HomeMy WebLinkAbout20160372 Ver 2_USACE Correspondence_20190821Strickland, Bev
From:
Browning, Kimberly D CIV USARMY CESAW (US)
RFP:
<Kimberly.D.Browning@usace.army.mil>
Sent:
Wednesday, August 21, 2019 3:18 PM
To:
Tugwell, Todd J CIV USARMY CESAW (US); Kim Browning; Wells, Emily N;
River Basin:
kathryn_matthews@fws.gov; Wilson, Travis W.; Poupart, Jeff, McLendon, C S CIV
CU#:
USARMY CESAW (USA); Wicker, Henry M Jr CIV USARMY CESAW (US); Crumbley, Tyler
A CIV USARMY CESAW (USA); Gledhill-earley, Renee; Matthews, Monte K CIV USARMY
CESAW (USA); Merritt, Katie; Haupt, Mac; Davis, Erin B
Cc:
Crocker, Lindsay; Baumgartner, Tim; Tim Morris
Subject:
[External] Notice of_NCDMS Record Drawing / Stony Fork Mitigation Site/
SAW -2016-00875/ Johnston County (UNCLASSIFIED)
Follow Up Flag: Follow up
Flag Status: Flagged
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an
attachment to report.spam@nc.gov<maiIto: report.spam@nc.gov>
CLASSIFICATION: UNCLASSIFIED
The below referenced FINAL Baseline Report and Record Drawing (formerly known as As -Built) review has been
requested by NCDMS. Per Section 332.8(0)(9) of the 2008 Mitigation Rule, this review follows the streamlined review
process, which requires an IRT review period of 15 calendar days from this email notification. Please provide any
comments by 5 PM on the 15 -day comment deadline shown below. When providing comments please indicate if your
concerns are great enough that you intend to request a site visit prior to the initial credit release. Comments provided
after the 15 -day comment deadline (shown below) may not be considered.
At the conclusion of this comment period, a copy of all comments will be provided to NCDMS and the NCIRT along with
District Engineer's intent to approve or disapprove this Final Record Drawing and initial credit release.
Name:
Stony Fork
RFP:
16-006477
RFP Issued:
6/24/2015
Project#:
97085
River Basin:
Neuse
CU#:
03020201
County: Johnston
Mitigation Plan Assets -6,586 SMU and 480,338 riparian buffer credits
Provider: KCI Associates of NC, PA
DMS Project Manager: Lindsay Crocker lindsay.crocker@ncdenr.gov
There was no recorded change to assets.
Link to Stony Fork As -Built on SharePoint https://ncconnect.sharepoint.com/:f:/r/sites/deq_ext/dwm_irt/AsBuilt Report
Drawing/Stony Fork 97085?csf=1&e=oAC11P
15 -Day Comment Start Date: August 21, 2019 15 -Day Comment Deadline: September 5, 2019 45 -Day Credit Release
Approval Deadline: October 5, 2019
*NOTE: If a site visit is requested by the IRT, comments are due 15 days after the site visit is complete.
Mitigation Plan lengths may vary from the Record Drawing.
Kim Browning
Mitigation Project Manager, Regulatory Division I U.S. Army Corps of Engineers
3331 Heritage Trade Dr, Ste. 105 1 Wake Forest, NC 27587 1 919.554.4884 x60