HomeMy WebLinkAboutwq0028587_Permit (Modification)_20131219W
IBC- D N
NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
-Division of Water Resources
Water Quality Programs
Pat McCrory Thomas A. Reeder John E. Skvarla, III
Governor Director Secretary
December 19, 2013
David A. Hollis, Town Manager
Town of Leland
102 Town Hall Drive
Leland, NC 28451
Subject: Permit No. WQ0028587 MODIFICATION
Town of Leland
Brunswick Forest Sewer
Wastewater Collection System Extension
Brunswick County
Dear Mr. Hollis:
In accordance with your application received November 21, 2013 we are forwarding herewith Permit
No. Permit No. WQ0028587, dated December 19, 2013, to the Town of Leland for the construction and
operation of the subject wastewater collection system extension. This permit shall be effective from the
date of issuance until rescinded, shall void Permit No. WQ0028587 issued October 9, 2013, and shall be
subject to the conditions and limitations as specified therein. This cover letter shall be considered a part
of this permit and is therefore incorporated therein by reference.
This modification adds approximately 1,766 linear feet of 8-inch gravity sewer to serve 43 three -
bedroom single-family residences and the discharge of 9,030 gallons per day.
Please pay particular attention to the following conditions contained within this permit: 3
Standard Conditions:
Condition 11.1: This permit shall not be automatically transferable; a request must be made and
approved.
Condition 11.4: Requires that the wastewater collection facilities be properly operated and maintained
in accordance with 15A NCAC 2T .0403 or any individual system -wide collection system
permit issued to the Permittee.
Wilmington Regional Office
127 Cardinal Drive Extension Wilmington, NC 28405
Phone: 910-796-7215./ FAX: 910-350-2004
Internet: www.ncwaterguality.org
An Equal Opportunity/Affirmative Action Employer
50% Recycled/10% Post Consumer Paper
NorthCaroli.na
Naturally
Town of Leland
Permit No. WQ0028587 MODIFICATION
Condition 11.9: Each pump station shall be clearly and conspicuously posted using a weatherproof sign
with a pump station identifying name/number, 24-Hour Emergency telephone number,
and name of the owner/operator of the sewer system/pump station and instructions to
call the number in the event of alarm activation or other emergency.
It shall be responsibility of the Town of Leland to ensure that the as -constructed project meets the
appropriate design criteria and rules. Failure to comply may result in penalties in accordance with North
Carolina General Statute §143-215.6A through §143-215.6C, construction of additional or replacement
wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to
the licensing board.
If any parts, requirements, -or limitations contained in this permit are unacceptable, you have the right
to request an adjudicatory hearing upon written request within 30 days following receipt of this permit.
This request must be in the form of a written petition, conforming to Chapter 150E of North Carolina
General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center Raleigh,
NC 27699-6714. Unless such demands are made, this permit shall be final and binding.
If you need additional information concerning this matter, please contact Dean Hunkele at (910) 796-
7215 or via e-mail at Dean.Hunkele@ncdenr.gov
Si rely, .
for Thomas eecler
Division of Water Resources
by James H. Gregson
Wilmington Region Water Quality Supervisor
Cc: David S. Hollis, P.E., Hanover Design Services
Jerry Pierce, Brunswick County Public Utilities
/Ji3Q iirface.lNater Protection--_Northeasf:Brunswick_Regional'(N000868T9)_Sewer.Ext: File
Central Files, Surface Water Protection Section
Michael Leggett, PERCS Unit (via e-mail)
Page 2 of 13
TW
I�DETdR
STATE OF NORTH CAROLINA
ENVIRONMENTAL MANAGEMENT COMMISSION
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
WASTEWATER COLLECTION SYSTEM EXTENSION PERMIT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as
amended, and other applicable Laws, Rules, and Regulations, permission is hereby granted to the
TOWN OF LELAND
BRUNSWICK COUNTY
for the construction and operation of approximately'1,766 linear feet of 8-inch gravity sewer to serve 43
three -bedroom single-family residences as part of the Brunswick Forest Phase 1 Section 6B project, and
the discharge of 9,030 gallons per day of collected domestic wastewater into the Town of Leland's
existing sewerage system, pursuant to the application received November 21, 2013 and in conformity
with 15A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as
applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and
Force Mains adopted June 1, 2000 as applicable; and other supporting data subsequently filed and
approved by the Department of Environment and Natural Resources and considered a part of this
permit.
AND
October 9, 2013 Modification (Version 3.4)
For the continued construction and operation upon certification of approximately 5,685 linear feet of fl-
inch gravity sewer to serve 101 three -bedroom single-family residences and 22 three -bedroom duplex
units as part of the Brunswick Forest Phase2 Section 2 project, and the discharge of 25,830 gallons per
day of collected domestic wastewater into the Town of Leland's existing sewerage system, pursuant to
the application received August 29, 2013 and additional information received on September 4, 2013.
March 6, 2013 Modification (Version 3.3)
For the continued construction and operation upon certification of approximately 208 linear feet of 8-
inch gravity sewer to serve a medical office on Lot 10 of the South Village commercial area as part of the
South Village Lot 10 project, and the discharge of 750 gallons per day of collected domestic wastewater
into the Town of Leland's existing sewerage system, pursuant to the application received January 24,
2013, and additional information received on January 30, 2013.
March 21, 2012 Modification (Version 3.2)
For the continued construction and operation upon certification of approximately 4,411,linear feet of fl-
inch gravity sewer, to serve 87 three -bedroom residences (18,270 gpd), 32 three -bedroom townhomes
(6,720 gpd), and 4 buildings with a total of 16 multi -family units (3,360 gpd) as part of the Brunswick
Forest Phase 2B Section 1 project, and the discharge of 28,350 gallons per day of collected domestic
wastewater into the Town of Leland's existing sewerage system, pursuant to the applications received
March 5, 2012.
Page 3 of 13
April 21, 2011 Modification (Version 3.1)
A
For the continued operation of approximately 679 linear feet of 8-inch gravity sewer, to serve 13 three -
bedroom residences (70 gpd/bedroom), as part of the Brunswick Forest Phase 1 section 6A project, and
the discharge of 1,820 gallons per day of collected domestic wastewater into the Town of Leland's
existing sewerage system, pursuant to the applications received March 30, 2011. This system was
certified as complete on June 30, 2011.
February 13, 2009 Modification (Versions 2.9 and 3.0)
For the construction and operation upon certification of approximately 4,765 linear feet of 12-inch
gravity sewer, 13,696 linear feet of 8-inch gravity sewer; a 450—gallon per minute pump station with
duplex pumps, on -site audible and visual high water alarms, telemetry, and on -site generator with
automatic transfer switch with approximately 9,805 linear feet of 8-inch force main to serve 193
three -bedroom residences, maintenance shed with wash bay, golf course restrooms, and a country club
with food service as part of the Brunswick Forest Phase 3B & Country Club project, and the discharge of
79,570 gallons per day of collected domestic wastewater into the Town of Leland's existing sewerage
system, pursuant to the applications received January 26, and 27, 2009.
February 6, 2009 Modification (Version 2.8)
Continued operation of approximately 3,988 linear feet of 8-inch gravity sewer to 48 three -bedroom
residences (17,280 gpd) and 72 two -bedroom residences (17,280 gpd) as part of the Brunswick Forest
Phase 1 Section 2 Village 2-A Sewer project, and the discharge of 34,560 gallons per day of collected
domestic wastewater into the Town of Leland's existing sewerage system, pursuant to the application
received January 9, 2009. This system was certified as complete on May4, 2009.
January 30, 2009 Modification (Version 2.7)
The continued construction operation upon certification of approximately 13,192 linear feet of 8-inch
gravity sewer, approximately 1,564 linear feet of 10-inch gravity sewer, approximately 2,531 linear feet
of 12-inch gravity sewer; a 550—gallon per minute pump station with duplex pumps, on -site audible and .
visual high water alarms, telemetry, on -site generator with automatic transfer switch with
approximately 10,325 linear feet of 10-inch force main to serve 324 residential lots x 360 gpd/lot as part
of the Brunswick Forest Phase 5A Pump Station and Force Main Sewer project, and the discharge of
116,640 gallons per day of collected domestic wastewater into the Town of Leland's existing sewerage
system, pursuant to the application received December 22, 2008.
October 17, 2008 Modification (Version 2.6)
Continued operation of approximately 4,607 linear feet of 8-inch gravity sewer to serve as a gravity
sewer outfall or interceptor line for future upstream or tributary sewer systems as part of The Villages at
Brunswick Forest project with no additional discharge of collected domestic wastewater into Town of
Leland's existing sewerage system, pursuant to the application received September 26, 2008. This
system was certified as complete on December 8, 2008 & updated May 4, 2009.
August 1, 2008 Modification (Version 2.5)
Continued operation of approximately 599 linear feet of 8-inch gravity sewer to serve a 3,511 gallons
per day medical office building as part of the South Village Phase-1 project, and the discharge of 3,511
gallon per day of collected domestic wastewater into the Town of Leland's existing sewerage system,
pursuant to the application received June 19, 2008. This system was certified as complete on May 4,
2009.
Page 4 of 13
July 18, 2008 Modification (Version 2.4) '
i•
Continued operation of approximately 1,630 linear feet of 8-inch gravity -sewer to serve a 49,170 sf
Grocery Store (4,920 gpd), 84,370 sf of Retail Space with no food services (8,437 gpd), a 13,225 sf
Pharmacy (1,325 gpd), a 30 space Restaurant Drive-Thru (1,500 gpd) and a 50 seat Restaurant (2,000
gpd) as part of the East -Village Phase-1 project, and the discharge of 18,182 gallon per day of_collected
domestic wastewater into the Town of Leland's existing sewerage system, pursuant to the application
received June 19; 2008. This system was certified as complete on September 27,2011.
October 12, 2007 Modification (Version 2.3)
The continued. operation of approximately 1,174 linear feet of 8-inch gravity sewer to serve 62 three -
bedroom and 10_two-bedroom residences as part of the Phase 1 Section 2 Village 4-A project, and the
discharge of 24,720 gallons per day of collected domestic wastewater into the Town of Leland's existing
sewerage system, pursuant to the application received September 18, 2007. This system was certified
as complete on July 31, 2008 and updated May 8, 2009.
September 7, 2007 Modification (Version 2.2)
Continued operation of approximately 2,952 linear feet of 8-inch gravity sewer to serve 72 three -
bedroom residences as part of the Phase 1 Section 2 Village 1-A project, and the discharge of 25,920
gallons per day of collected domestic wastewater into the Town of Leland's existing sewerage system,
pursuant to the application received July 25, 2007. This system was certified complete on July 31, 2008.
June 8, 2007 Modification (Version 2.1)
Continued operation of approximately 1,393 linear feet of 8-inch gravity sewer to serve Lots 1 & 2 for a
bank with 10 employees (250 gpd) and an unspecified development on the other (will require allocation
to be added prior to connection) as part of the East Village Commercial Center project, and the
discharge of 250 gallons per day of collected domestic wastewater into the Town of Leland's existing
sewerage system, pursuant to the application received May 16, 2007. This system was certified as
complete on December 6, 2007.
April 20, 2007 Modification (Version 2.0)
Continued -operation of approximately 5,065 linear feet of 8-inch gravity sewer to serve 94 three -
bedroom single-family residences as part of the Brunswick Forest Phase 1 Section 3 project, and the
discharge of 33,840 gallons per day of collected domestic wastewater into the Town of Leland's existing
sewerage system, pursuant to the application received March 29, 2007. This system was. certified as
complete on August 6, 2008.
April 13, 2007 Modification (Version 1.9)
Continued operation of approximately 5,126 linear feet of 8-inch gravity sewer to serve 56 three -
bedroom single-family residences and 30 three -bedroom & 30 two -bedroom townhomes as part of the
Brunswick Forest Phase 6 Sections 1-B & 2 project, and the discharge of 38,610 gallons per day of
collected domestic wastewater into the Town of Leland's existing sewerage system, pursuant to the
application received March 9, 2007. This system was certified as complete on November 30, 2007.
Page 5 of 13
December 22, 2006 Modification (Version 1.8) ,
Continued operation of approximately 13,874 linearifeet of 8-inch gravity sewer; a 387—gallon per
minute pump station with duplex pumps, on -site audible and visual high water alarms, telemetry, and
on -site generator with automatic transfer switch; as well as approximately 3,520 linear feet of 6-inch
force main to serve 193 three -bedroom residences as part of the Brunswick Forest Phase 1 Section 2
project, and the discharge of 69,480 gallons per day of collected domestic wastewater into the Town of
Leland's existing sewerage system, pursuant to the application received December 1, 2006. This system
was certified as complete on May 4, 2009.
October 27, 2006 Modification (Version 1.6)
Continued operation of approximately 1,008 linear feet of 8-inch gravity sewer to serve future
development including a sales center & wellness facility in Brunswick Forest Phase 6 Section 1-A as part
of the Brunswick Forest project and the discharge of 800 gallons per day of collected domestic
wastewater into the Town of Leland's existing sewerage system, pursuant to the application received
September 15, 2006. This system was certified as complete on June 15, 2007.
May 26, 2006 Modification (Version 1.5)
Continued operation of approximately 5,926 linear feet of 8-inch gravity sewer; a 380—gallon per minute
pump station with duplex pumps, on -site audible and visual high water alarms, telemetry, and on -site
generator with automatic transfer switch; as well as approximately 3,915 (increased from 2,821 feet per
modification issued November 3. 2006) linear feet of 6-Inch force main to serve 149 three -bedroom
residences as part of the Jefferson Landing at Brunswick Forest Phase 2 (aka Phase 1 Section 1-B)
project, and the discharge of 53,640 gallons per day of collected domestic wastewater into the Town of
Leland's existing sewerage system, pursuant to the application originally received April 24, 2006 and
subsequent modification request received September 25, 2006. This system was certified as complete
on March 27, 2007.
April 7, 2006 Modification (Version 1.4)
Continued operation of approximately 793 linear feet of 10-inch, and 2,329 (reduced from 3,830) linear
feet of 12-inch gravity sewer to serve as a gravity sewer outfall or interceptor line for future upstream or
tributary sewer systems as part of the Brunswick Forest Phase 3A project with no additional discharge
of collected domestic wastewater into the Town of Leland's existing sewerage system, pursuant to the
application received February 16, 2006. This system was certified as complete on March 15, 2007.
March 10, 2006 Modification (Version 1.3)
Continued operation of approximately 6,741 linear feet of 8-inch gravity sewer to serve 131-three-
bedroom residences as part of the Jefferson Landing at Brunswick Forest Phase 1 (aka Phase 1 Section
1-A) project, and the discharge of 47,160 gallons per day of collected domestic wastewater into the
Town of Leland's existing sewerage system, pursuant to the application received February 14, 2006.
This system was certified as complete on December 22, 2006.
July 21, 2005 Modification (Version 1.2)
Continued operation of approximately 25 linear feet of 8-inch and 3,290 linear feet of 12-inch gravity
sewer to serve as a gravity sewer outfall or interceptor line for future development upstream of the
previously approved sewer listed below as part of the Brunswick Forest Phase 2 project, and with no
additional discharge of collected wastewater into the Town of Leland's existing sewerage system,
pursuant to the application received June 15, 2005. This system was certified as complete on
December 8, 2008.
Page 6 of 13
March 24, 2005 Original Permit (Versions 1.0 & 1.1) '
i
Continued operation of approximately 868 linear feet of 8-inch, 3,414 linear feet of 10-inch, and 3,141
linear feet of 12-inch gravity sewer; a 1500—gallon per minute pump station with duplex pumps, on -site
audible and visual high water alarms, telemetry/autodialer, and on -site generator with automatic
transfer switch; as well as approximately 20,650 total linear feet of 10-inch force main. (dual force mains)
to serve this large residential and commercial development as part of the Brunswick Forest Phase 1
project with no discharge of wastewater into the Town of Leland's existing sewerage system, pursuant
to the application received March 11, 2005. This system was certified as complete on March 15, 2007.
From the original permit 25,257 qpd of commercial flow_ allocation remains in reserve from the October
17, 2008 modification.
In summary, this permit authorizes the potential connection of 1,572 three -bedroom & 112 two -
bedroom residences, a sales center, a wellness facility, a bank, a garden center, grocery store, retail
space, pharmacy, restaurant drive-thru, a restaurant and two medical office buildings for a total
discharge of 615,663 gallons per, day.
This permit shall be effective from the date of issuance until rescinded and shall be subject to the
specified conditions and limitations contained therein-.
Permit Number: WQ0028587
Issued T . December 19, 2013
r T omas q,Reeder
Division o a er Resources
by James H. Gregson
Wilmington Region Water Quality Supervisor
Page 7 of 13
SUPPLEMENT TO'PERMIT COVER SHEET
TOWN OF LELAND is hereby authorized to:
Construct, and then operate upon certification the aforementioned wastewater collection extension.
The sewage and wastewater collected by this system shall be treated in the Northeast Brunswick
Regional Wastewater Treatment Facility (Permit No. NC0086819) prior to being discharged into the
receiving stream.
Permitting of this project does not constitute an acceptance of any part of the project that does not
meet 15A NCAC 2T; the Division of Water Resources' (Division) Gravity Sewer Minimum Design Criteria
adopted February 12, 1996 as applicable; and the Division's Minimum Design Criteria for the Fast -Track
Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable, unless specifically
mentioned herein. Division approval is based on acceptance of the certification provided by a North
Carolina -licensed Professional Engineer in the application. It shall be the Permittee's responsibility to
ensure that the as -constructed project meets the appropriate design criteria and rules.
Construction and operation is contingent upon compliance with the Standard Conditions and any Special
Conditions identified below.
I. SPECIAL CONDITIONS
1. A Stormwater Management Plan shall be applied for and obtained in accordance with 15A NCAC 2H
.1000 where applicable.
2. This permit shall become voidable unless the agreement between the Town of Leland and Brunswick
County for the collection and final treatment of wastewater is in full force and effect.
II. STANDARD CONDITIONS
1. This permit shall not be transferable. In the event there is a desire for the wastewater collection
facilities to change ownership, or there is a name change of the Permittee, a formal permit request
shall be submitted to the Division accompanied by documentation from the parties involved, and
other supporting materials as may be appropriate. The approval of this request shall be considered
on its merits and may or may not be approved.
2. This permit shall become voidable unless the wastewater collection facilities are constructed in
accordance with the conditions of this permit; 15A NCAC 2T; the Division of Water Resources'
(Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; the
Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains
adopted June 1, 2000 as applicable; and other supporting materials unless specifically mentioned
herein.
3. This permit shall be effective only with respect to the nature and volume of wastes described in the
application and other supporting data.
Page 8 of 13
4. The wastewater collection facilities shall be prope"rly maintained and operated at all times. The
Permittee shall maintain compliance with an fndividual system -wide collection system permit for the
operation and maintenance of these facilities as required by 15A NCAC 2T .0403. If an individual
permit is not required, the following performance criteria shall be met as provided in 15A NCAC 2T
.0403:
a. The sewer system shall be effectively maintained and operated at all times to prevent discharge
to land or surface waters, and to prevent any contravention of groundwater standards or
surface water standards.
b. A map of the sewer system shall be developed and shall be actively maintained.
c. An operation and maintenance plan including pump station inspection frequency, preventative
maintenance schedule, spare parts inventory and overflow response has been developed and
implemented.
d. Pump stations that are not connected to a telemetry system shall be inspected every day (i.e.
365 days per year). Pump stations that are connected to a telemetry system shall be inspected
at least once per week.
e. High -priority sewer lines shall be inspected at least once per every six -months and inspections
are documented.
f. A general observation of the entire sewer system shall be conducted at least once per year.
g. Overflows and bypasses shall be reported to the appropriate Division regional office in
accordance with 15A NCAC 2B .0506(a), and public notice shall be provided as required by -North
Carolina General Statute §143-215.1C.
h. A Grease Control Program is in place as follows:
1. For public owned collection systems, the Grease Control Program shall include at least
biannual distribution of educational materials for both commercial and residential users and
the legal means to require grease interceptors at existing establishments. The plan shall also
include legal means for inspections of the grease interceptors, enforcement for violators and
the legal means to control grease entering the system from other public and private satellite
sewer systems.
2. For privately owned collection systems,.the Grease Control Program shall include at least bi-
annual distribution of grease education materials to users of the collection system by the
permittee or its representative.
3. Grease education materials shall be distributed more often than required in Parts (1) and (2)
of this Subparagraph if necessary to prevent grease -related sanitary sewer overflows.
i. Right-of-ways and easements shall be maintained in the full easement width for personnel and
equipment accessibility.
j. Documentation shall be kept for Subparagraphs (a) through (i) of this Rule for a minimum of
three years with exception of the map, which shall be maintained for the life of the system.
Page 9 of 13
5. Noncompliance Notification:
The Permittee shall report by telephone to a water quality staff member at the Wilmington Regional
Office, telephone number (910) 796-7215, as soon as possible, but in no case more than 24 hours or
on the next working day, following the occurrence or first knowledge of the occurrence of either of
the following:
a. Any process unit failure, due to known or unknown reasons, that renders the facility
incapable of adequate wastewater transport, such as mechanical or electrical failures of
pumps, line blockage or breakage, etc.; or
b. Any SSO and/or spill over 1,000 gallons; or
c. Any SSO and/or spill, regardless of volume, that reaches surface water
Voice mail messages or faxed information is permissible, but this shall not be considered as the
initial verbal report. Overflows and spills occurring outside normal business hours may also be
reported to the Division of Emergency Management at telephone number (800) 858-0368 or (919)
733-3300. Persons reporting any of the above occurrences shall file a spill report by completing and
submitting Part I of Form CS-SSO (or the most current Division approved form) within five days
following first knowledge of the occurrence. This report must outline the actions taken or proposed
to be taken to ensure that the problem does not recur. Part II of Form CS-SSO (or the most current
Division approved form) can also be completed to show that the SSO was beyond control.
6. Construction of the gravity sewers, pump stations, and force mains shall be scheduled so as not to
interrupt service by the existing utilities nor result in an overflow or bypass discharge of wastewater
to the surface waters of the State.
7. Gravity sewers installed greater than ten percent below the minimum required slope per the
Division's Gravity Sewer Minimum Design Criteria shall not be acceptable and shall not be certified
until corrected. If there is an unforeseen obstacle in the field where all viable solutions have been
examined, a slope variance can be requested from the Division with firm supporting documentation.
This shall be done through a permit modification with fee. Such variance requests will be evaluated
on a case -by -case basis. Resolution of such request shall be evident prior to completing and
submitting the construction certification.
8. Per 15A NCAC 2T.0116, upon completion of construction and prior to operation of these permitted
facilities, the completed Engineering Certification form attached to this permit shall be submitted
with the required supporting documents to the address provided on the form. A complete
certification is one where the form is fully executed and the supporting documents are provided as
applicable. Any wastewater flow made tributary to the wastewater collection system extension
prior to completion of this Engineer's Certification shall be considered a violation of the permit and
shall subject the Permittee to appropriate enforcement actions.
If the permit is issued to a private entity with an Operational Agreement, then a copy of the
Articles of Incorporation, Declarations/Covenants/Restrictions, and Bylaws that have been
appropriately filed with the applicable County's Register of Deeds office shall be submitted with
the certification.
Page 10 of 13
A complete certification is one where the form is fully executed and the supporting documents are
provided as applicable. Supporting documenilation shall include the following:
a. One copy of the project construction record drawings (plan & profile views of sewer lines &
force mains) of the wastewater collection system extension. Final record drawings should be
clear on the plans or on digital media (CD or DVD disk) and are defined as the design drawings
that are marked up or annotated with after construction information and show required buffers,
separation distances, material changes, etc.
b. One copy of the supporting pump station design calculations (selected pumps, system curve,
operating point, buoyancy calculations, and available storage if portable generator(s) or storage
greater than longest past three year outage reliability option selected) for any pump stations
permitted as part of this project.
c. Changes to the project that do not result in non-compliance with this permit, regulations, or the
Minimum Design Criteria should be clearly identified on the record drawings, on the certification
in the space provided, or in written summary form.
Prior to Certification (Final or Partial): Permit modifications are required for any changes resulting
in non-compliance with this permit (including pipe length increases of 10% or greater, increased
flow, pump station design capacity design increases of 5% or greater, and increases in the
number/type of connections), regulations, or the Minimum Design Criteria. Requested
modifications or variances to the Minimum Design Criteria will be reviewed on a case -by -case basis
and each on its own merit. Please note that variances to the Minimum Design Criteria should be
requested and approved during the permitting process prior to construction. After -construction
requests are discouraged by the Division and may not be approved, thus requiring replacement or
repair prior to certification & activation.
9. A copy of the construction record drawings shall be maintained on file by the Permittee for the life
of the wastewater collection facilities.
10. Per 15A NCAC 2T.0305 (h)(2). each pump station shall be clearly and conspicuously posted using a
weatherproof sign with a pump station identifying name/number, 24-Hour Emergency telephone
number, and name of the owner/operator of the sewer system/pump station and instructions to call
the number in the event of alarm activation or other emergency. Simplex pump stations or vacuum
sewer pits serving a single-family residence may have a placard or sticker on the control panel in lieu
of a sign.
11. Failure to abide by the conditions and limitations contained in this permit; 15A NCAC 2T; the
Division's _Gravity Sewer Design Criteria adopted February 12, 1996 as applicable; the Division's
Minimum Design Criteria for the Fast -Track Permitting of Pump Station and Force Mains adopted
June 1, 2000 as applicable; and other supporting materials may subject the Permittee to an
enforcement action by the Division, in accordance with North Carolina General Statutes §143-215.6A
through §143-215.6C, construction of additional or replacement wastewater collection facilities,
and/or referral of the North Carolina -licensed Professional Engineer to the licensing board.
Page 11 of 13
12. In the event that the wastewater collection facilities fail to perform satisfactorily, including the
creation of nuisance conditions, the Permittee shall take immediate corrective action, including
those as may be required by this Division, such as the construction of additional or replacement
facilities.
13. The issuance of this permit shall not exempt the Permittee from complying with any and all statutes,
rules, regulations, or ordinances that may be imposed by other government agencies (local, state
and federal) which have jurisdiction, including but not limited to applicable river buffer rules in 15A
NCAC 2B .0200, erosion and sedimentation control requirements in 15A NCAC Ch. 4 and under the
Division's General Permit NCG010000, and any requirements pertaining to wetlands under 15A
NCAC 2B .0200 and 15A NCAC 2H .0500.
W
Page 12 of 13
FAST TRACK SEWER ENGINEERING CERTIFICATION
PERMITTEE:
Town of Leland `
PERMIT #:
WQ0028587
PROJECT:
Brunswick Forest — Phase 1 Section 6B
ISSUE DATE:
December 19, 2013
COUNTY:
Brunswick
This project shall not be considered complete nor allowed to operate in accordance with Condition 6 of
this permit until the Division has received this Certification and all required supporting documentation.
Consequently, it should be submitted in a manner that documents the Division's receipt. Send the
required documentation to the Wilmington Regional Supervisor, Water Quality Section at the address at
the bottom.
Any wastewater flow made tributary to the wastewater collection system extension prior to completion
of this Certification shall be considered a violation of the permit and shall subject the Permittee to
appropriate enforcement actions. The Permittee is responsible for tracking all partial certifications up
until a final certification is received. A Final Certification shall be a complete set of record drawings and
design calculations regardless of whether partials have been submitted.
PERMITTEE'S CERTIFICATION
I, the undersigned agent for the Permittee, hereby state that this project has been constructed pursuant
to the applicable standards & requirements, the Professional Engineer below has provided applicable
design/construction information to the Permittee, and the Permittee is prepared to operate & maintain
the wastewater collection system permitted. herein or portions thereof.
Printed Name, Title Signature Date
ENGINEERS CERTIFICATION
I, , as a duly registered Professional Engineer in the State of North Carolina,
having been authorized to observe (❑ periodically, ❑ weekly, ❑ full time) the construction of the
project name and location as referenced above for the above Permittee hereby state that, to the best of
my abilities, due care and diligence was used in the observation of the construction such that the
construction was observed to be built within substantial compliance of this permit; 15A NCAC 2T; the
Division of Water Resources' (Division) Gravity Sewer Minimum Design Criteria adopted February 12,
1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump
Stations and Force Mains adopted June 1, 2000 as applicable; and other supporting materials.
North Carolina Professional Engineer's Seal w/signature & date
❑ Final ❑ Partial
Certification Comments/Qualifiers:
NC Division of Water Resources — Water Quality Section 127 Cardinal Drive Extension Wilmington, NC 28405
Wilmington Regional Office Phone: 910-796-7215 FAX: 910-350-2004
Central Files: APS SWP
11/25/13
Permit number WQ0028587 Permit Tracking Slip
Program Category Status Project Type
Non -discharge In review Major modification
Permit Type Fast Track
Gravity Sewer Extension, Pump Stations, & Pressure Sewer
Extensions
Primary Reviewer
dean.hunkele
Coastal SW Rule
Permitted Flow
606633
Version Permit Classification
W Individual
Permit Contact Affiliation
Facility
Facility Name Major/Minor Region
Brunswick Forest Sewer Minor Wilmington
Location Address County
Brunswick
Facility Contact Affiliation
Owner
Owner Name Owner Type
Town of Leland Government - Municipal
Owner Affiliation
David A. Hollis
PE
102 Town Hall Dr
Dates/Events Leland NC 28451
Scheduled
Orig Issue App Received Draft Initiated Issuance Public Notice Issue Effective Expiration
-
(
USE THE TAB KEY TO MOVE FROM FIELD TO FIELD ' Applicatiori Number:
(to be completed by DWR)
4.
Owner/Permittee:
1a.
Town of Leland
Full Legal Name (company, municipality, HOA, utility, etc.) '
Z-
1b.,
- — - - - - --- -- - ---- - - - - - - -- -- - -=- -
David A. Hollis, PE Town Manager
0
+
Signing Official Name and Title (Please review 15A NCAC 2T .0106 (b) for authorized signing officials)
11c.
Q
The legal entity who will own this system is:
❑ Individual 0 Federal ® Municipality ❑ State/County0 Private Partnership ❑ Corporation 0 Other s eci
0
1d.
102 Town Hall Drive i1e. Leland
LL
Mailing Address ! City
Z
1f.
NO -- ---- ----i1g. 28451 ---------- -
1
State I Zip Code
0
_
1 h.
— — -„ — --- ------------
910-371'-0148 ;1 i. 910-371-1073 ,I j. dhollis townofieland.com
I
Telephone - Facsimile Ij E-mail
V
2.
Project (Facility! -Information:
J
'2a.
Brunswick Forest, Phase 1 Section 613 2b. Brunswick
CL
(
Brief Project Name (permit will refer to this name) ' I County Where Project is Located
Q13.
Contact Person:
3a.
David S. Hollis PE, PLS, Hanover Design Services, PA "
Name and Affiliation of Someone Who Can Answer Questions About this Application
3b.
910-343-8002 „3c. dhollis hdsilm:com:
Phone Number' E-mail
�1.
Project is.❑ New ® Modification (of an existing -permit) -:.If Modification, Permit No.: WQ 00285744CD Dated 7-21-05
2.
Owner is ® Public (skip'to Item B(3)) -❑ Private (go to Item 2(a))
12a.
2b. If sold, facilities owned by a (must choose one)
If pdvate;.applicant will be.
❑ Retaining Ownership (i.e.-store, church, single office, etc.) or
❑Public Utility (Instruction D)
❑ Leasing units (lots, townhomes, etc: - skip to Item B(3))
❑ Homeowner Assoc -!Developer (Instruction E)
❑ Selling units (lots, townhomes, etc. - go to Item S(2b))
3.
Brunswick County
Z
I
Owner of Wastewater Treatment Facility (WWTF) Treating Wastewater From This Project
'4a.
',4b.
Northeast Brunswick Regional WWTF NC 0085819
Q
Name of WWTF WWTF Permit No.
' '5a.
Town of Leland 5b. 12" ®Gravity c. W00028587 Mod .
OOwner
of Downstream Sewer Receiving Sewer Size ❑Force Main Permit # of Downstream Sewer (Instruction F)
�6.
-
LL
The origin of this wastewater is (check all that apply)_-
Z
- — - -
�-
® Residential Subdivision ❑ Retail (Stores, shopping centers) 100% Domestic/Commercial .
❑ Apartments/Condominiums ❑ Institution % Industrial
❑ Mobile Home Park ❑ Hospital
LU
ElSchool ElChurch (Attach Description)
-Nursing
❑ Restaurant El Home % Other
❑ Office ❑ Other (specify):
(Attach Description)
7.
Volume of wastewater to be allocated or permitted for this particular project: 9,030 GPD . gallons per day
�Do not include future flows or previously permitted allocations
8.
If the permitted flow is zero, 'indicate why:
i
(
❑ Pump Station, Outfall or Interceptor Line where flow will be permitted in subsequent permits that connect to this line
❑ Flow has already been allocated in Permit No.
❑ Rehabilitation or replacement of existing sewer with no new flow expected
(see 15A NCAC 02T .0303 to determine if a permit is required)
FTA 08-13 APPLICATION Page 3 of 6
9. Provide the wastewater flow calculations used in determining the. permitted flow in accordance with 15A NCAC 2T .0114 for
the value in Item B(7) AND/OR the design flow for line or pump station sizing if a reduced -or zero flow is being requested in
Item 13(7). Values other than that in 15A NCAC 2T .0114 (b) and (c) must be supported with actual water or wastewater use
i data in accordance with 15A NCAC 2T .0114 (f).
j ' 43 single family homes @ 210 GPD = 9,030 GPD
10.- Summaryof Sewer Lines to be Permitted (attach additional sheets if necessary)
1 ` New Gravity or Additional
Size (inches)-- I — -Length {feet} _ Force Main _-
8 I 1,766 LF -- New Gravity
--
W
— --
--
Z
—
11. Summary of Pump Stations w/ associated Force Mains to be Permitted (attach additional sheets as necessary)
O
Pump Station Location ID:
(self chosen - as shown on plans/map for: -reference)
V
I
...
Longitude:
Latitude:
Z
DesigFlow
n
I (MGD)
Power Reliability Option
Oerational Point
p - 1.ermanent enerator Force Main Size Force Main Length
Q
w1ATS;
GPM @TDH p g
1
2 -portable generator w1MTS
LIL
Z.
jPump Station Location ID:
(self chosen - as shown on plans/map for reference)
'Longitude:_
Latitude:
LU
4
_
-Design Flow
-Power Reliability Option
Operational Point
(MGD)
GPM @TDH 1 - permanent generator w/ATS; Force Main Size Force Main Length
m
2 - portable generator w/MTS
2. Will the wastewater flow in the proposed sewer lines or pump stations be able to be directed to another treatment facility?
Yes ® No If Yes, permit number.of 2°d treatment facility.:
RO - if 'yes" to 13,12 please contact the Central Office PERCS Unit)
3. Does the sewer system comply with the Minimum Design Criteria,for the Permitting of Design of PumpStations and Force, Mains
Force• Mains
(latest version), the Gravi�Sewer Minimum Design Criteria Design Criteria (latest version) and 15A NCAC•Chapter 2T as applicable?'
® Yes El NO- If No, please reference the pertinent minimum design criteria or regulation and indicate why a
variance is requested. SUBMIT TWO COPIES OF PLANS, SPECIFICATIONS OR CALCULATIONS
--PERTINENT TO THE VARIANCE WITH YOUR APPLICATION
i
EGE VE
13Y:
FTA 08-13 APPLICATION Page-4 of 6
f)
0
F-
V
M
11-7
V
Al
14. Have the following permits/certifications been submitted for, approval for the system or project to be served?
I
Wetland/Stream Crossings - General Permit or 401'Certification? ❑ Yes ❑ No ® N/A
Sedimentation and Erosion Control Plan? ® Yes ❑ No ❑ N/A
Trout Buffer Waiver'? ❑ Yes ❑ No ® N/A
Stormwater? ® Yes- ❑ No. ❑ NIA
15. Does this project include any high priority- lines (15A NCAC 02T .0402 (2)) involve aerial lines, siphons, or interference
manholes)? These lines will be considered high priority and must be checked once every six months
if Yes: ❑ and provide details:
1. Owner/Permittee's Certification: (Signature -of Signing Official and Project Name)
David A. Hollis, PE, Town. Manager, attest that this application for Brunswick Forest, Phase 1 Section 6B has
been reviewed by me. and is'accurate and complete to the best of my.knowledge. I understand. that if-ah required parts of
this application are not completed and that if all required supporting _documentation and attachments are not included, this
application package is subject to being returned as incomplete. Note: in accordance with North Carolina Genera! Statutes
143-215:fiA and 143-215.68. any, person who knowingly makes any false statement, representation, or certification in any
application shall be guilty of a Class 2 misdemeanor, -which may, include a fine not to exceed. $10,000 as well as civil
penalties up to $25i000 per viola on.
la.
f Signing Official Signature Date
ENGINEERING DESIGN DOCUMENTS MUST BE COMPLETED PRIOR TO SUBMITTAL OF THIS
APPLICATION.: THESE DOCUMENTS MUST INCLUDE:PLAN AND PROFILE OF SEWERS, THEIR PROXIMITY
TO OTHER UTILITIES, DESIGN CALCULATIONS, ETC.. REFER TO 15A NCAC 02T .0305- -
Professional Engineer's Certification: (Signature of Design Engineer and Project Name)
1, David S. Hollis, PE; PLS, Hanover DeSkh Services. PA ,attest that this application for Brunswick Forest,=Phase
1 Section 613 has been reviewedby me and is accurate,, complete and consistent with the information in. the engineering
plans, calculations, and all other supporting documentation to the best of my knowledge. l further attest -that to the best of
my knowledge -the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer
Minimum Design Criteria for Gravity Sewers adopted February 12, 1996, and the Minimum Design Criteria for the Fast -
Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 and the watershed classification in accordance
with Division_ guidance. Although other professionals may have developed certain portions of this submittal package,
inclusion of these materials under my signature and seal signifies that l have reviewed this material and have judged it to
be consistent with the proposed design. Note:- in accordance with NC General Statutes 143-215.6A and 143-2.15.6B..any
person who knowingly makes any false statement, representation, or certification in any application shall be guilty of a Class
2 misdemeanor which may include -a fine not to exceed $10;000 as well as civil penalties up to $25,000 per- violation.
-- t¢'�Ot6SBttf f7 f�tt' --
2a.. David S. Hollis, PE, PLS. �.•��H CARpz/�a,,�o
Professional Engineer Name '•. •.
�FISSi'pN •�
2b. Hanover Design Services, PA
Engineering Firm _ v SE AI 3
_ -- --- — ---- -- - - — 0nn7
2c. 1123 Floral Parkway
a 2
re •'•�l�Gl ��,,.�• ti��
�Mailing Address_
2d. Wilmington
_ _
2e. NC 2f. 28403 -- -_
{
I '''�i •°••°..d•���rao
City
State I Zip
g. 910-343-8002 2h. 910-343-9941
2i. dhollis@hdsilm.com
r _
I H .
+
Telephone Facsimile
E-mail
, NC PE Seal; Signature &
FTA 08-13 APPLICATION Page 5 of 6
r M fi
• ter`✓" _ � ); . .. •' NAM.,
Tk
f= ate,• ^�yj'•, ,,,YYY��� � S {!,, .4. _
�``' , • 1 •14
fit. , ! ^1
• r r ,« !' 1. r fy�;��µ_. � 'T,, ,i • - �.. � �..',Y s.=,. • �' , � ..►�
' %'�' �' r��Q•� .r� _� 9.: fit � Fih'C Law (:ountrY 1 1 •.. ' �:.•, ••," � ' ., '•1' .,1..
•- 1,; i• - .;.y. .•f� '�1':-�: '1- � N�LI]LY I!li/ �Y r,
` Y I . `•.' r�y�', ��:d �;ii �7•R' ,��'•:`k, `• y�..,� �L �• •'�'..lolt,CoL ...,, at:,ti
Tw
..,_ s ~• r' - - :.: ; �. '-,,. �: �;. �JC'' % "'1•l.q�� :,irw. t}�'. .-, , fir` .' . N' ` �Y.`' 1
♦ . �,'} • • } s' '' ••]-i Yf `rti • /•. ,,` 'uW .. �.0\Y ' 011l]lh"�Vu .� NO
;PIX
,I�^,� �YG•!r" � _ -
ump StationNo;
�.� •,1''?�'. 'x��pw f'.u�.<4 �• _ 'i• '(Existing)
• - ,ar. +Wy: w�/ �•`,1j5�c1 �� °s '? a, 1 - ,I.. + I � .. •,1• tin � ��G7^ `]
7-1
'*j '�y. o\�J,�i Grl�+'t• 'ti^ -__- . ' � Y `T• a .. ��t�1,'.
0 i r� -
[� State of North Carolina
Department of Environment and Natural Resources
Division of Water Resources. -
j �M =of W , ,cu Flow Tracking/Acceptance for Sever Extension Applications
(FTSE 08-13)
Project Applicant Name: TOWN OF LELAND- :::
Project Naine`for. which flow is being requested: Brunswick Forest Phase 1 section 6B
More than one FTSE maybe required for a single project if & owner of the WWTP is not responsible for all pump
stations along the route of the proposed wastewater flow: " ;
L : Complete this.section only if you are the owner of the wastewater treatment plant.
a. 'WV
TP Facility Name:. "
b. WWTP Facility:Permit #:
AlI flows acre uz MGD
c. WWTP facility's permitted flow
d. Estimated obligated flow not yet tributary to the WWTP
e. WWTP facility's actual avg. flow
£ Total flow for this specific. request
g. Total'actual and obligated -flows to thefacility
h. Percent of permitted flow used
II.. Complete this section for each"pump station'you are responsible for along the route offbis
prflpased wastewater flow.
List pump stations located between the project connection point and the W WTP:
(B) :::. (C) (D)=(B+C) (E)ii(A-1D) .
Design Obligated,
Pump. Average Daily Approx. Not'Yet Total Current ...
Station Firm Flow** Current Avg. Tributary" Flow Plus
(]Maine or Capacity,*_ - (Firm 1 p%: Daily Flow, Daily FIow, Obl g4ted Available `
-.Nuinber) MGD: MOD' MGD..' MOD Flow Capacity'**
# is 1.814
-0.864
0.250
#3 1.512
0.672
0113
0.407 '
0.520
- 0.344
0.136
0.407
0.543
-0.293
0.592
0.544,
1.136
' -0.464
The Firm Capacity of any, pump -station is defined as the maximum.pumped flow that
can be achieved with the largest Pump taken out of service.
K Design Average Daily FIow is the firm capacity of the pump station divided by a'pealdng
factor (pi) not less than 2.5.
A Planning Assessment Addendum shall be attached for each pump station located
between the project connection point and -the YAM where the Available Capacity is < 0.
Page 1 of 6
F`iSE 08-13
Certification Statement:
I . David A. Hollis : - : certify to the best of any knowledge: that: the addition of
the volume of wastewater to -be permitted in this project has been evaluated along the route to the
receiving wastewater treatment facility and that the: flow from this project is not anticipated to
cause any capacity_ related sanitary sewer overflows or overburden any downstream pump station ,
en-route,to the receiving treatment plant under normal circumstances, given the implementation
of the planned improvements -identified in ilie planning assessment, where applicable'..' This. "
analysis has been performed in accordance with- local established policies and .procedures using: .
the best avaailable-data, This certification applies to thos6:items listed above ill: Sections I and -II'
plus all attached planning. assessment addendums for wMeh:.I- am: the responsible: party.
Signature of this form indicates: acceptance of.this wastewater. flow. .
Signing Of Cial Age
=Page 2 of 6
FTSE 06-13
d ' a
TTSE PLANNING ASSESSMENT ADDENDUM (PAA)
Submit a planning assessment addendum-for.each'puinp station listed in Section H where Available
Capacity is < 0.
Pump Station (Name or Nuinbcr):.
Given that:::: .
a. The proportion and amount of Obligated, Not Yet Tributary. Daily Flow (C) accounts for
81 % and -0.464 , MOD of the Availeble.Capacity (E) in Pump Station
- Lift Station # 3 ; and that
b. The rate of activation ofthis obligated, not yet tributary capacity "is'currently approximately
0.038 MGD per year; and #hat
c. A. funded Capital Project that will provide the.required planned capacity, namely
US (!.Corridor Force -Main is in design or under construction with'
planned completion in 2014/2015 Budget ' ; andlor. . .
d. The. followirigapplies:
The:Towu of Leland has:a 5 year capiial prQiect plan which contains the
recommended Alan's and funding; for the project. This plan is designed to
tale, the current and furthure flow from. Lift Station # 18 and pump directly -
into the Northeast Regional Force Main which will bypass Lift Station #1 .
and Lift Station # 3 and flow directl to the Northeast Regional Treaiment Plant.
Therefore;
Given reasonably expected conditions and. planning information, there is sufficient justification -
to allow this flow to be permitted, without a significant likelihood of over -allocating capacity: in:
the system infrastructure:
I understand thaf this- does not relieve the collection system owner from complying with G.S.'
143-215.67(a).which prohibits. the introduction of any waste in- excess of the capacity of the
waste disposal system.-
Signing Official Signd re Date
Page 3 of 6
-13 .
FTSE 06
= - FTSE PLANNING ASSESSMENT ADDENDUM (PAA)
Submit a planning assessment- addendum for each pump station listed in 'Se06n R where Available
Capacity 1s < 0. - .
Pump Ststicr, (:dame or Number):
Given that.
a : The -proportion and amount of Obligated, Not Yet Tributary Daily. Flow (C) accounts for .
1.63 % and -0.293 ' - . MOD of the Available Capacity (E) in:Pump Station
Lift Station # 1 ' and that
b. The rate of activation of this.obligated, not yet tributary capacity. is currently approximately.
0:035' MOD per year, and that
c. A funded Capital:Project that will provide the requited planned capacity;'namely
YTS 17 Corridor Force Main As in design or under construction with -:
-planned completion in 201412015.Bu4get - and/or
:. d. The following applies:
The Taws of ,eland has.a 5 year capital project plan which contains the
recommended plan's and funding' for the pro' ect. This plan is designed to.
:. take the current and furthure flow from Lift Station # -18 and pump directly _ ...
into the Northeast. Regional Force Main which will bypass Lift. Station #1
and Lift Station # 3 and flow directly to the Northeast. Regional Treatment Plant.
Therefore: - ..
Given reasonably expected conditions and planninginformation, there is sufficient, justification.
to allow this flow to be permitted, without a signiflcani likelihood of over=allocating capacity in'- -the system infrastructure.
I -understand-that this. does not relieve the collection system owner from complying with G.S. .
13-215.67(a) which prohibits the introduction of any waste in excess of the capacity- of the
waste disposal system.
Signing Q,�icial Signature .Date
Page 3 of 6 :
FTSE 06-13
State of North Carolina
Department ofEnvironment and Natural Resources
Division of Water Resources
D-,
Flow Trackin Acce tance for SeA►er-Extension A
Wj_V
iiiviislan of �'t►�rR,es+aurces � . F PpIications
(FTSE 08-13) .
Project,Applicant Name:. TOWN OF LELAND.
Project'Name for which flow is being requested: Brunswick Forest -Phase 1, Sec.' 6B
Moira than one FTSE may be required for a single project if the owner of the WWTP is not iespotutble, for all pump
stafions &long the route of the proposed tiawstewaterflow;' : :.
I. Complete this. section only if you are the owner of the wastewater treatmdht plant.
a. WWTP Facility blame: NORTHEAST -BRUNSWICK REGIONAL WWTP
b. ' W n? Facility Permit#: NC 0086819
---- - Alll fdows-are in MGD
e. WWTP.facility's permitted flow 1,65:
d. Estimated.obiigated flow not yet tributai�r to the WWTP 2.322
e: WWTP €acility's actual av& flow, - : 1.359
L Total flow for this. specific request .00903
g. Total actual and obligated flows. to the facility 3.69
h: Percent of permitted flow used 224%
II.. Complete." section for each pump.station.you are responsible for along the route of this
-proposed wastewater flow.
List pump stations located between the project connection point and the WWTP:
Design Obligated,
Pump - . AverageDaHy ::..Appiox. Nat Yet. Total Current
Station; Firm Flow** Cutzent Avg
. Tnbut ary � Flow Plus
(Name or Capacity,*. (Firm 1 pf), Daily Flow; Daily How, Obligated Available
Number) MGD MGD MGD. MGD Flow Capacity***
The Firm Capacity of any pump station is defined as the maximum pumped flow that
can be achieved:with the largest pump taken out of service.
Design Average Daily Flovn is the firm capacity of the pump station divided by 4-peaking
factor (pf) not.less than 2.5. .
A Planning Assessment Addendum shall be attached for each pump station located
between the project connection point Wad, the WWTP where the Available Capacity is <0.
Page I of 6
ME08-13 .
III. Certification Statement:
I Ann B. Hardy certify,to the best of my knowledge that the addition of
,the volume of'wastewater to be permitted in this project has been evaluated along the route to the
receiving wastewater treatment facility and that the flow from this project is not anticipated to
cause any capacity related sanitary sewer overflows or overburden any-downstreani pump station
en route to the receiving treatment plant under -normal circumstances, given the implementation
of the planned improvements identified in the planning assessment where: applicable. This
analysis has been performed in accordance with.local established policies and procedures using
the best available data. This certification applies to those items .listed above in Sections I and II
plus all attached planning assessment. addendums for which I am the- responsible -party..
Signature of this farm: indicates acceptance of this wastewater flow.
_., h1GZtJs,13
Sighing Official"Si9ndutre Date
Page 2 of 6
ME US-13
Tr
hanover Design
Land Surveyors, Engineers, Land Planners
November 22, 2013
Mr. Dean Hunkele
Department of Environment and Natural Resources
Division of Water Quality
127 Cardinal Drive Extension
Wilmington, NC 28405-3845
Re: Brunswick Forest, Phase 1 Section 6B
Sewer Narrative
Town of Leland
Brunswick County
The purpose of this project is to construct 43 single-family homes. With a demand
of 210 GPD per unit.
9,030 GPD of additional flow will be directed by way of sewer extension. It will tie
into the existing 12" main along Low Country Boulevard which feeds into
Brunswick Forest Pump Station #1 (see the previously approved Permit #
WQ0028587 MOD).
If you have any Questions or comments, please feel free to contact me.
Sincerely,
David Brown
Hanover Design Services
dbrown@hdsilm.com
343-8002 Office
343-9941 Fax
8829-Ph 1 Sec68-DH2.doc
1123 Floral Parkway Wlimington, N.C, 28403 Phone (910) 343-8002 Fax 910j 343-9941
Business F1rm License No. C-0597