HomeMy WebLinkAbout20160981 Ver 2_RES Followup Memo Fencing done_20190816fires
August 16, 2019
Katie Merritt
NCDEQ — Division of Water Resources
512 N. Salisbury Street, Archdale Building 91h Floor
Raleigh, NC 27604
302 Jefferson Street, Suite 110
Raleigh, NC 27605
Corporate Headquarters
6575 West Loop South, Suite 300
Bellaire, TX 77401
Main: 713.520.5400
RE: Uzzle As -built Walk Thru Follow -Up Memo (DWR # 2016-098lv2)
Ms. Merritt,
In response to your email dated July 9th, 2019, regarding the incomplete required items at the
Uzzle Mitigation Site, RES has prepared this memo to address the following points with RES'
responses written in blue:
EBX needs to finish the cattle exclusion fencing along the right -side of the project that
runs parallel to the pipeline easement. The BPDP was approved noting that fencing is
required around the entirety of the conservation easement. The fence that runs parallel to
the pipeline easement has been complete and conservation easement placards were
installed along the entire easement boundary. Photographic documentation are included
on Page 2.
Please let me know if you need any additional information.
Thank you,
Jamey McEachran I Ecology Manager
res.us
2