quality 1612 Mail Service Center Raleigh, NC 27699-1612 Re: Request for Additional Information Stormwater Permit No. SW3190701 Harwood Automotive Cabarrus County Dear Mr. Farkas: In response to your request for information dated July 31, 2019, we offer the following responses: 1. Application was revised to show High Density development 2. The property owner is listed as Ms. Wendy Harwood. Ms. Harwood is married to Mr. Archie Harwood. Both are listed as directors of Harwood Automotive, as shown on the Articles of Incorporation included with this submittal. 3. Stormwater Management summary was revised to reflect the High Density nature of this project. 4. Existing surface waters have been labeled on the plan. Section 4, Items 7 and 8 were re- calculated to reflect the surface waters on site. 5. Application was revised to only show one column of data for the sand filter (Section IV, 10) 6. Supplement EZ form was completed. 7. Calculations for rip -rap outlet and ditch were added to the submittal documents. 8. Surface Water have been labeled on the plans. 9. A wetland delineation was performed by SynTerra. The wetlands were added to the plans and a report is included in this submittal. 10. Drainage area for the sand filter is shown on the erosion control plan. The existing pond is not providing any stormwater management. PHONE: (704) 895-8484 MITCH@LWENGINEER.COM LATHAM-WALTERS ENGINEERING, INC. E CIVIL ENGINEERING LAND PLANNING SITE DEVELOPMENT 1 6507-A NORTHCROSS DRIVE B /'- __� / HUNTERSVILLE, NC 28078 Mr. Jim Farkas August 22, 2019 Page 2 11. The soils report was amended to include the soil boring logs and a map showing the location of the bores. This is included in this submittal. 12. All reference to sod was removed from the plans. Sand Chamber was modified so that no additional area is provided other than the square footage needed for the sand. 13. The calculations were revised to utilize 2"/hour (4'/day). This is the rate of flow through the sand. The drawdown of the sand filter was left at 40 hours for the first inch of rain to meet the sand filter requirements. 14. PDF's of all the revisions are being uploaded for our review. Two hard copies of the revised plans and 1 hard copy of other documents will be mailed. Please let me know if you require any further information or clarification on any of these items. Sincerely, Latham -Walters Engineering, Inc. Mitchell S. Latham, P.E. PHONE: (704) 895-8484 MITCH@LWENGINEER.COM PHONE: (704) 895-8484 MITCH@LWENGIN EER.COM