HomeMy WebLinkAbout20190425 Ver 1_Receipt_20190815ROY COOPER Governor MICHAEL S. REGAN Secretary TIM BAUMGARTNER Director Jason Brown Piedmont Natural Gas PO Box 33068 Charlotte, NC 28233 NORTH CAROLINA Environmental Quality RECEIPT August 15, 2019 Project: Line 451 Duke Marshall Steam Plant Pipeline County: Lincoln 401 permit#: 2019-0425 404 permit#: 2015-01412 DMS ID#: MR -07153 Amount Paid: $369,655.11 Check Number: 1000008712 The NCDEQ Division of Mitigation Services (DMS) has received a check as indicated above as payment for the compensatory mitigation requirements of the 401 Water Quality Certification/Section 404 Permit(s) issued for the above -referenced project. This receipt serves as notification that your compensatory mitigation requirements assigned to DMS associated with the authorized activity as specified below have been satisfied. You must also comply with all other conditions of this certification and any other state, federal or local government permits or authorization associated with this activity including G.S. § 143-214.11. The DMS, by acceptance of this payment, acknowledges that the Division is responsible for the compensatory mitigation requirements indicated below associated with the project permit and agrees to provide the compensatory mitigation as specified in the permit. Mitigation responsibility assigned to the DMS is nontransferable. The mitigation will be performed in accordance with the In -Lieu Fee Program instrument dated July 28, 2010. Mitigation Location Mitigation Type Credits Catawba 03050101 Warm Stream 233 Catawba 03050101 Riparian Wetland 2.3 Catawba Buffer Riparian Buffer 6,000 Refunds of payments made to NCDMS are only approved under certain conditions. All refund requests must be submitted in accordance with the Division's refund policy. If you have any questions or need additional information, please contact Kelly Williams at (919) 707-8915. cc: Todd Tugwell, USACE - Raleigh; Sheri Montalvo, NCDWR Flynt Barksdale, agent Sincerely, FOR Tim Baumgartner Director Catherine Janiczak, USACE NORTHCAROLINAD_EQ�� Department of Environmental Wality North Carolina Department of Environmental Quality I Division of Mitigation Services 217 W. Jones Street 11652 Mail Service Center I Raleigh, North Carolina 27699-1652 919.707.8976 Compensatory Mitigation Responsibility Transfer Form Permittee: Jason Brown Action ID: SAW -2015-01412 Project Name: Line 451 Duke Marshall Stream Plan Pipeline County: Catawba Instructions to Permittee: The Permittee must provide a copy of this form to the Mitigation Sponsor, either an approved Mitigation Bank or the North Carolina Division of Mitigation Services (NCDMS), who will then sign the form to verify the transfer of the mitigation responsibility. Once the Sponsor has signed this form, it is the Permittee's responsibility to ensure that to the U.S. Army Corps of Engineers (USACE) Project Manager identified on page two is in receipt of a signed copy of this form before conducting authorized impacts, unless otherwise specified below. If more than one mitigation Sponsor will be used to provide the mitigation associated with the permit, or if the impacts and/or the mitigation will occur in more than one 8 -digit Hydrologic Unit Code (HUC), multiple forms will be attached to the permit, and the separate forms for each Sponsor and/or HUC must be provided to the appropriate mitigation Sponsors. Instructions to Sponsor: The Sponsor must verify that the mitigation requirements (credits) shown below are available at the identified site. By signing below, the Sponsor is accepting full responsibility for the identified mitigation, regardless of whether or not they have received payment from the Permittee. Once the form is signed, the Sponsor must update the bank ledger and provide a copy of the signed form and the updated bank ledger to the Permittee, the USACE Project Manager, and the Wilmington District Mitigation Office (see contact information on page 2). The Sponsor must also comply with all reporting requirements established in their authorizing instrument. Permitted Impacts and Compensatory Mitigation Requirements: Permitted Impacts Requiring Mitigation* 8 -digit HUC and Basin: 03050101, Catawba River Basin Stream Impacts (linear feet) Wetland Impacts (acres) Warm Cool Cold Riparian Riverine Riparian Non-Riverine Non -Riparian Coastal 167 1.15 *If more than one mitigation sponsor will be used for the permit, only include impacts to be mitigated by this sponsor. Compensatory Mitigation Requirements: 8 -digit HUC and Basin: 03050101, Catawba River Basin Stream Mitigation (credits) Wetland Mitigation (credits) Warm Cool Cold Riparian Riverine Riparian Non-Riverine Non -Riparian Coastal 233 2.30 Mitigation Site Debited: NCDMS (List the name of the bank to be debited. For umbrella banks, also list the specific site. acceptance letter identifies a specific site, also list the specific site to be debited). For NCDMS, list NCDMS. If the NCDMS Section to be completed by the Mitigation Sponsor Statement of Mitigation Liability Acceptance: I, the undersigned, verify that I am authorized to approve mitigation transactions for the Mitigation Sponsor shown below, and I certify that the Sponsor agrees to accept full responsibility for providing the mitigation identified in this document (see the table above), associated with the USACE Permittee and Action ID number shown. I also verify that released credits (and/or advance credits for NCDMS), as approved by the USACE, are currently available at the mitigation site identified above. Further, I understand that if the Sponsor fails to provide the required compensatory mitigation, the USACE Wilmington District Engineer may pursue measures against the Sponsor to ensure compliance associated with the mitigation requirements. Mitigation Sponsor Name: NCDMS Name of Sponsor's Authorized Representative: Kelly Williams 15 August 2019 Signature of Sponsor's Authorized Representative Date of Signature Conditions for Transfer of Compensatory Mitigation Credit: • Once this document has been signed by the Mitigation Sponsor and the USACE is in receipt of the signed form, the Permittee is no longer responsible for providing the mitigation identified in this form, though the Permittee remains responsible for any other mitigation requirements stated in the permit conditions. • Construction within jurisdictional areas authorized by the permit identified on page one of this form can begin only after the USACE is in receipt of a copy of this document signed by the Sponsor, confirming that the Sponsor has accepted responsibility for providing the mitigation requirements listed herein. For authorized impacts conducted by the North Carolina Department of Transportation (NCDOT), construction within jurisdictional areas may proceed upon permit issuance; however, a copy of this form signed by the Sponsor must be provided to the USACE within 30 days of permit issuance. NCDOT remains fully responsible for the mitigation until the USACE has received this form, confirming that the Sponsor has accepted responsibility for providing the mitigation requirements listed herein. • Signed copies of this document must be retained by the Permittee, Mitigation Sponsor, and in the USACE administrative records for both the permit and the Bank/ILF Instrument. It is the Permittee's responsibility to ensure that the USACE Project Manager (address below) is provided with a signed copy of this form. • If changes are proposed to the type, amount, or location of mitigation after this form has been signed and returned to the USACE, the Sponsor must obtain case-by-case approval from the USACE Project Manager and/or North Carolina Interagency Review Team (NCIRT). If approved, higher mitigation ratios may be applied, as per current District guidance and a new version of this form must be completed and included in the USACE administrative records for both the permit and the Bank/ILF Instrument. Comments/Additional Conditions: A letter from NCDMS, confirming their willing and able to accept the applicants compensatory mitigation responsibility, dated 3/13/2019 was included with the preconstruction notification. This form is not valid unless signed below by the USACE Project Manager and by the Mitigation Sponsor on Page 1. Once signed, the Sponsor should provide copies of this form along with an updated bank ledger to: 1) the Permittee, 2) the USACE Project Manager at the address below, and 3) the Wilmington District Mitigation Office, Attn: Todd Tugwell, 11405 Falls of Neuse Road, Wake Forest, NC27587 (email: todd.tugwell@usace.army.mil). Questions regarding this form or any of the permit conditions may be directed to the USACE Project Manager below. USACE Project Manager: Catherine M. Janiczak USACE Field Office: Charlotte Regulatory Office US Army Corps of Engineers 8430 University Executive Park Drive, Suite 615 Charlotte, North Carolina 28262 Email: Catherine.M.Janiczak@usace.army.mil USACE Project Manager 'gnatur 06/13/2019 Date of Signature Current Wilmington District mitigation guidance, including information on mitigation ratios, functional assessments, and mitigation bank location and availability, and credit classifications (including stream temperature and wetland groupings) is available at http://ribits.usace.army.miI