Loading...
HomeMy WebLinkAbout20160981 Ver 2_RES Followup Memo Fencing done_20190816fires August 16, 2019 Katie Merritt NCDEQ — Division of Water Resources 512 N. Salisbury Street, Archdale Building 91h Floor Raleigh, NC 27604 302 Jefferson Street, Suite 110 Raleigh, NC 27605 Corporate Headquarters 6575 West Loop South, Suite 300 Bellaire, TX 77401 Main: 713.520.5400 RE: Uzzle As -built Walk Thru Follow -Up Memo (DWR # 2016-098lv2) Ms. Merritt, In response to your email dated July 9th, 2019, regarding the incomplete required items at the Uzzle Mitigation Site, RES has prepared this memo to address the following points with RES' responses written in blue: EBX needs to finish the cattle exclusion fencing along the right -side of the project that runs parallel to the pipeline easement. The BPDP was approved noting that fencing is required around the entirety of the conservation easement. The fence that runs parallel to the pipeline easement has been complete and conservation easement placards were installed along the entire easement boundary. Photographic documentation are included on Page 2. Please let me know if you need any additional information. Thank you, Jamey McEachran I Ecology Manager res.us 2