Loading...
HomeMy WebLinkAbout19941092 Ver 1_COMPLETE FILE_19941128State of North Carolina 'LTV Department of Environment, VA Health and Natural Resources 4 • • Division of Environmental Management James B. Hunt, Jr„ Governor p E H N F? Jonathan B, Howes, Secretary A. Preston Howard, Jr., P,E„ Director November 28, 1994 Lenoir County DEM Project # 941092 COE # 199404431 APPROVAL of 401 Water Quality Certification Carolina Power & Light Company Ms. Brenda E. Brickhouse Senior Specialist P.O. Box 1551 Raleigh, North Carolina 27602 Dear Ms. Brickhouse: You have our approval to place fill material in approximately 17 acres of wetlands or waters for the purpose of installing a transmission line over the Neuse River between US Highway 17 and SR 1569, as you described in your application dated 23 November 1994. After reviewing your application, we have decided that this fill is covered by General Water Quality Certification Number 2664. This certification allows you to use General Permit Number 049 when it is issued by the Corps of Engineers. This approval is only valid for the purpose and design that you described in your application. If you change your project, you must notify us and you may be required to send us a new application. For this approval to be valid, you must follow the conditions listed in the attached certification. In addition, you should get any other federal, state or local permits before you go ahead with your project. If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 30 days of the date that you receive this letter. To ask for a hearing, send a written petition which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, P.O. Box 27447, Raleigh, N.C. 276 1 1-7447. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Environmental Management under Section 401 of the Clean Water Act. If you have any questions, please telephone John Domey at 919-733-1786. Sincerely, reston oward, Jr. E. U Attachment cc: Wilmington District Corps of Engineers Corps of Engineers Washington Field Office Washington DEM Regional Office Mr. John Domey Central Files D. M. Barefoot; CP&L P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-7015 FAX 919-754-t(Mltr An Equal Opportunity Affirmative Action Employer 50% recycled/ 10°16 post-consumer paper i D ID: ACTION ID: N TIONWIDE PERMIT APPLIED FOR (PROVIDE NATIONWIDE PERMIT !n: REGIONAL PERMIT APPLIED FOR: SAWC081-N-000-0049 JOINT APPLICATION FORM FOR NOV Z 3 1994 NATIONWIDE PERMITS THAT REQUIRE NOTIFICATION TO CORPS OF ENGINEER§NM1k0'VAlE yTRL SClErICV,; NATIONWIDE PERMITS THAT REQUIRE SECTION 401 CERTIFICATION CONCURRENCE NATIONWIDE PERMITS THAT REQUIRE INDIVIDUAL SECTION 401 CERTIFICATION 401 ISSUED WILMINGTON DISTRICT ENGINEER CORPS OF ENGINEERS DEPARTMENT OF THE ARMY P.O. BOX 1890 WILMINGTON, NC 28402-1890 ATTN: CESAW-CO-E TELEPHONE (919) 251-4511 WATER QUALITY PLANNING DIVISION OF ENVIRONMENTAL MANAGEMENT NC DEPARTMENT OF ENVIRONMENT, HEALTH, AND NATURAL RESOURCES P.O. BOX 29535 RALEIGH, NC 27626-0535 ATTN: MR. JOHN DORNEY TELEPHONE (919) 733-5083 ONE (1) COPY OF THIS COMPLETED APPLICATION SHOULD BE SENT TO THE CORPS OF ENGINEERS. SEVEN (7) COPIES SHOULD BE SENT TO THE N.C. DIVISION OF ENVIRONMENTAL MANAGEMENT. PLEASE PRINT. 1. OWNERS NAME: Carolina Power & Light Company 2. OWNERS ADDRESS: P.O. Box 1551 Raleigh. NC 27602 3. OWNERS PHONE NUMBER (HOME): (WORK): 919-546-6782 4. IF APPLICABLE: AGENT'S NAME OR RESPONSIBLE CORPORATE OFFICIAL, ADDRESS, PHONE NUMBER: Brenda E. Brickhouse Senior Specialist P.O. Box 1551 Raleigh. NC 5. LOCATION OF PLANNED WORK (ATTACHED MAP). COUNTY: Lenoir NEAREST TOWN OR CITY: Kinston to Grifton SPECIFIC LOCATION (INCLUDE ROAD NUMBERS, LANDMARKS, ETC.): Between US Highway 17 and SR 1569 6. NAME OF CLOSEST STREAM/RIVER: Neuse River 7. RIVER BASIN: Neuse 8. IS THIS PROJECT LOCATED IN A WATERSHED CLASSIFIED AS TROUT, SA, HQW, ORW, WS I, OR WS II? YES [ ] NO [ X ] 9. HAVE ANY SECTION 404 PERMITS BEEN PREVIOUSLY REQUESTED FOR USE ON THIS PROPERTY? YES [ ] NO [XI IF YES, EXPLAIN. 10. ESTIMATED TOTAL NUMBER OF ACRES OF WATERS OF THE U.S., INCLUDING WETLANDS, LOCATED ON PROJECT SITE: 94 acres will be cleared (100 foot wide right of way corridor for the entire line of approximately 20 miles). Total acres of wetlands in yroiect site unknown. 3/30/92 -2- 11. NUMBER OF ACRES OF WATERS OF THE U.S., INCLUDING WETLANDS, IMPACTED BY THE PROPOSED PROJECT: FILLED: CLEARED: Approximately 17 acres DRAINED: FLOODED: EXCAVATED: _ TOTAL IMPACTED: Approximately 17 acres 12. DESCRIPTION OF PROPOSED WORK (ATTACH-PLANS): Clear 100 foot wide corridor of all woody vegetation, with stumps left intact, and install 230 kV wood pole transmission line with structures ssoaced approximately 600 feet apart. 13. PURPOSE OF PROPOSED WORK: Electric power transmission line needed to serve load in the area. 14. STATE REASONS WHY THE APPLICANT BELIEVES THAT THIS ACTIVITY MUST BE CARRIED OUT IN WETLANDS. ALSO, NOTE MEASURES TAKEN TO MINIMIZE WETLAND IMPACTS. This line is in the optimum location that minimizes overall environmental and land use impacts. Wetland impacts will be minimized by hand cutting, seedine and mulching disturbed areas, minimizing the number of structures in the wetlands, and constructing no permanent access roads. 15. YOU ARE REQUIRED TO CONTACT THE U.S. FISH AND WILDLIFE SERVICE (USFWS) AND/OR NATIONAL MARINE FISHERIES SERVICE (NMFS) REGARDING THE PRESENCE OR ANY FEDERALLY LISTED OR PROPOSED FOR LISTING ENDANGERED OR THREATENED SPECIES OR CRITICAL HABITAT IN THE PERMIT AREA THAT MAY BE AFFECTED BY THE PROPOSED PROJECT. HAVE YOU DONE SO? YES [ ] NO [ X ] Correspondence with the North Carolina Natural Heritage Program revealed no endangered or threatened species RESPONSES FROM THE USFWS AND/OR NMFS SHOULD BE FORWARDED TO CORPS. 16. YOU ARE REQUIRED TO CONTACT THE STATE HISTORIC PRESERVATION OFFICER (SHPO) REGARDING THE PRESENCE OF HISTORIC PROPERTIES IN THE PERMIT AREA WHICH MAY BE AFFECTED BY THE PROPOSED PROJECT? HAVE YOU DONE SO? YES [ X ] NO [ ] RESPONSE FROM THE SHPO SHOULD BE FORWARDED TO CORPS. Additional information may be found in the attached Application Report. 17. ADDITIONAL INFORMATION REQUIRED BY DEM: A. WETLAND DELINEATION MAP SHOWING ALL WETLANDS, STREAMS, AND LAKES ON THE PROPERTY. B. IF AVAILABLE, REPRESENTATIVE PHOTOGRAPH OF WETLANDS TO BE IMPACTED BY PROJECT. C. IF DELINEATION WAS PERFORMED BY A CONSULTANT, INCLUDE ALL DATA SHEETS RELEVANT TO THE PLACEMENT OF THE DELINEATION LINE. D. IF A STORMWATER MANAGEMENT PLAN IS REQUIRED FOR THIS PROJECT, ATTACH COPY. E. WHAT IS LAND USE OF SURROUNDING PROPERTY? Undeveloped forest, agriculture F. IF APPLICABLE, WHAT IS PROPOSED METHOD OF SEWAGE DISPOSAL? Not applicable OWNER'S SIGNATUR DATE ,I _ fi s r f, N' 41 IW / a 'RIM • ? • ? •• III * ? J r' . •t ', 11;4 • ? • • q I ? J ?? 'y V \ ••••I • e . , a t? • 8 .•• ? '\?:j AI••, jt' ,•ti of ?`'0 •q 1 r••,. • ? •' ?'•?' - .f . •'-„fib, r. ` • ? rlr,.t •• ? j ••• ? • • III ^ /• w ,?• • .`? ', ? ?• ^• ? III ' ' 41 r - • .4•.. r • r ,1• I ••? • ••.•.s • s••. ••• ^•_. • 7 jrV. ' f•. K • 7. • b ' •7T • • ?, • • p 4 ?? ist ? ? ? ? ••? ?? '• r __ a losses •• •• '•.• • r 0 ON ,a .46 ') ?• ..o ' ..r P• - I _ •• • • ??' • ??• ' ., • • •r ••f S?rr rat )_ • r • t •,• a ` 46 Z'Ar2?- t tC Ty+• ± I` 'S n r? 01 052 ZN s • ,1? rn i1? ai • J .n.r...,yl ZN e' 1 ? • r i r •?y'r '' il" « { ... _ r r wg roc a rl M M r. o ` / i ) ^ ??' ? ?• 1, .. • ..,• j 1 ? O Y • \\ W cr ~ W a w y J J W z w H g 2 t z J h ? ff?? d a i Z J J w W V ~ g a a a o W w []©OD 40 a N4tk ? t •,, l F? `polka ?? Z W W Q I JJJ Z l ( > > Y le , ` l? O n N w a c(?? i22y = a ? ?? l? Q W XX J W W I I' ;J • i t i (CP&L Carolina Power & Light Company P.O. Box 1551 411 Fayetteville Street Mall Raleigh, N.C. 27602 401 ISSUED August 25, 1994 Mr. Cliff Winefordner U.S. Army Corps of Engineers P.O. Box 1890 Wilmington, N.C. 28402-1890 Dear Mr. Winefordner: Attached are 4-copies of CP&L Drawing # CT-41184-3 depicting our proposal to construct a 230 kV transmission line across the Neuse River at a point located 8.5 miles upstream from the NCSR 1470 Bridge in Lenoir County, N.C. If this proposal meets with your approval kindly authorize us to proceed with this work. Yours very truly, D. M. Barefoot Sr. Utilities Coordinator DMB/acg(wineford. itr) •? W W a a cli W N LL I D 2 p S J J I J J pW Qf toW Co 120 N LA N N 10F 60°F m m N NORMAL ELEV.= 4' PURPOSE: TO TRANSMIT ELECTRIC POWER AT 230.000 VOLTS FROM WOMMACK SUBSTATION TO KINSTON DUPONT SUBSTATION. N 03 29'-12' E -m- N LA .212° F '8' I NL 167' 234' 1 414' Doi-" ON ; we L 815' i 80 60 9D N s in 40 F- - - - H 20 0 i 'A'- ELEV. 28.951 BOTTOM OF BRIDGE ON SR 1470 APPROX. 8.5 MI. DOWNSTREAM 'B'- ELEV. 25.5':100 YR. FLOOD LEVEL J.A. & ESTELLE DAUGHETY GEORGIA PACIFIC CORP. BOOK 865. PAGE 04 BOOK 886. PAGE 57 LENOIR CO. LENOIR CO. DATE: 8/3/8T DATE: 9/8/88 N.C. GRID NORTH 11qr-- K/NSTpN II ?yF Gf RIVER 1804 1803 1803 VICINITY MAP 1001 / ?KINSTON DUPONT 230 KV SUB N 1800 OVERHEAD WIRE CROSSING ? CAROLINA POWER & LIGHT RALEIGH N. C. KINSTON DUPONT-WOMMACK 230 KV LINE CROSSING NEUSE RIVER LOCATION LENOIR COUNTY 'ORZ. 1 400' 7_28_94 Scale VERT.1 40' Date Drawn By AWL Checked By BAM DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS ??1 ??JU? P.O. BOX 1890 J WILMINGTON, NORTH CAROLINA 28402-1890 IN REPLY REFER TO September 7, 1994 Regulatory Branch Action ID No. 199404431 and General Permit No. CESAW-CO81-N-000-0049 Mr. D. M. Barefoot Carolina Power and Light Company Post Office Box 1551 411 Fayetteville Street Mall Raleigh, North Carolina 27602 Dear Mr. Barefoot: Reference your letter of August 25, 1994, whereby you informed us of your plans to install a 230 kV transmission line over the Neuse River, 8.5 miles upstream of the S.R. 1470 bridge, Lenoir County, North Carolina. On January 1, 1994, we renewed general permit No. 198100049, (copy enclosed) that authorizes the maintenance, repair and installation of aerial and subaqueous utility lines with attendant structures and the discharge of excavated or fill materials, within construction/access corridors, associated with utility line maintenance, repair and installation in navigable waters and waters of the United States in the State of North Carolina. Your proposed work is authorized if you can comply with all general permit conditions. Please read the enclosed permit to prevent an unintentional violation of Federal law. If you have questions, contact Mr. Norm Sanders, Washington Field Office, Regulatory Branch, telephone (919) 975-3025. Since, ?- G. Wayne Wright Chief, Regulatory Branch Enclosure -2- Copies Furnished (without enclosure): Mr. John Parker Division of Coastal Management North Carolina Department of Environment, Health and Natural Resources Post Office Box 27687 Raleigh, North Carolina 27611-7687 Mr. John Dorney Division of Environmental Management North Carolina Department of Environment, Health and Natural Resources Post Office Box 29535 Raleigh, North Carolina 27626-0535 Mr. Wallace R. Sherron, Director State Property Section North Carolina Department of Administration 116 West Jones Street Raleigh, North Carolina 27603-8003 Commander Fifth Coast Guard District Federal Building 431 Crawford Street Portsmouth, Virginia 23705 Copies Furnished with plans: Director, Atlantic Marine Center National Ocean Service ATTN: MOA232X1 439 West York Street Norfolk, Virginia 23510-1114 NOAA National Ocean Survey Marine Chart Branch N/CG 2211 Rockville, Maryland 20852 DEPARTMENT OF THE ARMY Wilmington District, Corps of Engineers Post Office Box 1890 Wilmington, North Carolina 28402-1890 General Permit No. 198100049 Name of Permittee: General Public Effective Date: January 1, 1994 Expiration Date: December 31, 1999 DEPARTMENT OF THE ARMY GZNZ AL PERMIT A general permit to perform work in or affecting navigable waters of the United States and waters of the United States, upon recommendation of the Chief of Engineers, pursuant to Section 10 of the Rivers and Harbors Act of March 3, 1899 (33 U.S.C. 403), and Section 404 of the Clean Water Act (33 U.S.C. 1344), is hereby modified and renewed by authority of the Secretary of the Army by District Engineer U.S. Army Engineer District, Wilmington Corps of Engineers Post Office Box 1890 Wilmington, North Carolina 28402-1890 TO MAINTAIN, REPAIR AND INSTALL AERIAL AND SUBAQUEOQS UTILITY LINES WITH ATTENDANT STRUCTURES AND TO DISCHARGE EXCAVATED AND/OR FILL MATERIALS WITHIN CONSTRUCTION/ACCESS CORRIDORS IN NAVIGABLE WATERS AND WATERS OF THE UNITED STATES IN THE STATE OF NORTH CAROLINA. 1. Special Conditions. a. Work authorized by this general permit includes the installation of pipes and pipelines for the transportation of any gaseous liquid, liquefiable or slurry substance and any cable, line or wire for the transmission of electrical energy, telephone or telegraph messages, and radio and television communication. This general permit authorizes the temporary discharge of excavated material from trenches or footings, the temporary discharge of excavated or fill material for construction of access roads, the temporary stockpiling of excavated or fill material for bedding and backfill and the discharge of material for bedding and backfill, including outfall and intake structures. All work will conform to the standards contained herein. Other construction activities are not authorized by this general permit. b. Excavation or discharge of dredged or fill material in any emergent wetlands, forested wetlands, beds of submerged aquatic vegetation or shellfish beds is discouraged. Whenever practicable, utility line routes will avoid areas of concentrated shellfish production and submerged beds of vascular aquatic vegetation. C. Installation of aerial utility lines in Currituck Sound, Core Sound, lower Pamlico Sound, Falls Lake, Jordan Lake and other areas identified as important to avifauna migration and movement, will be specifically coordinated with the U.S. Fish and Wildlife Service. -2- d. To install a utility line under the authority of this general permit, the permittee mnst apply to the District Engineer by submitting a written description of the work and appropriate drawings on 8-1/2 inch by it inch paper. Immediately after receipt of an application, the District Engineer will assign an action identification number and examine the proposal to determine the applicability of this general permit. If the proposal satisfies the general permit conditions, the District Engineer will so inform the permittee by letter which may contain additional, specific conditions to assure that the work will have only a minimal impact on resources. The permittee may not commence construction until he receives the District Engineer's letter. Copies of this letter, with drawings, will be furnished co the Director, Atlantic Marine Center, National Ocean Service, Norfolk, Virginia, and NOAA, the National Ocean Survey, Marine Chart Branch, Rockville, Maryland. e. The temporary discharge of excavated or fill material in waters or wetlands will be for the absolute minimum period of time necessary to accomplish the work. f. This general permit does not authorize any permanent changes in preconstruction elevation contours in waters or wetlands. A permitter will have a specific plan for restoring wetland contours. Any excess material will be removed to a highground disposal area. g. The area of waters of the U.S. that is disturbed will be limited to the minimum necessary to install the utility line. The work area authorized by this general permit, including temporary access roadways, will be minimized to the greatest extent practicable. In no case will the work corridor width exceed forty (40) feet. h. This general permit does authorize temporary roadway access, as determined by the District Engineer, to be essential for maintenance, repair and/or installation of utility lines. (1) Temporary access roadways will not span more than one-half way across any waters or wetlands at any one time. (2) Temporary access roadways will be constructed of non-erodible materials. i. Material resulting from trench excavation may be temporarily sidecast into waters of the U.S. provided that the material is not placed in such a manner that it is dispersed by currents or other forces. J. In wetlands, the top 6" to 12" of the trench will be backfilled with topsoil from the trench. k. Measures will be taken to prevent live or fresh concrete from coming into contact with waters of the State until the concrete has hardened. 1. Stabilization will be required immediately on completion of each individual utility line crossing. Any exposed slopes and streambanks must be stabilized immediately upon installation of the utility line. -4- v. This general permit does not relieve the permittee from the responsibility of obtaining an easement to cross navigable waters from the North Carolina Department of Administration, State Property Office, pursuant to North Carolina General Statutes 143-341 (4), 146-11 and 146-12. 2. General Conditions. a. There will be no unreasonable interference with navigation or the right of the public to riparian access by the existence or use of activities authorized by this general permit. b. A permittee, upon receipt of written notice from the Wilmington District Engineer of failure to comply with the terms or conditions of this general permit, will, within 60 days, without expense to the U.S. Government, and in such manner as the Wilmington District Engineer may direct, affect compliance with the terms and conditions or return the worksite to a pre-work condition. C. The permittee must make every reasonable effort to perform the work authorized herein in a manner so as to minimize any adverse impact on fish, wildlife and natural environmental values. d. The permittee must perform the work authorized herein in a manner so as to minimize any degradation of water quality. The activity will be conducted in such a manner as to prevent a significant increase in turbidity outside the area of construction or construction-related discharge. Increases such that the turbidity in the waterbody is 50 NTU's or less in all rivers not designated as trout waters by the North Carolina Division of Environmental Management (NCDEM), 25 NTU's or less in all saltwater classes and in all lakes and reservoirs, and 10 NTU's or less in trout waters, are not considered significant. e. The permittee will permit the Wilmington District Engineer or his representative to make periodic inspections at any time deemed necessary in order to assure that the activity is being performed or maintained in strict accordance with the Special and General Conditions of this permit. f. This general permit does not convey any rights, aither in real estate or material, or any exclusive privileges; and it does not authorize any injury to property or invasion of rights or any infringement of Federal, State or local laws or regulations, nor does it obviate the requirement to obtain State or local assent required by law for the activity authorized herein. These may include, but are not necessarily limited to, a Dredge and/or Fill Permit (N.C.G.S. 113-229), a Coastal Area Management Act (LAMA) Permit (N.C.G.S. 113A-118), an Easement to Fill (N.C.G.S. 146-12) and a Water Quality Certification pursuant to Section 401 of the Clean Water Act. g. Authorization provided by this general permit may be either modified, suspended or revoked in whole or in part if the Wilmington District Engineer, acting on behalf of the Secretary of the Army, determines that such action would be in the best public interest. Unless subject to modification, suspension or revocation, the term of this general permit shall be five years. Any modification, suspension or revocation of this authorization will not be the basis for any claim for damages against the U.S. Government. -3- m. Appropriate erosion and sedimentation control measures, in accordance with State standards as directed by the North Carolina Division of Environmental Management, will be employed whenever excavated or fill materials are discharged in or near waters or wetlands. n. This general permit does not authorize the discharge of fill material for roadways or any excavation of channels in navigable waters of the United States, waters subject to Section 10 of the Rivers and Harbors Act of 1899. Equipment operating in such waters must work from barges or wooden mats. o. This general permit does not authorize the discharge of excavated or fill material in fin fish or shrimp nursery areas or areas subject to anadromous fish spawning runs during the period between March 1 and November 15 of any year. This general permit does not authorize the discharge of excavated or fill material in designated trout waters during the period between November 1 and April 15 of any year. p. This general permit does not authorize any work which would adversely affect any public water supply intake. q. In areas where a subaqueous utility line is to cross a Federally- maintained channel, i.e., the Atlantic Intracoastal Waterway (AIWW), it will be buried at a minimum depth of six (6) feet below the depth of the authorized channel. In other areas where subaqueous lines are subject to interfere with navigation, they will be installed at a minimum depth of two (2) feet below the substrate. r. The minimum clearance for aerial communication lines, or any lines not transmitting electrical power, will be ten (10) feet above the clearance required for bridges in the vicinity as established by the U.S. Coast Guard. s. The clearance for an aerial line is based on the low point of the line under conditions which produce the greatest sag, taking into consideration temperature, load, wind, length or span and the type of supports. The minimum clearance for an aerial electrical power transmission line will be governed by the system voltage as indicated below: Nominal System Minimum Clearance Voltage, kilovolt Above Bridge Clearance (As Established by the U.S. Coast Guard) 115 and below 20 feet 138 22 161 24 230 26 350 30 500 35 700 42 750 to 765 45 t. The District Engineer reserves the right to require that subaqueous lines be placed at greater depths or aerial lines be placed at greater heights if the general public interest so indicates. u. This general permit does not apply to utility lines that are a part of a water power project. Federal authorization for such lines must be obtained from the U.S. Department of Energy. -5- h. This general permit does not authorize the interference with any existing or proposed Federal project and the permittee will not be entitled to compensation for damages or injury to the structures or work authorized herein which may be caused by or result from existing or future operations undertaken by the United states in the public interest. i. This general permit will not be applicable to proposed construction when the Wilmington District Engineer determines that the proposed activity would significantly affect the quality of the human environment and determines that an Environmental Impact Statement (EIS) must bs prepared. J. This general permit will not be applicable to proposed construction when the Wilmington District Engineer determines, after any necessary investigations, that the proposed activity would adversely affect areas which possess historic, cultural, scenic, conservation or recreational values. Application of this exemption applies to: (1) Rivers named in Section 3 of the Wild and Scenic Rivers Act (15 U.S.C. 1273), those proposed for inclusion as provided by Sections 4 and 5 of the Act and wild, scenic and recreational rivers established by State and local entities. (2) Historic, cultural or archeological sites listed in or eligible for inclusion in the National Register of Historic Places as defined in the National Historic Preservation Act of 1966 and its codified regulations, the National Historic Preservation Amendment Acts of 1980 and 1992, the Abandoned Shipwreck Act of 1987 and the Native American Graves Protection and Repatriation Act. (3) Sites included in or determined eligible for listing in the National Registry of Natural Landmarks. (4) Endangered or threatened species or habitat of such species as determined by the Secretaries of Interior or Commerce and concerned in accordance with the Endangered Species Act (16 U.S.C. 1531). k. Permittees are advised that development ac?livities in or near a floodway may be subject to the National Flood tnaurance Program which prohibits any development, including fill within a floodway that results in any increase in base flood elevations. 1. At his discretion, the Wilmington District Engineer may determine that this general permit will not be applicable to a specific construction proposal. In such case, the procedure for ,,processing an individual permit accordance with 33 CFR 325 will be avai e. BY AUTHORITY OF THE SECRETARY OF THE r Geor L. Cajig Colo el, Corps of ngineers District Engineer in