HomeMy WebLinkAboutwq0028587_Permit (Modification)_20170119Water Resources
ENVIRONMENTAL OUALITy
January 19, 2017
David A. Hollis, Town Manager
Town of Leland
102 Town Hall Drive
Leland, NC 28451
Subject: Permit No. WQ0028587 MODIFICATION
Town of Leland
Brunswick Forest Collection System
Wastewater Collection System Extension
Brunswick County
Dear Mr. Hollis:
�og''I
ROY COOPER.
"I", "In,
WIL.LIAM G. ROSS, JR.
.,ruin Fu'aan
S. JAY ZIMMERMAN
i?✓T'pir
In accordance with your application received December 19, 2016 and additional information received on
January 11t" and 18t", 2017, we are forwarding herewith Permit No. WQ0028587 dated January 19, 2017
to the Town of Leland (Permittee) for the construction and operation upon certification of the subject
wastewater collection system extension. This permit shall be effective from the date of issuance until
rescinded, shall void Permit No. WQ0028587 issued September 14, 2016, and shall be subject to the
conditions and limitations as specified therein. This cover letter shall be considered a part of this permit
and is therefore incorporated therein by reference.
This modification adds gravity sewer and two pump stations to serve 200 single-family residences in
Phase 9 Section 3.
Please pay particular attention to the following conditions contained within this permit:
Special Conditions:
Condition 1.1: This permit shall become voidable unless the agreement between the Town of Leland
and Brunswick County forthe collection and final treatment of wastewater is in full force
and effect. [15A NCACO2T.0304(h)]
Condition 1.2: Each pump station shall be clearly and conspicuously posted using a weatherproof sign
with a pump station identifying name/number, address, 24-Hour Emergency telephone
number, and name of the owner/operator of the sewer system/pump station and
instructions to call the number in the event of alarm activation or other emergency.
Simplex pump stations or vacuum sewer pits serving a single-family residence may have
a placard or sticker on the control panel in lieu of a sign. [15A NCAC 02T .0305(h)(2)]
-',--�' Nothing Compares"�
127 Cardinal Drive Extension, Wilmington, North Carolina 28405
Phone: 910-796-7215\ Internet: www.deg.nc.zov
An Equal Opportunity \Affirmative Action Employer — Made in part by recycled paper
Standard Conditions:
Condition 11.1: This permit shall not be automatically transferable; a request must be made and
approved.
Condition IIA: Requires that the wastewater collection facilities be properly operated and maintained
in accordance with 15A NCAC 2T .0403 or any individual system -wide collection system
permit issued to the Permittee.
It shall be responsibility of the Permittee to ensure that the as -constructed project meets the appropriate
design criteria and rules. Failure to comply may result in penalties in accordance with North Carolina
General Statute §143-215.6A through §143-215.6C, construction of additional or replacement
wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to
the licensing board.
If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to
request an adjudicatory hearing upon written request within 30 days following receipt of this permit. This
request must be in the form of a written petition, conforming to Chapter 150B of North Carolina General
Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC
27699-6714. Unless such demands are made, this permit shall be final and binding.
If you need additional information concerning this matter, please contact Dean Hunkele at (910) 796-7215
or via e-mail at Dean. HUnkele@ncdenr.gov.
Sincerely,
James egson, Regional Supervisor
Water Quality Regional Operations Section
Wilmington Regional Office
Division of Water Resources, NCDEQ
Cc: Adam Grady, Hanover Design Services
Bill Pinnix, Brunswick County Public Utilities
WIRO, Surface Water Protection -- Northeast Brunswick Regional (NC0086819) Sewer Ext. File
Central Files, Water Quality Section
PERCS Unit (via email)
Permit No. WQ0028587 Page 2 of 14
Environmental
Quality
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as
amended, and other applicable Laws, Rules, and Regulations, permission is hereby granted to the
TOWN OF LELAND
BRUNSWICK COUNTY
for the construction and operation upon certification of approximately 4,124 linear feet of 8-inch and
1,195 linear feet of 10-inch gravity sewer, a 372—gallon per minute pump station (#7) with duplex pumps,
on -site audible and visual high water alarms, telemetry, and a permanent generator with automatic
transfer switch or an automatically activated stand-by bypass pump as well as approximately 2,210linear
feet of 6-inch force main to directly serve 88 three -bedroom residences and the discharge of 18,480
gallons per day of collected domestic wastewater plus flow from the system below and future service
areas;
for the construction and operation upon certification of approximately 4,815 linear feet of 8-inch gravity
sewer, a 63—gallon per minute pump station (#8) with duplex pumps, on -site audible and visual high water
alarms, telemetry, and a permanent generator with automatic transfer switch or an automatically
activated stand-by bypass pump as well as approximately 1,350 linear feet of 3-inch force main to serve
112 three -bedroom residences and the discharge of 23,520 gallons per day of collected domestic
wastewater;
Both systems described above are associated with the Phase 9 Section 3 project discharging into the Town
of Leland's existing sewerage system, pursuant to the application received December 19, 2016 and
additional information received on January 111h and 181h, 2017 and in conformity with 15A NCAC 2T; the
Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; the Division's
Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1,
2000 as applicable; and other supporting data subsequently filed and approved by the Department of
Environmental Quality and considered a part of this permit.
AND
September 14, 2016 Modification (Version 4.2)
For the continued operation of approximately 1,560 linear feet of 8-inch to serve 28 three -bedroom
single-family residences as part of the Phase 1 Section 5 project, and the discharge of 5,880 gallons per
day of collected domestic wastewater into the Town of Leland's existing sewerage system, pursuant to
the application received August 10, 2016. This system was certified complete on January 5, 2017.
Permit No. WQ0028587 . Page 3 of 14
April 14, 2016 Modification (Version 4.1)
For the continued construction and operation upon certification of approximately 4,423 linear feet of 8-
inch and 154 linear feet of 12-inch gravity sewer to serve 80 three -bedroom single-family residences as
part of the Phase 3 Section 3 project, and the discharge of 16,800 gallons per day of collected domestic
wastewater into the Town of Leland's existing sewerage system, pursuant to the application received
March 11, 2016.
October 26, 2015 Modification (Version 4.0)
For the continued construction and operation upon certification of approximately 5,390 linear feet of 8-
inch gravity sewer; a 52-gallon per minute pump station with 1,210 linear feet of 4-inch force main to
serve 119 three -bedroom single-family residences as part of the Phase 5 Section B-1 project, and the
discharge of 24,990 gallons per day of collected domestic wastewater into the Town of Leland's existing
sewerage system, pursuant to the application received September 10, 2015. Pump station and force
main certified complete on May 24, 2016.
August 3, 2015 Modification (Version 3.9)
For the continued construction and operation upon certification of approximately 6,147 linear feet of 8-
inch, 1,201 linear feet of 10-inch, and 538 linear feet of 12-inch gravity sewer; a 108-gallon per minute
pump station with 722 linear feet of 6-inch force main to serve 220 three -bedroom single-family
residences as part of the Phase 2 Section 4 project, and the discharge of 46,200 gallons per day of
collected domestic wastewater into the Town of Leland's existing sewerage system, pursuant to the
application received July 9, 2015.
June 2, 2015 Modification (Version 3.8)
For the continued operation of approximately 4,534 linear feet of 8-inch and 1,326 linear feet of 12-inch
gravity sewer to serve 101 three -bedroom single-family residences and 30 duplex units as part of the
Phase 2 Section 3 project, and the discharge of 27,510 gallons per day of collected domestic wastewater
into the Town of Leland's existing sewerage system, pursuant to the application received April 22, 2015
and additional information received on June 1, 2015. This system was certified as complete on February
11, 2016.
January 15, 2015 Modification (Version 3.7)
For the continued construction and operation upon certification of approximately 3,217 linear feet of 8-
inch gravity sewer to serve 44 three -bedroom homes as part of the Phase 2 Section 5 (Tennyson Village)
project, and the discharge of 9,240 gallons per day of collected domestic wastewater into the Town of
Leland's existing sewerage system, pursuant to the application received December 11, 2014.
May 23, 2014 Modification (Version 3.6)
For the continued operation of approximately 4,965 linear feet of 8-inch gravity sewer; a 90—gallon per
minute pump station with duplex pumps, on -site audible and visual high water alarms, telemetry, and a
permanent generator with automatic transfer switch as well as approximately 2,090 linear feet of 4-inch
force main to serve 96 three -bedroom single—family residences as part of the Brunswick Forest Phase 1
Section 4 project, and the discharge of 20,160 gallons per day of collected domestic wastewater into the
Town of Leland's existing sewerage system, pursuant to the application received April 15, 2014. This
system was certified as complete on March 17, 2015.
Permit No. WQ0028587 Page 4 of 14
December 19, 2013 Modification (Version 3.5)
For the continued operation of approximately 1,766 linear feet of 8-inch gravity sewer to serve 43 three -
bedroom single-family residences as part of the Brunswick Forest Phase 1 Section 6B project, and the
discharge of 9,030 gallons per day of collected domestic wastewater into the Town of Leland's existing
sewerage system, pursuant to the application received November 21, 2013. This system was certified as
complete on August 6, 2014.
October 9, 2013 Modification (Version 3.4)
For the continued operation of approximately 5,685 linear feet of 8-inch gravity sewer to serve 101 three -
bedroom single-family residences and 22 three -bedroom duplex units as part of the Brunswick Forest
Phase 2 Section 2 project, and the discharge of 25,830 gallons per day of collected domestic wastewater
into the Town of Leland's existing sewerage system, pursuant to the application received August 29, 2013
and additional information received.on September 4, 2013. This system was certified as complete on
August 19, 2014.
March 6, 2013 Modification (Version 3.3)
For the continued construction and operation upon certification of approximately 208 linear feet of 8-inch
gravity sewer to serve a medical office on Lot 10 of the South Village commercial area as part of the South
Village Lot 10 project, and the discharge of 750 gallons per day of collected domestic wastewater into the
Town of Leland's existing sewerage system, pursuant to the application received January 24, 2013, and
additional information received on January 30, 2013.
March 21, 2012 Modification (Version 3.2)
For the continued operation of approximately 4,411 linear feet of 8-inch gravity sewer, to serve 87 three -
bedroom residences (18,270 gpd), 32 three -bedroom townhomes (6,720 gpd), and 4 buildings with a total
of 16 multi -family units (3,360 gpd) as part of the Brunswick Forest Phase 2B Section 1 project, and the
discharge of 28,350 gallons per day of collected domestic wastewater into the Town of Leland's existing
sewerage system, pursuant to the applications received March 5, 2012. This system was certified as
complete on March 24, 2014.
April 21, 2011 Modification (Version 3.1)
For the continued operation of approximately 679 linear feet of 8-inch gravity sewer, to serve 13 three -
bedroom residences (70 gpd/bedroom), as part of the Brunswick Forest Phase 1 Section 6A project, and
the discharge of 1,820 gallons per day of collected domestic wastewater into the Town of Leland's existing
sewerage system, pursuant to the applications received March 30, 2011. This system was certified as
complete on June 30, 2011.
February 13, 2009Modification (Versions 2.9 and 3.0)
For the continued operation of approximately 4,765 linear feet of 12-inch gravity sewer, 13,696 linear feet
of 8-inch gravity sewer; a 450—gallon per minute pump station with duplex pumps, on -site audible and
visual high water alarms, telemetry, and on -site generator with automatic transfer switch with
approximately 9,805 linear feet of 8-inch force main to serve 193 three -bedroom residences, ma intenance
shed with wash bay (1,650 gpd), golf course restrooms (1,000 gpd), and a country club with food service
(7,440 gpd) as part of the Brunswick Forest Phase 3B & Country Club project, and the discharge of 50,620
(reduced from 79,570) gallons per day of collected domestic wastewater into the Town of Leland's existing
sewerage system, pursuant to the applications received January 26, and 27, 2009. This system was
certified complete on August 30, 2016.
Permit No. WQ0028587 Page 5 of 14
February 6, 2009 Modification (Version 2.8)
For the continued operation of approximately 3,988 linear feet of 8-inch gravity sewer to 48 three -
bedroom residences and 72 two -bedroom residences as part of the Brunswick Forest Phase 1 Section 2
Village 2-A Sewer project, and the discharge of 20,160 (reduced from 34,560) gallons per day of collected
domestic wastewater into the Town of Leland's existing sewerage system, pursuant to the application
received January 9, 2009. This system was certified as complete on May 4, 2009.
January 30, 2009 Modification (Version 2.7)
For the continued operation of approximately 13,192 linear feet of 8-inch gravity sewer, approximately
1,564 linear feet of 10-inch gravity sewer, approximately 2,531 linear feet of 12-inch gravity sewer; a 550—
gallon per minute pump station with duplex pumps, on -site audible and visual high water alarms,
telemetry, on -site generator with automatic transfer switch with approximately 10,325 linear feet of 10-
inch force main to serve 324 single-family three -bedroom lots as part of the Brunswick Forest Phase SA
and Phase 5 project, and the discharge of 68,040 (reduced from 116,640) gallons per day of collected
domestic wastewater into the Town of Leland's existing sewerage system, pursuant to the application
received December 22, 2008. This system was certified as complete on July 13, 2015.
October 17, 2008 Modification (Version 2.6)
Forthe continued operation of approximately 4,607linear feet of 8-inch gravity sewer to serve as a gravity
sewer outfall or interceptor line for future upstream or tributary sewer systems as part of The Villages at
Brunswick Forest project with no additional discharge of collected domestic wastewater into Town of
Leland's existing sewerage system, pursuant to the application received September 26, 2008. This system
was certified as complete on December 8, 2008 & updated May 4, 2009.
August 1, 2008 Modification (Version 2.5)
For the continued operation of approximately 599 linear feet of 8-inch gravity sewer to serve a 3,511
gallons per day medical office building as part of the South Village Phase-1 project, and the discharge of
3,511 gallons per day of collected domestic wastewater into the Town of Leland's existing sewerage
system, pursuant to the application received June 19, 2008. This system was certified as complete on
May 4, 2009.
July 18, 2008 Modification (Version 2.4)
For the continued operation of approximately 1,630 linear feet of 8-inch gravity sewer to serve a 49,170
sf Grocery Store (4,920 gpd), 84,370 sf of Retail Space with no food services (8,437 gpd), a 13,225 sf
Pharmacy (1,325 gpd), a 30 space Restaurant Drive-Thru (1,500 gpd) and a 50 seat Restaurant (2,000 gpd)
as part of the East Village Phase-1 project, and the discharge of 18,182 gallon per day of collected
domestic wastewater into the Town of Leland's existing sewerage system, pursuant to the application
received June 19, 2008. This system was certified as complete on September 27, 2011.
October 12, 2007 Modification (Version 2.3)
For the continued operation of approximately 1,174 linear feet of 8-inch gravity sewer to serve 62 three -
bedroom and 10 two -bedroom residences as part of the Phase 1 Section 2 Village 4-A project, and the
discharge of 14,420 (reduced from 24,720) gallons per day of collected domestic wastewater into the
Town of Leland's existing sewerage system, pursuant to the application received September 18, 2007.
This system was certified as complete on July 31, 2008 and updated May 8, 2009.
Permit No. WQ0028587 Page 6 of 14
September 7, 2007 Modification (Version 2.2)
For the continued operation of approximately 2,952 linear feet of 8-inch gravity sewer to serve 72 three -
bedroom residences as part of the Phase 1 Section 2 Village 1-A project, and the discharge of 15,120
(reduced from 25,920) gallons per day of collected domestic wastewater into the Town of Leland's existing
sewerage system, pursuant to the application received July 25, 2007. This system was certified complete
on July 31, 2008.
June 8, 2007 Modification (Version 2.1)
For the continued operation of approximately 1,393 linear feet of 8-inch gravity sewer to serve Lots 1 & 2
for a bank.with 10 employees (250 gpd) and an unspecified development on the other (will require
allocation to be added prior to connection) as part of the East Village Commercial Center project, and the
discharge of 250 gallons per day of collected domestic wastewater into the Town of Leland's existing
sewerage system, pursuant to the application received May 16, 2007. This system was certified as
complete on December 6, 2007.
April 20, 2007 Modification (Version 2.0)
For the continued operation of approximately 5,065 linear feet of 8-inch gravity sewer to serve 94 three -
bedroom single-family residences as part of the Brunswick Forest Phase 1 Section 3 project, and the
discharge of 19,470 (reduced from 33,840) gallons per day of collected domestic wastewater into the
Town of Leland's existing sewerage system, pursuant to the application received March 29, 2007. This
system was certified as complete on August 6, 2008.
April 13, 2007 Modification (Version 1.9)
For the continued operation of approximately 5,126 linear feet of 8-inch gravity sewer to serve 56 three -
bedroom single-family residences and 30 three -bedroom & 30 two -bedroom townhomes as part of the
Brunswick Forest Phase 6 Sections 1-B & 2 project, and the discharge of 22,260 (reduced from 38,610)
gallons per day of collected domestic wastewater into the Town of Leland's existing sewerage system,
pursuant to the application received March 9, 2007. This system was certified as complete on November
30, 2007.
December 22, 2006 Modification (Version 1.8)
For the continued operation of approximately 13,874 linear feet of 8-inch gravity sewer; a 387—gal Ion per
minute pump station with duplex pumps, on -site audible and visual high water alarms, telemetry, and on -
site generator with automatic transfer switch; as well as approximately 3,520 linear feet of 6-inch force
main to serve 193 three -bedroom residences as part of the Brunswick Forest Phase 1 Section 2 project,
and the discharge of 40,530 (reduced from 69,480) gallons per day of collected domestic wastewater into
the Town of Leland's existing sewerage system, pursuant to the application received December 1, 2006.
This system was certified as complete on May 4, 2009.
October 27, 2006 Modification (Version 1.6)
For the continued operation of approximately 1,008 linear feet of 8-inch gravity sewer to serve future
development including a sales center & wellness facility in Brunswick Forest Phase 6 Section 1-A as part
of the Brunswick Forest project and the discharge of 800 gallons per day of collected domestic wastewater
into the Town of Leland's existing sewerage system, pursuant to the application received September 15,
2006. This system was certified as complete on June 15, 2007.
Permit No. WQ0028587 Page 7 of 14
I
May 26, 2006 Modification (Version 1.5)
For the continued operation of approximately 5,926 linear feet of 8-inch gravity sewer; a 380—gallon per
minute pump station with duplex pumps, on -site audible and visual high water alarms, telemetry, and on -
site generator with automatic transfer switch; as well as approximately 3,915 (increased from 2,821 feet
per modification issued November 3, 2006) linear feet of 6-inch force main to serve 149 three -bedroom
residences as part of the Jefferson Landing at Brunswick Forest Phase 2 (aka Phase 1 Section 1-B) project,
and the discharge of 31,290 (reduced from 53.640) gallons per day of collected domestic wastewater into
the Town of Leland's existing sewerage system, pursuant to the application originally received April 24,
2006 and subsequent modification request received September 25, 2006. This system was certified as
complete on March 27, 2007.
April 7, 2006 Modification (Version 1.4)
For the continued operation of approximately 793 linear feet of 10-inch, and 2,329 (reduced from 3,830)
linear feet of 12-inch gravity sewer to serve as a gravity sewer outfall or interceptor line for future
upstream or tributary sewer systems as part of the Brunswick Forest Phase 3A project with no additional
discharge of collected domestic wastewater into the Town of Leland's existing sewerage system, pursuant
to the application received February 16, 2006. This system was certified as complete on March 15, 2007.
March 10, 2006 Modification (Version 1.3)
For the continued operation of approximately 6,741 linear feet of 8-inch gravity sewerto serve 131 three -
bedroom residences as part of the Jefferson Landing at Brunswick Forest Phase 1 (aka Phase 1 Section
1-A) project, and the discharge of 27,510 (reduced from 47,160) gallons per day of collected domestic
wastewater into the Town of Leland's existing sewerage system, pursuant to the application received
February 14, 2006. This system was certified as complete on December 22, 2006.
July 21, 2005 Modification (Version 1.2)
For the continued operation of approximately 25 linear feet of 8-inch and 3,290 linear feet of 12-inch
gravity sewer to serve as a gravity sewer outfall or interceptor line for future development upstream of
the previously approved sewer listed below as part of the Brunswick Forest Phase 2 project, and with no
additional discharge of collected wastewater into the Town of Leland's existing sewerage system,
pursuant to the application received June 15, 2005. This system was certified as complete on December
8, 2008.
March 24, 2005 Original Permit (Versions 1.0 & 1.1)
For the continued operation of approximately 868 linear feet of 8-inch, 3,414 linear feet of 10-inch, and
3,141 linear feet of 12-inch gravity sewer; a 1500—gallon per minute pump station with duplex pumps, on -
site audible and visual high water alarms, telemetry/autodialer, and on -site generator with automatic
transfer switch, as well as approximately 20,650 total linear feet of 10-inch force main (dual force mains)
to serve this large residential and commercial development as part of the Brunswick Forest Phase 1
project with no discharge of wastewater into the Town of Leland's existing sewerage system, pursuant to
the application received March 11, 2005. This system was certified as complete on March 15, 2007.
From the original permit 25,257 gpd of commercial flow allocation remains in reserve from the October
17 2008 modification.
Permit No. W00028587 Page 8 of 14
This permit shall be effective from the date of issuance until rescinded and shall be subject to the specified
conditions and limitations contained therein.
Permit Number: WQ0028587
Issued Today: January 19, 2017
James H.(Gregson, Regional Supervisor
Wilmington Regional Office
Water Quality Regional Operations Section
Division of Water Resources, NCDEQ
By Authority of the Director and The Environmental Management Commission
Permit No. WQ0028587 Page 9 of 14
SUPPLEMENT TO PERMIT COVER SHEET
NAME OF APPLICANT is hereby authorized to:
Construct, and then operate upon certification the aforementioned wastewater collection extension. The
sewage and wastewater collected by this system shall be treated in the WWTF NAME Wastewater
Treatment Facility in accordance with Permit Number NCOOXXXXX or WQOOXXXXX.
Permitting of this project does not constitute an acceptance of any part of the project that does not meet
15A NCAC 2T; the Division of Water Resources' (Division) Gravity Sewer Minimum Design Criteria adopted
February 12, 1996 as applicable; and the Division's Minimum Design Criteria for the Fast -Track Permitting
of Pump Stations and Force Mains adopted June 1, 2000 as applicable, unless specifically mentioned
herein. Division approval is based on acceptance of the certification provided by a North Carolina -licensed
Professional Engineer in the application. It shall be the Permittee's responsibility to ensure that the as -
constructed project meets the appropriate design criteria and rules.
Construction and operation is contingent upon compliance with the Standard Conditions and any Special
Conditions identified below.
I. SPECIAL CONDITIONS
1. This permit shall become voidable unless the agreement between the Town of Leland and Brunswick
County for the collection and final treatment of wastewater is in full force and effect. [15A NCAC
02T.0304(h)]
2. Each pump station shall be clearly and conspicuously posted using a weatherproof sign with a pump
station identifying name/number, address, 24-Hour Emergency telephone number, and name of the
owner/operator of the sewer system/pump station and instructions to call the number in the event
of alarm activation or other emergency. Simplex pump stations or vacuum sewer pits serving a single-
family residence may have a placard or sticker on the control panel in lieu of a sign. [15A NCAC 02T
.0305(h)(2)]
II. STANDARD CONDITIONS
1. This permit shall not be transferable. In the event there is a desire for the wastewater collection
facilities to change ownership, or there is a name change of the Permittee, a formal permit request
shall be submitted to the Division accompanied by documentation from the parties involved, and
other supporting materials as may be appropriate. The approval of this request shall be considered
on its merits and may or may not be approved. [15A NCAC 02T.0104; G.S 143-215.1(d3)]
2. This permit shall become voidable unless the wastewater collection facilities are constructed in
accordance with the conditions of this permit; 15A NCAC 2T; the Division's Gravity Sewer Minimum
Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for
the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and
other supporting materials unless specifically mentioned herein. [15A NCAC 02T.0110]
Permit No. WQ0028587 Page 10 of 14
3. This permit shall be effective only with respect to the nature and volume of wastes described in the
application and other supporting data. [15A NCAC 02T .0110]
4. The wastewater collection facilities shall be properly maintained and operated at all times. The
Permittee shall maintain compliance with an individual system -wide collection system permit for the
operation and maintenance of these facilities as required by 15A NCAC 2T .0403. If an individual
permit is not required, the following performance criteria shall be met: [15A NCAC 02T .0108(b)]
a. The sewer system shall be effectively maintained and operated at all times to prevent discharge
to land or surface waters, and to prevent any contravention of groundwater standards or surface
water standards.
b. A map of the sewer system shall be developed and shall be actively maintained.
c. An operation and maintenance plan including pump station inspection frequency, preventative
maintenance schedule, spare parts inventory and overflow response has been developed and
implemented.
d. Pump stations that are not connected to a telemetry system shall be inspected every day (i.e. 365
days per year). Pump stations that are connected to a telemetry system shall be inspected at
least once per week.
e. High -priority sewer lines shall be inspected at least once per every six -months and inspections are
documented.
f. A general observation of the entire sewer system shall be conducted at least once per year.
g. Overflows and bypasses shall be reported to the appropriate Division regional office in accordance
with 15A NCAC 2B .0506(a), and public notice shall be provided as required by North Carolina
General Statute §143-215.1C.
h. A Grease Control Program is in place as follows:
1. For public owned collection systems, the Grease Control Program shall include at least
biannual distribution of educational materials for both commercial and residential users and
the legal means to require grease interceptors at existing establishments. The plan shall also
include legal means for inspections of the grease interceptors, enforcement for violators and
the legal means to control grease entering the system from other public and private satellite
sewer systems.
2. For privately owned collection systems, the Grease Control Program shall include at least bi-
annual .distribution of grease education materials to users of the collection system by the
permittee or its representative.
3. Grease education materials shall be distributed more often than required in Parts (1) and (2)
of this Subparagraph if necessary to prevent grease -related sanitary sewer overflows.
i. Right-of-ways and easements shall be maintained in the full easement width for personnel and
equipment accessibility.
j. Documentation shall be kept for Subparagraphs (a) through (i) of this Rule for a minimum of three
years with exception of the map, which shall be maintained for the life of the system.
Permit No. WQ0028587 Page 11 of 14
5. Noncompliance Notification:
The Permittee shall report by telephone to a water resources staff member at the Wilmington
Regional Office, telephone number (910) 796-7215, as soon as possible, but in no case more than 24
hours or on the next working day, following the occurrence or first knowledge of the occurrence of
either of the following:
a. Any process unit failure, due to known or unknown reasons, that renders the facility incapable
of adequate wastewater transport, such as mechanical or electrical failures of pumps, line
blockage or breakage, etc.; or
b. Any SSO and/or spill over 1,000 gallons; or
c. Any SSO and/or spill, regardless of volume, that reaches surface water
Voice mail messages or faxed information is permissible, but this shall not be considered as the initial
verbal report. Overflows and spills occurring outside normal business hours may also be reported to
the Division of Emergency Management at telephone number (800) 858-0368 or (919) 733-3300.
Persons reporting any of the above occurrences shall file a spill report by completing and submitting
Part I of Form CS-SSO (or the most current Division approved form) within five days following first
knowledge of the occurrence. This report must outline the actions taken or proposed to be taken to
ensure thatthe problem does not recur. Part II of Form CS-SSO (orthe most current Division approved
form) can also be completed to show that the SSO was beyond control. [G.S. 143-215.1C(al)]
6. Construction of the gravity sewers, pump stations, and force mains shall be scheduled so as not to
interrupt service by the existing utilities nor result in an overflow or bypass discharge of wastewater
to the surface waters of the State. [15A NCAC 02T.0108(b)]
Upon completion of construction and prior to operation of these permitted facilities, the completed
Engineering Certification form attached to this permit shall be submitted with the required supporting
documents to the address provided on the form. A complete certification is one where the form is
fully executed and the supporting documents are provided as applicable. Any wastewater flow made
tributary to the wastewater collection system extension prior to completion of this Engineer's
Certification shall be considered a violation of the permit and shall subject the Permittee to
appropriate enforcement actions.
If the permit is issued to a private entity with an Operational Agreement, then a copy of the Articles
of Incorporation, Declarations/Covenants/Restrictions, and Bylaws that have been appropriately
filed with the applicable County's Register of Deeds office shall be submitted with the certification.
A complete certification is one where the form is fully executed and the supporting documents are
provided as applicable. Supporting documentation shall include the following:
One copy of the project construction record drawings (plan & profile views of sewer lines & force
mains) of the wastewater collection system extension. Final record drawings should be clear on
the plans or on digital media (CD or DVD disk) and are defined as the design drawings that are
marked up or annotated with after construction information and show required buffers,
separation distances, material changes, etc.
b. One copy of the supporting pump station design calculations (selected pumps, system curve,
operating point, buoyancy calculations, and available storage if portable generator(s) or storage
greater than longest past three year outage reliability option selected) for any pump stations
permitted as part of this project.
Permit No. WO0028587 Page 12 of 14
c. Changes to the project that do not result in non-compliance with this permit, regulations, or the
Minimum Design Criteria should be clearly identified on the record drawings, on the certification
in the space provided, or in written summary form.
Prior to Certification (Final or Partial): Permit modifications are required for any changes resulting in
non-compliance with this permit (including pipe length increases of 10% or greater, increased flow,
pump station design'capacity design increases of 5% or greater, and increases in the number/type of
connections), regulations, or the Minimum Design Criteria. Requested modifications or variances to
the Minimum Design Criteria will be reviewed on a case -by -case basis and each on its own merit.
Please note that variances to the Minimum Design Criteria should be requested and approved during
the permitting process prior to construction. After -construction requests are discouraged by the
Division and may not be approved, thus requiring replacement or repair prior to certification &
activation. [15A NCAC 02T .0116]
8. Gravitysewers installed greaterthan ten percent belowthe minimum required slope perthe Division's
Gravity Sewer Minimum Design Criteria shall not be acceptable and shall not be certified until
corrected. If there is an unforeseen obstacle in the field where all viable solutions have been
examined, a slope variance can be requested from the Division with firm supporting documentation.
This shall be done through a permit modification with fee. Such variance requests will be evaluated
on a case -by -case basis. Resolution of such request shall be evident priorto completing and submitting
the construction certification. [ 15A NCAC 02T.0105(n)]
9. A copy of the construction record drawings shall be maintained on file by the Permittee for the life of
the wastewater collection facilities. [15A NCAC 02T .0116]
10. Failure to abide by the conditions and limitations contained in this permit; 15A NCAC 2T; the Division's
Gravity Sewer Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design
Criteria for the Fast -Track Permitting of Pump Station and Force Mains adopted June 1, 2000 as
applicable; and other supporting materials may subject the Permittee to an enforcement action by
the Division, in accordance with North Carolina General Statutes §143-215.6A through §143-215.6C,
construction of additional or replacement wastewater collection facilities, and/or referral of the North
Carolina -licensed Professional Engineer to the licensing board. [15A NCAC 02T .0104; 15A NCAC 02T
.0108(b-c)]
11. 'in the event that the wastewater collection facilities fail to perform satisfactorily, including the
creation of nuisance conditions, the Permittee shall take immediate corrective action, including those
as may be required by this Division, such as the construction of additional or replacement facilities.
[15A NCAC 02T .0110; 15A NCAC 02T .0108(b)]
12. The issuance of this permit shall not exempt the Permittee from complying with any and all statutes,
rules, regulations, or ordinances that may be imposed by the Division any other Federal, State, or Local
government agencies which have jurisdiction or obtaining other permits which may be required by
the Division or any other Federal; State, of Local government agencies. [G.S. 143-215.1(b)]
Permit No. WQ0028587 Page 13 of 14
FAST TRACK SEWER ENGINEERING CERTIFICATION
PERMITTEE:
Town of Leland
PERMITff:
WQ0028587
PROJECT:
Brunswick Forest Phase 9 Section 3
ISSUE DATE:
January 19, 2017
COUNTY:
Brunswick
This project shall not be considered complete nor allowed to operate in accordance with Condition 7 of
this permit until the Division has received this Certification and all required supporting documentation.
Consequently, it should be submitted in a manner that documents the Division's receipt. Send the
required documentation to the Wilmington Regional Supervisor, Water Quality Section at the address at
the bottom.
Any wastewater flow made tributary to the wastewater collection system extension prior to completion
of this Certification shall be considered a violation of the permit and shall subject the Permittee to
appropriate enforcement actions. The Permittee is responsible for tracking all partial certifications up
until a final certification is received. A Final Certification shall be a complete set of record drawings and
design calculations regardless of whether partials have been submitted.
PERMITTEE'S CERTIFICATION
I, the undersigned agent for the Permittee, hereby state that this project has been constructed pursuant
to the applicable standards & requirements, the Professional Engineer below has provided applicable
design/construction information to the Permittee, and the Permittee is prepared to operate & maintain
the wastewater collection system permitted herein or portions thereof.
Printed Name, Title Signature
ENGINEER'S CERTIFICATION
Date
I, , as a duly registered Professional Engineer in the State of North Carolina,
having been authorized to observe (❑ periodically, ❑ weekly, n full time) the construction of the
project name and location as referenced above for the above Permittee hereby state that, to the best of
my abilities, due care and diligence was used in the observation of the construction such that the
construction was observed to be built within substantial compliance of this permit; 15A NCAC 2T; the
Division of Water Resources' (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996
as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and
Force Mains adopted June 1, 2000 as applicable; and other supporting materials.
North Carolina Professional Engineer's Seal w/signature & date
❑ Final ❑ Partial
Certification Comments/Qualifiers:
NC DWR — Water Quality Regional Operations Section 127 Cardinal Drive Extension Wilmington, NC 28405
Wilmington Regional Office Phone: 910-796-7215 FAX: 910-350-2004
Central Files: APS _ SWP
12/21/2016
Permit Number WQ0028587 Permit Tracking Slip
Program Category Status Project Type
Non -discharge In review Major modification
Permit Type
Gravity Sewer Extension, Pump Stations, & Pressure Sewer Extensions
Primary Reviewer
dean.hunkele
Coastal SWRule
Permitted Flow
548,723
Facility
Facility Name
Brunswick Forest Collection System
Location Address
Owner
Version Permit Classification
Z05 Individual
Permit Contact Atiliation
Major/Minor Region
Minor Wilmington
County
Brunswick
Facility Contact Affiliation
Owner Name Owner Type
Town of Leland Government - Municipal
Owner Affiliation
David A. Hollis
PE
102 Town Hall or
Dates/Events Leland NC 28451
Scheduled
Ong Issue App Received Draft Initiated Issuance Public Notice Issue Effective Expiration
3/24/2005 12/19/2016
Regulated Activities W Requested IReceived Events
Any ,m t o.mnlex Additional information requested .
State of North Carolina
DWR Department of Environmental Quality
Division of Water Resources
15A NCAC 02T .0300 - FAST TRACK SEWER SYSTEM EXTENSION APPLICATION
Division of Water Resources FTA 04-16 & SUPPORTING DOCUMENTATION
Application Number: a �Q sO I (to be completed by DwR)
All items must be completed or the application will be returned
I. APPLICANT INFORMATION:
1. Applicant's name: Town of Leland (company, municipality, HOA, utility, etc.)
2. Applicant type: ❑ Individual ❑ Corporation ❑ General Partnership
❑ Federal ❑ State/County ® Municipal
3. Signature authority's name: David A. Hollis. P.E. per 15A NCAC 02T .0106(b)
Title: Town Manager
4. Applicant's mailing address: 102 Town Hall Drive
City: Leland State: NC Zip: 28451-_
5. Applicant's contact information:
Phone number: 910 371-0148 Email Address: dhollis(a townofleland.com
H. PROJECT INFORMATION:
❑ Privately -Owned Public Utility
❑ Other
1. Project name: Brunswick Forest, Phase 9 Brunswick Parkway Extension
2. Application/Project status: ❑ Proposed (New Permit) ® Existing Permit/Project
If a modification, provide the existing permit number: WQ0028587 and issued date: 9/14/2016
If new construction but part of a master plan, provide the existing permit number: WQ0028587
3. County where project is located: Brunswick
4. Approximate Coordinates (Decimal Degrees): Latitude: 34.17485'
5. Parcel ID (if applicable):
(or Parcel ID to closest downstream sewer)
M. CONSULTANT INFORMATION:
1. Professional Engineer: Adam Grady, PE License Number: 043166
Firm: Hanover Design Services, PA
Longitude:-78.044554'
Mailing address: 1123 Floral Parkway EC E I V E
City: Wilmington State: NC Zip: 28403- DEC 9
Phone number: (91J0 343-8002 Email Address: aaradvnandsilm.com 20�
BY°
IV. WASTEWATER TREATMENT FACILITY (W WTF) INFORMATION:
1. Facility Name: Northeast Brunswick Regional Permit Number: NCO085819
Owner Name: Brunswick County
V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different than WWTF):
1. Permit Number(s): W00028587 Downstream (Receiving) Sewer Size: 10 inch
System Wide Collection System Permit Number(s) (if applicable): WQCS00333
Owner Name(s): Town of Leland
FORM: FTA 04-16 Page 1 of 5
VI. GENERAL REQUIREMENTS
1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached?
❑ Yes ❑No ®N'A
2. If the Applicant is a Developer of lots to be sold, has a Developer's Operational Agreement tFOILb1_DEVj been attached?
❑ Yes ❑No ®N.'A
3. If the Applicant is a Home/Property Owners' Assopiiation, has an Operational Agreement (FORM: HOA) been attached?
[]Yes []No ®N.`A
4. Origin of wastewater: (check all that apply):
® Residential Owned ❑ Retail (stores, centers, malls) ❑ Car Wash
❑ Residential Leased ❑ Retail with food preparation/service ❑ Hotel and/or Motels
❑ School ! preschool / day care ❑ Medical? dental ; veterinary facilities ❑ Swimming Pool ?Clubhouse
❑ Food and drink facilities ❑ Church ❑ Swimming Pool/Filter Backwash
❑ Businesses ; offices / factories ❑ Nursing Home ❑ Other (Explain in Attachment)
5. Nature of wastewater: 100 % Domestic: Commercial % Commercial
_ 0/6 Industrial (Sge 15A NCAC 02T .0103(20)1
)"Is there a Pretreatment Program in effect? [:]Yes ® No
6. Hasa flow reduction been approved under 15A NCAC 02T .0114(D? ®Yes ❑ No
D If yes, provide a copy of flow reduction approval letter
7. Summarize wastewater generated by project:
Establishment Type (see 02T.01140
Daily Design Flow'-6
No. of Units
Flow
Residential
210 gal/day
200
42,000 GPD
gal/
GPD
gal/
GPD
gal/
GPD
gal/
GPD
gal/
GPD
Total
42,000 GPD
a See 15A NCAC 02T .0114(b), id), (e)(1) and (e)(2) for caveats to wastewater design flow rates (i.e., minimum flow per
dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas;
and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined
in G.S.42AA .
b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table 15A NCAC 02T.01141 shall be
determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data.
8. Wastewater generated by project: 42 000000 GPD (per 15A NCAC 02T .0114)
D Do not include future flows or previously permitted allocations
If permitted flow is zero, indicate why:
❑ Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line
❑ Flow has already been allocated in Permit Number: _
❑ Rehabilitation or replacement of existing sewer with no new flow expected
❑ Other (Explain): _
FORM: FTA 04-16 Page 2 of 5
VIL GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T .0305 & MDC (Gravity Sewers):
1. Summarize gravity sewer to be permitted:
Size (inches) Length (feet) Material
10 785 DR18 PVC
I
D Section II & Ill of the MDC for Permitting of Gravity Sewers contains information related to design criteria
D Section III contains information related to minimum slopes for gravity sewer(s)
D Oversizing lines to meet minimum slope requirement is not allowed and a violation or the MDC
VIII. PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & MDC (Pump Stations/Force Mains):
COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT
1. Pump station number or name: Pump Station 7
2. Approximate Coordinates (Decimal Degrees): Latitude: 34.17485 Longitude:-78.044554`
3. Design flow of the pump station: 0.53 millions gallons per day (firm capacity)
4. Operational point(s) of the pump(s): = gallons per minute at 57 feet total dynamic head (TDH)
5. Summarize the force main to be permitted (for this Pump Station):
Size (inches)
Length (feet)
Material
6
2210
SDR21
6. Power reliability in accordance with 15A NCAC 02T .0305(h)(1):
® Standby power source or pump with automatic activation and telemetry - 15A NCAC 02T .0305(h)(1)(B)_
D Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day
D Must be permanent to facility
Or if the pump station has an average daily flow less than 15,000 gallons per day:
❑ Portable power source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02T
.0305(h)(1)(C)
or
❑ Portable pumping unit with plugged emergency pump connection and telemetry - 15A NCAC 02T .0305(h)(1)(C):
D It shall be demonstrated to the Division that the portable souse is owned or contracted by the applicant (draft agreement)
and is compatible with the station.
D If the portable power souse or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage
capacities and the rotation schedule of the portable power souse or pump, including travel timeframes, shall be provided
in the case of a multiple station power outage.
FORM: FTA 04-16 Page 3 of 5
IX. SETBACKS & SEPARATIONS — (02B .0200 -& 15A NCAC 02T .0305(t)):
1. Does the project comply with all separations found in 15A NCAC 02T .0305(f) & (e)
D 15A NCAC 02T.0305 contains minimum separations that shall be provided for sewers stems:
❑ Yes ❑ No
Setback Parameter*
Separation Required
Storm sewers and other utilities not listed below (vertical)
24 inches
Water mains (vertical -water over sewer including in benched trenches)
18 inches
Water mains (horizontal)
10 feet
Reclaimed water lines (vertical - reclaimed over sewer)
18 inches
Reclaimed water lines horizontal - reclaimed over sewer)
2 feet
"Any private or public water supply source, including any wells, WS-1 waters of Class 1 or
Class II impounded reservoirs used as a source of drinking water
100 feet
"Waters classified WS (except WS-I or WS-V), B, SA, ORW, HQW, or SB from normal
high water (or tide elevation) and wetlands (see item IX.2)
50 feet
"Any other stream, lake, impoundment, or ground water lowering and surface drainage
ditches
10 feet
Any building foundation
5 feet
Any basement
10 feet
Top slope of embankment or cuts of 2 feet or more vertical height
10 feet
Drainage systems and interceptor drains
5 feet
Any swimming pools
10 feet
Final earth grade (vertical)
36 inches
D 15A NCAC 02T.0305(a) contains alternatives where separations in 02T.0305tf) cannot be achieved.
D **Stream classifications can be identified [sing the Division's NC Surface Water Classifications webnaee
D If noncompliance with 02T.0305(f) or (g), see Section X of this application
2. Does the project comply with separation requirements for wetlands? (50 feet of separation) ® Yes ❑ No
D See the Division's draft separation requirements for situations where separation cannot be meet
D No variance is required if the alternative design criteria specified is utilized in design and construction
D As built documents should reference the location of areas effected
3. Does the project comply with all setbacks found in the river basin rules per 15A NCAC 02B .0200? ® Yes [:]No
➢ This would include Trout Buffered Streams per 15A NCAC 213.0202
4. Does the project comply with an individual 404 Permit or any 401 Certifications? ❑ Yes ® No
D Wetland -related permits shall be requested, obtained, and adhered to for projects that impact wetlands or surface waters
D Information can be obtained from the 401 & Buffer Permitting Brancb
5. Does project comply with I-NCAC 02T.01051cN6) (additional permits/certifications)?
Per ILA NCAC 02T.OIOStcN61, directly related environmental permits or certification applications are being prepared, have
been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent perms (erosion and
sedimentation control plans, stormwater management plans, etc.).
& Does this project include any sewer collection lines that are deemed "high -priority?"
Per 15A NCAC 02T.0402, "high -priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer
positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer.
❑ Yes ® No
D If yes, include an attachment with details for each line, including type (aerial line, size, material, and location).
High priority lines shall be inspected by the permittee or its representative at least once every six -months and Inspections
documented per 15A NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit.
FORM: FTA 04-16 Page 4 of 5
X. CERTIFICATIONS:
1. Does the submitted system comply with 15A NCAC 02T the Minimum Design Criteria for the Permitting of Pumo Stations
and Force Mains. Llalest versiop, and the Gravity Sewer Minimum Design Criteria (latest version l as applicable?
® Yes ❑ No
If No, complete and submit the Variance/Alternative Design Request application (VADC 10-14) and supporting documents for
review. Approval of the request is required prior to submittal of the Fast Track Application and suoportine documents
2. Professional Engineers Certification:
name from Application Item I11,1.)
that this application for
has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications,
engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best
of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer
Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting
of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this
submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and
have judged it to be consistent with the proposed design.
NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false
statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may
include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation.
North Carolina Professional Engineer's seal, signature, and date: ����0%%IC 1111/f i
i
SEAL
43165
••.�Vt31Pffi�'� �� I
3. Applicant's Certification per 15A NCAC 02T .0106(b):
/l o D / 0/rn(rt attest that this application for
(Signature Autho ' y's name & title from Application Item 1.3.)
has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of
this application are not completed and that if all required supporting documentation and attachments are not included, this
application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non -
discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties,
injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition
of this permit be violated. I also understand that if all required parts of this application package are not completed and that if
all required supporting information and attachments are not included, this application package will be returned to me as
incomplete.
NOTE — In accordance with General Statutes 143-215.6A and 143.215.6B. any person who knowingly makes any false
statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may
include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation.
Signature: Date: l0 lG
FORM: FTA 04-16 Page 5 of 5
DWR
Division of Water Resources
State of North Carolina
Department of Environmental Quality
Division of Water Resources
15A NCAC 02T .0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION
FTA 04-16 & SUPPORTING DOCUMENTATION
Application Number:
(to be completed by DWR)
All items must be completed or the application will be returned
I. APPLICANT INFORMATION:
1. Applicant's name: Town of Leland (company, municipality, HOA, utility, etc.)
2. Applicant type: ❑ Individual ❑ Corporation ❑ General Partnership ❑ Privately -Owned Public Utility
❑ Federal ❑ State/County ® Municipal ❑ Other
3. Signature authority's name: David A. Hollis. P.E. per 15A NCAC 02T .0106(b)
Title: Town Manager
4. Applicant's mailing address: 102 Town Hall Drive
City: Leland State: NC Zip: 28451-_
5. Applicant's contact information:
Phone number: (9M) 371-0148 Email Address: dhollis ,townoffeland.com
II. PROJECT INFORMATION:
1. Project name: Brunswick Forest, Phase 9 Section 3
2. Application/Project status: ❑ Proposed (New Permit) ® Existing Permit/Project
If a modification, provide the existing permit number: W00028587 and issued date: 9 A K
If new construction but part of a master plan, provide the existing permit number: WQ0028587
3. County where project is located: Brunswick
4. Approximate Coordinates (Decimal Degrees): Latitude: 34.16703' Longitude:-78.036899'
5. Parcel ID (if applicable):
(or Parcel ID to closest downstream sewer)
III. CONSULTANT INFORMATION:
1. Professional Engineer: Adam Grady, PE License Number: 043166
Firm: Hanover Design Services, PA
Mailing address: 1123 Floral Parkway
City: Wilmington State: NC Zip: 28403-
Phone number: (910) 343-8002 Email Address: agradvna,hdsilm.com
IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION:
1. Facility Name: Northeast Brunswick Regional
Owner Name: Brunswick County
Permit Number: NCO085819
V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different than W WTF):
1. Permit Number(s): WQ0028587 Downstream (Receiving) Sewer Size: 10 inch
System Wide Collection System Permit Number(s) (if applicable): WQCS t)0 3
Owner Name(s): Town of Leland
FORM: FTA 04-16 Page 1 of 5
VI. GENERAL REQUIREMENTS
1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached?
❑ Yes [—]No ®N/A
2. If the Applicant is a Developer of lots to be sold, has a Developer's Operational Agreement (FORM: DEV) been attached?
❑ Yes [—]No ®N/A
3. If the Applicant is a Home/Property Owners' Association, has an Operational Agreement (FORM: HOA) been attached?
❑ Yes ❑No ®N/A
4. Origin of wastewater: (check all that apply):
® Residential Owned ❑ Retail (stores, centers, malls) ❑ Car Wash
❑ Residential Leased ❑ Retail with food preparation/service ❑ Hotel and/or Motels
❑ School / preschool / day care ❑ Medical / dental / veterinary facilities ❑ Swimming Pool /Clubhouse
❑ Food and drink facilities ❑ Church ❑ Swimming Pool/Filter Backwash
❑ Businesses / offices / factories ❑ Nursing Home ❑ Other (Explain in Attachment)
5. Nature of wastewater: 100 % Domestic/Commercial % Commercial
_ % Industrial (See 15A NCAC 02T .0103(20))
L---->Is there a Pretreatment Program in effect? ❑ Yes ® No
6. Hasa flow reduction been approved under 15A NCAC 02T .0114(f)? ® Yes ❑ No
➢ If yes, provide a copy of flow reduction approval letter
7. Summarize wastewater generated by project:
Establishment Type (see 021.0114(f))
Daily Design Flow °•b
No. of Units
Flow
gal/
GPD
gal/
GPD
gal/
GPD
gal/
GPD
gal/
GPD
gal/
GPD
Total
GPD
a See 15A NCAC 02T .0114(b). (d). (e)(1) and (e)(2) for caveats to wastewater design flow rates (i.e., minimum flow per
dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas;
and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined
in G.S. 42A41.
b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table 15A NCAC 02T.01141 shall be
determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data.
8. Wastewater generated by project: 0 GPD (per 15A NCAC 02T .0114)
➢ Do not include future flows or previously permitted allocations
If permitted flow is zero, indicate why:
❑ Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line
® Flow has already been allocated in Permit Number: Pending
❑ Rehabilitation or replacement of existing sewer with no new flow expected
® Other (Explain): Flow has already been requested in previous application
FORM: FTA 04-16 Page 2 of 5
VH. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T .0305 & MDC (Gravity Sewers):
1. Summarize gravity sewer to be permitted:
Size (inches)
Length (feet)
Material
10
410
DR18 PVC
8
8,939
DR18 PVC
➢ Section II & III of the MDC for Permitting of Gravity Sewers contains information related to design criteria
➢ Section III contains information related to minimum slopes for gravity sewer(s)
➢ Oversizing lines to meet minimum slope requirement is not allowed and a violation of the MDC
VHI. PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & MDC (Pump Stations/Force Mains):
COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT
1. Pump station number or name: Pump Station 8
2. Approximate Coordinates (Decimal Degrees): Latitude: 34.167031' Longitude:-78.036999'
3. Design flow of the pump station: .0972 millions gallons per day (firm capacity)
4. Operational point(s) of the pump(s): 63 gallons per minute at 39 feet total dynamic head (TDH)
5. Summarize the force main to be permitted (for this Pump Station):
Size (inches)
Length (feet)
Material
3
1350
SDR21
6. Power reliability in accordance with 15A NCAC 02T .0305(h)(1):
® Standby power source or pump with automatic activation and telemetry - 15A NCAC 02T .0305(h)(1)(B)_
➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day
➢ Must be permanent to facility
Or if the pump station has an average daily flow less than 15,000 gallons per day:
❑ Portable power source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02T
.0305(h)(1)(C)
or
❑ Portable pumping unit with plugged emergency pump connection and telemetry - 15A NCAC 02T .0305(h)(1)(C):
➢ It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement)
and is compatible with the station.
➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage
capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided
in the case of a multiple station power outage.
FORM: FTA 04-16 Page 3 of 5
IX. SETBACKS & SEPARATIONS — (02B .d1200 & ;15A NCAC 02T .0305(f)):
1. Does the project comply with all separations found in 15A NCAC 02T .0305(f) & W
® Yes ❑ No
➢ 15A NCAC 02T.0305(f) contains minimum separations that shall be provided for sewer systems:
Setback Parameter*
Separation Required
Storm sewers and other utilities not listed below (vertical)
24 inches
Water mains (vertical -water over sewer including in benched trenches)
18 inches
Water mains (horizontal)
10 feet
Reclaimed water lines (vertical - reclaimed over sewer)
18 inches
Reclaimed water lines (horizontal - reclaimed over sewer)
2 feet
**Any private or public water supply source, including any wells, WS-I waters of Class I or
Class H impounded reservoirs used as a source of drinking water
100 feet
**Waters classified WS (except WS-1 or WS-V), B, SA, ORW, HQW, or SB from normal
high water (or tide elevation) and wetlands (see item IX.2)
50 feet
*Any other stream, lake, impoundment, or ground water lowering and surface drainage
ditches
10 feet
Any building foundation
5 feet
Any basement
10 feet
Top slope of embankment or cuts of 2 feet or more vertical height
10 feet
Drainage systems and interceptor drains
5 feet
Any swimming pools
10 feet
Final earth grade (vertical)
36 inches
➢ 15A NCAC 02T.0305(g) contains alternatives where separations in 02T.0305(fl cannot be achieved.
➢ **Stream classifications can be identified using the Division's NC Surface Water Classifications webpaae
➢ If noncompliance with 02T.0305Lfl or (g), see Section X of this application
2. Does the project comply with separation requirements for wetlands? (50 feet of separation) ® Yes [—]No
➢ See the Division's draft separation requirements for situations where separation cannot be meet
➢ No variance is required if the alternative design criteria specified is utilized in design and construction
➢ As built documents should reference the location of areas effected
3. Does the project comply with all setbacks found in the river basin rules per 15A NCAC 02B .0200? ® Yes ❑ No
➢ This would include Trout Buffered Streams per 15A NCAC 2B.0202
4. Does the project comply with an individual 404 Permit or any 401 Certifications? ❑ Yes ® No
➢ Wetland -related permits shall be requested, obtained, and adhered to for projects that impact wetlands or surface waters
➢ Information can be obtained from the 401 & Buffer Permitting Branch
5. Does project comply with 15A NCAC 02T.0105(c)(6) (additional permits/certifications)?
® Yes ❑ No
Per 15A NCAC 02T.0105(c)(6), directly related environmental permits or certification applications are being prepared, have
been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and
sedimentation control plans, stormwater management plans, etc.).
6. Does this project include any sewer collection lines that are deemed "high -priority?"
Per 15A NCAC 02T.0402, "high -priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer
positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer.
❑ Yes ® No
➢ If yes, include an attachment with details for each line, including type (aerial line, size, material, and location).
High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections
documented per 15A NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit.
FORM: FTA 04-16 Page 4 of 5
X. CERTIFICATIONS:
1. Does the submitted system comply with 15A NCAC 02T, the Minimum Design Criteria for the Permitting of Pump Stations
and Force Mains (latest version), and the Gravity Sewer Minimum Design Criteria (latest version) as applicable?
® Yes ❑ No
If No, complete and submit the Variance/Alternative Design Request application (VADC 10-14) and supporting documents for
review. Approval of the request is required prior to submittal of the Fast Track Application and supporting documents.
2. Professional Engineer's Certification:
I, BPPw--y,14'.'GRDV attest that this application for
(Professional Engineer's name from Application Item 111.1.)
has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications,
engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best
of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer
Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting
of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this
submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and
have judged it to be consistent with the proposed design.
NOTE — In accordance with General Statutes 143-215.6A and 143-215.613, any person who knowingly makes any false
statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may
include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation.
North Carolina Professional Engineer's seal, signature, and date:
3. Applicant's Certification per 15A NCAC 02T .0106(b):
I, -Vpv;
(Signature Autho(-ity's name & title from Application Item 1.3.)
CA , i
SS/p �2
ti -:y
SEAL 9r
43166
� 1
®� ' t`?e'clreg.
attest that this application for
has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of
this application are not completed and that if all required supporting documentation and attachments are not included, this
application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non -
discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties,
injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition
of this permit be violated. I also understand that if all required parts of this application package are not completed and that if
all required supporting information and attachments are not included, this application package will be returned to me as
incomplete.
NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false
statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may
include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation.
Sig , 1 is
J I
b nature: Date:
FORM: FTA 04-16 Page 5 of 5
,£ 1 7# ), State of North Carolina
rH"A _ Department of Environmental Quality
Division of Water Resources
Flow Tracking/Acceptance for Sewer Extension Applications
(FTSE 04-16)
Entity Requesting Allocation: Town of Leland.
Project Name for which flow is being requested: Brunswick Forest Phase 9 Section 3
More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for allpump
stations along the route of the proposed wastewater flow.
I. Complete this section only if you are the owner of the wastewater treatment plant.
a. WWTP Facility Name: NORTHEAST BRUNSWICK
b. WWTP Facility Permit #: WQ 0086819
All flows are in MGD
c. WWTP facility's permitted flow 2.475
d. Estimated obligated flow not yet tributary to the WWTP 1.991
e. WWTP facility's actual avg. flow 1.806
f. Total flow for this specific request 0.042
g. Total actual and obligated flows to the facility 3.840
h. Percent of permitted flow used 155%
II. Complete this section for each pump station you are responsible for along the route of this
proposed wastewater flow.
List pump stations located between the project connection point and the WWTP:
(A)
(B)
(C)
CD)=(B+Q (E)=(A-D)
Design
Obligated,
Pump
Average Daily
Approx.
Not Yet
Total Current
Station
Firm Flow**
Current Avg.
Tributary
Flow Plus
(Name or
Capacity, * (Firm / pD,
Daily Flow,
Daily Flow,
Obligated Available
Number)
MGD MGD
MGD
MGD
Flow Capacity***
* The Firm Capacity of any pump station is defined as the maximum pumped flow that
can be achieved with the largest pump taken out of service.
* * Design Average Daily Flow is the perm capacity of the pump station divided by a peaking
factor (pf) not less than 2.5.
*X A Planning Assessment Addendum shall be attached for each pump station located
between the project connection point and the WWTP where the Available Capacity is < 0.
Downstream Facility Name (Sewer):
Downstream Permit Number:
Page 1 of 6
FTSE 04-I6
III. Certification Statement:
I Ann B. Hardy, County Manager certify to the best of my knowledge that the addition of
the volume of wastewater to be permitted in this project has been evaluated along the route to the
receiving wastewater treatment facility and that the flow from this project is not anticipated to
cause any capacity related sanitary sewer overflows or overburden any downstream pump station
en route to the receiving treatment plant under normal circumstances, given the implementation of
the planned improvements identified in the planning assessment where applicable. This analysis
has been performed in accordance with local established policies and procedures using the best
available data. This certification applies to those items listed above in Sections I and II plus all
attached planning assessment addendums for which I am the responsible party. Signature of this
form indicates acceptance of this wastewater flow.
i
Signing Official Signature Date
Page 2 of 6
FTSE 04-16
EcEiVE ` State of North Carolina
JAM
1 2Q11 DWR
Department of Environmental Quality
Division of Water Resources
Phision of water Resources Flow Tracking/Acceptance for Sewer Extension Applications
(FTSE 04-16)
Entity Requesting Allocation: Brunswick Forest
Project Name for which flow is being requested: Brunswick Forest Phase 9 Section 3
More than one FTSE maybe required for a single project if the owner of the Wif'TP is not responsible for all pump
stations along the route of the proposed wastewater flow.
I. Complete this section only if you are the owner of the wastewater treatment plant.
a. WWTP Facility Name:
b. WWTP Facility Permit #:
Al! flows are in MGD
c. WWTP facility's permitted flow
d. Estimated obligated flow not yet tributary to the WWTP
e. WWTP facility's actual avg. flow
f. Total flow for this specific request
g. Total actual and obligated flows to the facility
It. Percent of permitted flow used
II. Complete this section for each pump station you are responsible for along the route of this
proposed wastewater flow.
List pump stations located between the project connection point and the WWTP:
(A) (B) (C) (D)=(B+C) (E)=(A-D)
Design Obligated,
Pump Average Daily Approx. Not Yet Total Current
Station Firm Flow" Current Avg. Tributary Flow Plus
(Name or Capacity, • (Firm i p0, Daily Flow, Daily Flow, Obligated Available
Number) MGD MGD MGD MGD Flow Capacity"'
# 29 BF 0.090 0.023 0.0 0.0 0.0 0.023
428 BF 0.525 0.210 0.0 0.0 0.0 0.210
#27BF 0.672 0.268 0.0 0.042 0.042 0.226
418BF 2.160 0.864 0.205 0.292 0.498 0.366
* The Firm Capacity of any pump station is defined as the maximum pumped flow that
can be achieved with the largest pump taken out of service.
** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking
factor (pi) not less than 2.5.
*** A Planning Assessment Addendum shall be attached for each pump station located
between the project connection point and the WWTP where the Available Capacity is <0.
Downstream Facility Name (Sewer): Town of Leland
Downstream Permit Number: WQCS00333
Page 1 of 6
FTSE 04-16
State of forth Carolina
; � t AM 2017 i))Department of Environmental Quality
Division of Water Resources
DIvIsIon of Water Resources Flow Tracking/Acceptance for Sewer Extension Applications
(FTSE 04-16)
Entity Requesting Allocation: Brunswick Forest
Project Name for which flow is being requested: Brunswick Forest Phase 9 Section 3
More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump
stations along the route of the proposed wastewater flow.
I. Complete this section only if you are the owner of the wastewater treatment plant.
a. WWTP Facility Name:
b. WWTP Facility Permit #:
AlI flows are in MGD
c. WWTP facility's permitted flow
d. Estimated obligated flow not yet tributary to the WWTP
e. WWTP facility's actual avg. flow
f. Total flow for this specific request
g. Total actual and obligated flows to the facility
h. Percent of permitted flow used
Il. Complete this section for each pump station you are responsible for along the route of this
proposed wastewater flow.
List pump stations located between the project connection point and the WWTP:
(A)
Design
Pump
Average Daily
Station
Firm
Flowy4*
(Name or
Capacity, *
(Firm f pf),
Number)
MGD
MGD
#1MG
0.703
0.281
#3 MG
2.177
0.871
(B)
(C)
(D)=(B+C)
(E)=(A-D)
Obligated,
Approx.
Not Yet
Total Current
Current Avg.
Tributary
Flow Plus
Daily Flow,
Daily Flow,
Obligated
Available
MGD
MGD
Flow
Capacity***
0.305
0.347
0.652
-0.371
1.259
0.490
1.750
-0879
Firm Capacity of any pump station is defined as the maximum pumped flow that
can be achieved with the largest pump taken out of service.
** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking
factor (pt) not less than 2.5.
*** A Planning Assessment Addendum shall be attached for each pump station located
between the project connection point and the WWTP where the Available Capacity is < 0.
Downstream Facility Name (Sewer): Town of Leland
Downstream Permit Number: WQCS00333
Page 1 of 6
FTSE 04-16
III. Certification Statement:
I David A. Hollis, Town Manager certify to the best of my knowledge that the addition of
the volume of wastewater to be permitted in this project has been evaluated along the route to the
receiving wastewater treatment facility and that the flow from this project is not anticipated to
cause any capacity related sanitary sewer overflows or overburden any downstream pump station
en route to the receiving treatment plant under normal circumstances, given the implementation of
the planned improvements identified in the planning assessment where applicable. This analysis
has been performed in accordance with local established policies and procedures using the best
available data. This certification applies to those items listed above in Sections I and II plus all
attached planning assessment addendums for which I am the responsible party. Signature of this
forth indicates acceptance of this wastewater flow.
Signing Official Signature Date
Page 2 of 6
FTSE 04-16
PLANNING ASSESSMENT ADDENDUM (PAA)
Submit a planning assessment addendum for each pump station listed in Section II where Available
Capacity is < 0.
Pump Station (Name or Number):
Givers that:
a. The proportion and amount of Obligated, Not Yet Tributary Daily Flow (C) accounts for
94 % and -0.329 MGD of the Available Capacity (E) in Pump Station
# I Front of Magnolia Greens ; and that
b. The rate of activation of this obligated, not yet tributary capacity is currently approximately
0.035 MGD per year; and that
c. A funded Capital Project that will provide the required planned capacity, namely
US 17 Corridor Force Main is in design or under construction with
planned completion in 2016/2017 Budget ; and/or
d. The following applies:
The Town of Leland has a 5 year capital project plan which contains the
recommended plan's and funding for the project. This plan is designed to
take the current and furthure flow from Lift Station # 18 and pump directly
into the Towns Lill Station # 10 which will bypass Lift Station #I
and Lift Station # 3 and flow directly to the Northeast Regional Treatment Plant.
The permit has been received and the bidding process has taken place and the bids received
has been rejected and are going out for rebid.
The construction is projected to begin around March 2017
Therefore:
Given reasonably expected conditions and planning information, there is sufficient justification to
allow this flow to be permitted, without a significant likelihood of over -allocating capacity in the
system infrastructure.
I understand that this does not relieve the collection system owner from complying with G.S. 143-
215.67(a) which prohibits the introduction of any waste in excess of the capacity of the waste
disposal system.
otgntng vfftcrat otgnarure hate
Page 3 of 6
FTSE 04-16
PLANNING ASSESSMENT ADDEND (PAA)
Submit a planning assessment addendum for each pump station listed in Section II where Available
Capacity is < 0.
Pump Station (Name or Number):
Given that:
a. The proportion and amount of Obligated, Not Yet Tributary Daily FIow (C) accounts for
49 % and -0.837 MGD of the Available Capacity (E) in Pump Station
# 3 Magnolia Greens ; and that
b. The rate of activation of this obligated, not yet tributarycapacity is currently approximately
0.038 MGD per year; and that
c. A funded Capital Project that will provide the required planned capacity, namely
US 17 Corridor Force Main is in design or under construction with
planned completion in _2016/2017 Budget ; and/or
d. The following applies:
The Town of Leland has a 5 year capital project plan which contains the
recommended plan's and funding for the project. This plan is designed to
take the current and furthure flow from Lift Station # 18 and pump directly
into the Towns Lift Station # 10 which will bypass Lift Station #1
and Lift Station # 3 and flow directly to the Northeast Regional Treatment Plant.
The permit has been received and the bidding process has taken place and the bids received
has been rejected and are going out for rebid.
The construction is projected to begin around March 2017
Wherefore:
Given reasonably expected conditions and planning information, there is sufficient justification to
allow this flow to be permitted, without a significant likelihood of over -allocating capacity in the
system infrastructure.
I understand that this does not relieve the collection system owner from complying with G.S. 143-
215.67(a) which prohibits the introduction of any waste in excess of the capacity of the waste
disposal system.
Signing /' . Date
Page 3 of 6
FTSE 04-16
PROJECT' NARRATIVE for
Brunswick Forest, Phase 9, Brunswick Parkway Extension
Located in the Town of Leland, Brunswick County, North Carolina
Prepared for:
Funston Land & Timber, LLC
1007 Evangeline Drive
Leland, NC 28451
910-383-1425
Owner:
Funston Land & Timber, LLC
1007 Evangeline Drive
Leland, NC 28451
910-3 83-1425
PROJECT DESCRIPTION —
This project is for the construction of a new pump station on the western side of Sunny
Point Railroad to ultimately serve 1000 units in Phase 9. The project is located in the
previously approved development of "Brunswick Forest" off of Brunswick Forest
Parkway in the Town of Leland, Brunswick County, NC. Pump Station 7 will be initially
staged to serve 500 units. Once that capacity has been reached the station will be
modified to its ultimate design stage to serve 1000 dwelling units. At this time as well
flow is being requested for 200 single family residences that will be connecting to this
pump station in Phase 9 Section 3 just south of the traffic circle.
Flow will enter the pump station through a 10" sewer line that will be extended around
the roundabout for future sewer allocations. From the pump station, sewer will flow
through a proposed 6" force main and will drain into an existing public 10" gravity
collector located on Brunswick Forest Parkway at the eastern side of the rail road. From
there the sewer will flow to pump station 6 located in Phase 2 Section 4. All runoff will
drain into proposed storm sewers and into proposed wet retention / detention ponds
within the limits of the project or to an existing permitted and certified stormwater wet
retention / detention pond on the other side of the parkway.
Please refer to the sewer location map attached with the application for further details.
PROJECT NARRATIVE for
Brunswick Forest, Phase 9, Section 3
Located in the Town of Leland, Brunswick County, North Carolina
Prepared for:
Funston Land & Timber, LLC
1007 Evangeline Drive
Leland, NC 28451
910-3 83-1425
Owner:
t. Funston Land & Timber, LLC
1007 Evangeline Drive
Leland, NC 28451
910-383-1425
PROJECT DESCRIPTION —
This modification request is for the construction of sewer infrastructure and a minor
pump station (Pump Station. 8) for Brunswick Forest Phase 9 Section 3. The project is
located just South of the Brunswick Forest Circle in the Town of Leland, Brunswick
County, NC. The allocation of the 42,000 GPD for the 200 single family units has already
been requested with the Brunswick Parkway Extension modification request which
coincides with this project and is also a part of this total package.
The northern half of the residential area will be serviced solely by an 8" gravity sewer that
will flow to a 10" gravity main that that will run along Green Spring Blvd. The proposed
10" line will tie into a proposed manhole located just south of the Brunswick Forest
Parkway Circle. From there the sewer will flow to proposed pump station 7. The
southern half of the residential area will be serviced by an 8" gravity sewer that flows to
proposed pump station number 8. A 3" force main will take the flow from the pump
station and will tie in into the northern 8" sewer network.
All runoff will drain into proposed storm sewers and into proposed wet retention /
detention ponds within the limits of the project. or to an existing permitted and certified
stormwater wet retention / detention pond on the other side of the parkway.
This modification request is being sent along with the Parkway Extension request in
hopes that they can be handled in one overall modification. Please let us know if
additional information is needed.
Hanover Design Services, P.A.
Land Surveyors, Engineers, Land Planners
December 12, 2016
Mr. Dean Hunkele
Department of Environment and Natural Resources
Division of Water Quality
127 Cardinal Drive Extension
Wilmington, NC 28405-3845
Re: Brunswick Forest Parkway Extension
New submittal
Town of Leland
Brunswick County
Dean:
Enclosed please find the sewer submittal package for Brunswick Forest Parkway
Extension which is to include:
• A check for $480
• 1- Project narrative
• Project Location Map
• Fast Track Sewer Application and one additional copy
• Flow Tracking/Acceptance for Sewer Extension Application and one
additional copy
• 1- Sewer system Location Map
If you have any questions or comments, please feel free to contact me. Thanks.
Sincerely,
Adam Grady, PE
Hanover Design Services P.A.
agrady@hdsilm.com
(910) 343-8002 Office
(910) 343-9941 Fax
1123 Floral Parkway Wilmington, N.C. 28403 Phone (910) 343-8002 Fax 910) 343-9941
Business Firm License No. C-0597
y I • V
Hunkele, Dean
From: Adam Grady <agrady@hdsilm.com>
Sent: Wednesday, January 18, 2017 6:40 PM
To: Hunkele, Dean
Subject: RE: Brunswick Forest Phase 9 Section 3 and Pump Station 7 sewer apps
Dean,
I hope you are doing well today. Sorry I didn't get back to you sooner we have been pretty busy today. Gravity was run
as far as possible throughout Phase 9 Section 3 directly from Pump Station 7. We are able to service 88 lots with gravity
flowing directly to pump station # 7. The rest of Phase 9 section 3, 112 lots, will be gravity fed by approx. 4815' of 8"
sewer main to Pump station 8 and pumped to the upper system previously mentioned that flows directly to Pump
Station 7. .
Pump Station 8: Will service 112 lots on the southeastern side of Phase 9 section 3.
Pump Station 7: Will service 200 lots ( all of phase 9 Section 3).
Pump Station 7 is designed to ultimately serve 1000 units west of the RR tracks.
Please let me know if you need any more information and clarification. Thanks for your help.
Adam Grady, P.E.
Hanover Design Services, PA
Land Surveyors, Engineers, Land Planners
1123 Floral Parkway
Wilmington, N.C. 28403
Phone: 910-343-8002 Fax: 910-343-9941
From: Hunkele, Dean [mailto:dean.hunkele@ncdenr.gov]
Sent: Wednesday, January 18, 2017 11:10 AM
To: Adam Grady <agrady@hdsilm.com>
Subject: Brunswick Forest Phase 9 Section 3 and Pump Station 7 sewer apps
Importance: High
Adam,
How much of the gravity & how many lots are directly tributary to the smaller pump station #8 and how much gravity &
how many lots are directly tributary to the larger pump station #7?
Dean Hunkele
Senior Environmental Specialist
Water Quality Regional Operations Section
Division of Water Resources
Department of Environmental Quality
1
910.796.7215 Reception Desk
910.796.7380 Direct
910.350.2004 Fax
Dean.HunkeleC@ncdenr.Rov
Wilmington Regional Office
127 Cardinal Drive Ext
Wilmington, NC 25405
'I'Nothing Compares
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties
The goal of the Fast Track sewer permit program is to issue a permit in no more than 30 business days from receipt of a complete application and if
no additional information has to be requested upon full review. Please use the Department's Permit Application Tracker to determine the official
application receipt date to allow you to estimate a date for issuance and find the reviewer's name. Once issued, the record stays on the site for 30
days.
For previously issued sewer permit info or to check on sewer certification receipt status, please use the Division's Sewer Extension Permit
Tracker. Using the Issue Date on top of the Engineer Certification Form is best way to ensure getting what you want especially for multi -version
permits; using today's date only gives info on the latest permit version. Confirmation using this method will replace letters and emails; it is
recommended that confirmation be printed and/or saved.
Links to both trackers can be found on the sewer permitting site here: https://deg.nc.gov/about/divisions/water-resources/water-resources-
perm its/ peres/co I lectio n-syste ms-perm its
Subscribe to Collection System Updates listserve to receive automatic alerts for changes to applications, policies, regulations, etc.
9i
Leland # 27
Permit WQ0028587 Mod i5
PUMP STA No. 6 (MAJOR)
Ph2 Sec4 & Future\ �v' � 00G?
PROPOSED
PUMP STA No. 7 (MAJOR)
Leland # 28
Total Design flow = 525,000 GPD
Average Daily flow = 210,000 GPD
PROPOSED 1
SEWER MAIN
�$ oo
2 Q
o ° o
0
0
ITT
' Phase 2
Section 5
Flow = 9,240 GPD
W i /
1 OLF F
�Sj`✓��� Phase 2 12�O.CO_^�,
/ r
G�6 /,o( v jv
`11'93LF�0198LFO28v ®185�
�0 Section � LOW
�5V e FUTURE DEVELOPMENT
Future flow = 13,650 GPD
Y �
F°
Phase 9,,
Currently anticipated flow = 336,840
6" Force Main
Ph! >�ection 3
10" Gravity Sewer
Fr 000 GPD
SEWER LOCATION
DRAWN
AHG
DATE
10/21/2016
BRUNSWICK FOREST
PARKWAY EXTENSION
APPROVED
DATE
SCALE
1 "= 400
SHEET
1
PROJECT NO.
8829
SEWER LOCA710N.dw9Leywtl 12/16/2016 11:11:131 : 400
PROPOSED (Pending) `, �.� ' �0
,�, MPSTA- :o
�� S ��
LeandK#18:� L ---�, �'Q�
otarDesgn flow - 525,000 GPD-
lAVerage Daily flow = 210,000 GPD
l 1
x �
,O' I
BrUns Ick Forest Pkwy Extension ®B.uns'wick Pkwy Extension #
yy,, 1 jbPhase 9 Section 3 #
Permit4bodification request pendin
Sent in atlsame time
ti
t�
Phase -f:5��
'r1 icipa 'ed flow W= 336
42,
0
PhaSe 2
f
Section 6
FUTURE DEVELOPMENT
%% Futur- flow 13.650 GPD
f � -.
N
NU
f' '��a\N
FORCE MAIN
CONNECTION
PRO -POSER (MINOR) li
PUMP SETA No.8
ei n flow = 90,720 GP
e Daily flow - 23,520 G
SEWER LOCATION
DRAWN
AHG
DATE
12/5/2016
APPROVED
DATE
SCALE
1 "=400
SHEET
1
PROJECT NO.
PHASE 9 SEC. 3
SEWER LOCAT10N.dwg Laycutl.12116/201611:02:501 : 400