HomeMy WebLinkAbout20160372 Ver 2_USACE Correspondence_20190821Strickland, Bev From: Browning, Kimberly D CIV USARMY CESAW (US) RFP: <Kimberly.D.Browning@usace.army.mil> Sent: Wednesday, August 21, 2019 3:18 PM To: Tugwell, Todd J CIV USARMY CESAW (US); Kim Browning; Wells, Emily N; River Basin: kathryn_matthews@fws.gov; Wilson, Travis W.; Poupart, Jeff, McLendon, C S CIV CU#: USARMY CESAW (USA); Wicker, Henry M Jr CIV USARMY CESAW (US); Crumbley, Tyler A CIV USARMY CESAW (USA); Gledhill-earley, Renee; Matthews, Monte K CIV USARMY CESAW (USA); Merritt, Katie; Haupt, Mac; Davis, Erin B Cc: Crocker, Lindsay; Baumgartner, Tim; Tim Morris Subject: [External] Notice of_NCDMS Record Drawing / Stony Fork Mitigation Site/ SAW -2016-00875/ Johnston County (UNCLASSIFIED) Follow Up Flag: Follow up Flag Status: Flagged CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov<maiIto: report.spam@nc.gov> CLASSIFICATION: UNCLASSIFIED The below referenced FINAL Baseline Report and Record Drawing (formerly known as As -Built) review has been requested by NCDMS. Per Section 332.8(0)(9) of the 2008 Mitigation Rule, this review follows the streamlined review process, which requires an IRT review period of 15 calendar days from this email notification. Please provide any comments by 5 PM on the 15 -day comment deadline shown below. When providing comments please indicate if your concerns are great enough that you intend to request a site visit prior to the initial credit release. Comments provided after the 15 -day comment deadline (shown below) may not be considered. At the conclusion of this comment period, a copy of all comments will be provided to NCDMS and the NCIRT along with District Engineer's intent to approve or disapprove this Final Record Drawing and initial credit release. Name: Stony Fork RFP: 16-006477 RFP Issued: 6/24/2015 Project#: 97085 River Basin: Neuse CU#: 03020201 County: Johnston Mitigation Plan Assets -6,586 SMU and 480,338 riparian buffer credits Provider: KCI Associates of NC, PA DMS Project Manager: Lindsay Crocker lindsay.crocker@ncdenr.gov There was no recorded change to assets. Link to Stony Fork As -Built on SharePoint https://ncconnect.sharepoint.com/:f:/r/sites/deq_ext/dwm_irt/AsBuilt Report Drawing/Stony Fork 97085?csf=1&e=oAC11P 15 -Day Comment Start Date: August 21, 2019 15 -Day Comment Deadline: September 5, 2019 45 -Day Credit Release Approval Deadline: October 5, 2019 *NOTE: If a site visit is requested by the IRT, comments are due 15 days after the site visit is complete. Mitigation Plan lengths may vary from the Record Drawing. Kim Browning Mitigation Project Manager, Regulatory Division I U.S. Army Corps of Engineers 3331 Heritage Trade Dr, Ste. 105 1 Wake Forest, NC 27587 1 919.554.4884 x60 BUILDING STRONG (r) CLASSIFICATION: UNCLASSIFIED