Loading...
HomeMy WebLinkAboutWQCS00100_Inspection_20190808DocuSign Envelope ID: A6453667-4C88-4587-ACE2-4A98EFB0350F ROY COOPED Covemar MICHAEL S. R.EGAN Secretary LINDA CULPEPPER OZrNrtpr Daniel K Williams Town of Morehead City 706 Arendell Street Morehead City, NC 28557-4234 NORTH CARODNA Environmental Quality August 13, 2019 SUBJECT: Compliance Inspection Report Morehead City Collection System Collection System Permit No. WQCS00100 Carteret County Dear Permittee: The North Carolina Division of Water Resources conducted an inspection of the Morehead City Collection System on 8/08/2019. This inspection was conducted to verify that the facility is operating in compliance with the conditions and limitations specified in Collection System Permit No. WQCS00100. The findings and comments noted during this inspection are provided in the enclosed copy of the inspection report entitled "Compliance Inspection Report". There were no significant issues or findings noted during the inspection and therefore, a response to this inspection report is not required. If you should have any questions, please do not hesitate to contact Helen Perez with the Water Quality Regional Operations Section in the Wilmington Regional Office at 910-796-7215 or via email at helen.perez@ncdenr.gov. Sincerely, DocuSigned by: I ONE �Aarrl Oti for 7F141E73B6F3456... Morelia Sanchez -King, Regional Supervisor Water Quality Regional Operations Section Wilmington Regional Office Division of Water Resources, NCDEQ ATTACHMENTS Cc: Derek Williams — electronic copy Uploaded to laser fiche North CawEnsDepart mentofEnvironmeatalQua?rty I DiuisionofWater Resources Wilmington Reg•3iLa-Dffioe 1 127 C.ard5aaiDrive Extenson I Winra:ngton, North; ar•xms2A405 - 910-796-7215 DocuSign Envelope ID: A6453667-4C88-4587-ACE2-4A98EFB0350F Comaliance Insoection Resort Permit: WQCS00100 Effective: 06/01/13 Expiration: 05/31/21 owner: Town of Morehead City SOC: Effective: Expiration: Facility: Morehead City Collection System County: Carteret Region: Wilmington Contact Person: Daniel K Williams Directions to Facility: System Classifications: CS2, PrimaryORC: Derek A Williams Secondary ORC(s): On -Site Representative(s): On -site representative Title: Public Utilities Director Certification: 992237 Derek Williams Phone: 252-726-6848 Ext.133 Phone: 252-726-5022 252-756-5022 Related Permits: NC0026611 Town of Morehead City - Morehead City WWTP Inspection Date: 08/08/2019 EntryTime: 10:15AM Exit Time: 12:30PM Primary Inspector: Helen I PerezE Di°sgned y. �e �e Q/�R y� DocuSigned by: Phone: 910-796-7387 Secondary Inspector(s): (J �T �T 1D645B4A39694BE... IOAti lY�affl1 Robb Mairs 7F141E73B6F3456... Reason for Inspection: Routine Inspection Type: Collection System Inspect Non Sampling Permit Inspection Type: Collection system management and operation Facility Status: Compliant Not Compliant Question Areas: Miscellaneous Questions General Sewer & FOG Ordinances Capital Improvement Plan Map Reporting Requirements Inspections Spill Response Plan Spills Lines Pump Stations (See attachment summary) Page 1 of 7 DocuSign Envelope ID: A6453667-4C88-4587-ACE2-4A98EFB0350F Permit: WQCS00100 Owner - Facility: Town of Morehead City Inspection Date: 08/08/2019 Inspection Type : Collection System Inspect Non Sampling Reason for Visit: Routine Inspection Summary: A routine compliance inspection of the Town of Morehead City Collection System was conducted on August 8, 2019. The purpose of the evaluation was to verify that the facility is operating in compliance with the conditions and limitations specified in Permit WQCS00100. Derek Williams, ORC, Chad Sutton, ORC of WWTP, Chuck Falls, Assistant Public Services Director, and collection system staff were present during the inspection. Records were readily available, organized and complete. The Town continues to improve the operation of the collection system. Since the last inspection, the smoke testing of the entire system was completed and 160 cleanouts were maintained as a result. Older pump stations are being upgraded; PS 16 & 17 last year, PS 20 is scheduled for this year and PS 6 &7 are due next year. Money is allocated in the Capital Improvement Plan each year for GIS mapping to update the current paper maps. This year, software was implemented for the documentation of CCTV camera operations. The Town of Morehead City is compliant with collection system permit WQCS00100. Please review the comment sections of the inspection report for more details. Page 2 of 7 DocuSign Envelope ID: A6453667-4C88-4587-ACE2-4A98EFB0350F Permit: WQCS00100 Owner - Facility: Town of Morehead City Inspection Date: 08/08/2019 Inspection Type : Collection System Inspect Non Sampling Reason for Visit: Routine General Yes No NA NE Is there a properly designated primary ORC and at least one back-up of proper grade? 0 ❑ ❑ ❑ Are logs being reviewed by the system management or owner on a regular basis? 0 ❑ ❑ ❑ # What is that frequency? daily # Are there any issues being addressed currently or any in the planning stages? 0 ❑ ❑ ❑ Is there a specific pump failure plan available for all pump stations? ❑ ❑ ❑ Does plan indicate if pump parts/new pumps are in spare parts/equipment inventory? ❑ ❑ ❑ Are new/significantly upgraded pump stations equipped with anti -corrosion materials? ❑ ❑ ❑ Does the permittee have a copy of their permit? ❑ ❑ ❑ # Is permit expiring within the next 6 months? ❑ ❑ ❑ If Yes, has the Permittee applied for renewal? ❑ ❑ ❑ Comment: Since the collapse and repair of the Evans Street hiah priority line in March 2018. plans are in place to move the line from the shoreline to the backside of the residential properties along the shore. Sewer and FOG Ordinances Yes No NA NE Is Sewer Use Ordinance (SUO) or other Legal Authority available? ❑ ❑ ❑ Does it appear that the Sewer Use Ordinance is enforced? ❑ ❑ ❑ Is there a Grease Control Program that legally requires grease control devices? ❑ ❑ ❑ What is the standard grease trap cleaning requirement in the FOG ordinance? monthly Is Grease Control Program enforced via periodic inspections/records review? ❑ ❑ ❑ Is action taken against violators? ❑ ❑ ❑ # Have satellite systems adopted an equivalent or more stringent ordinance? ❑ ❑ ❑ Is grease/sewer education program documented with req'd customer distribution? ❑ ❑ ❑ # Are other types of education tools used like websites, booths, special meetings, etc? ❑ ❑ ❑ If Yes, what are they? (This can reduce mailing to annual.) The Town's website. Comment: Grease/sewer education materials are distributed by mail to customers twice a year. This year they were mailed in January and April. There are approximately 130 grease traps that are inspected every 4 months. Inspection reports and copies of issued NOVs were made available for review. Capital Improvement Plan Yes No NA NE Has a Capital (CIP) or System Improvement Plan been developed and adopted? 0 ❑ ❑ ❑ Is it designated for wastewater only or does it have a dedicated section? ❑ ❑ ❑ Does CIP cover three to five year period of earmarked improvements? ❑ ❑ ❑ Does CIP include description of project area? ❑ ❑ ❑ Does CIP include description of existing facilities? ❑ ❑ ❑ Page 3 of 7 DocuSign Envelope ID: A6453667-4C88-4587-ACE2-4A98EFB0350F Permit: WQCS00100 Owner - Facility: Town of Morehead City Inspection Date: 08/08/2019 Inspection Type : Collection System Inspect Non Sampling Reason for Visit: Routine Does CIP include known deficiencies? 0 ❑ ❑ ❑ Does CIP include forecasted future needs? 0 ❑ ❑ ❑ Comment: No comment. Map Yes No NA NE Is there a overall sewer system map? ❑ ❑ ❑ Does the map include: Pipe Type (GS/FM) ❑ ❑ ❑ Pipe sizes ❑ ❑ ❑ Pipe materials (PVC, DIP, etc) ❑ ❑ ❑ Pipe location ❑ ❑ ❑ Flow direction ❑ ❑ ❑ Approximate pipe age ❑ ❑ ❑ Pump station ID, location and capacity ❑ ❑ ❑ # Force main air release valve location & type ❑ ❑ ❑ # Location of satellite connections ❑ ❑ ❑ Is the map being updated for changes/additions within 1 year of activation? 0 ❑ ❑ ❑ Comment: The Town is currently updating their paper maps to a GIS mapping system. The CIP includes $50,000 a year for this update until it is complete. Reporting Requirements Yes No NA NE # Have there been any sewer spills in the past 3 years? ❑ ❑ ❑ If Yes, were they reported to the Division if meeting the reportable criteria? ❑ ❑ ❑ If applicable, is there documentation of press releases and public notices issued? ❑ ❑ ❑ Is an Annual Wastewater Performance Report being filed with the Division, if required? ❑ ❑ ❑ Is the report being made available to all its sewer customers? 0 ❑ ❑ ❑ # How is it being made available? website, newspaper Comment: No comment. Inspections Yes No NA NE Are adequate maintenance records maintained? ❑ ❑ ❑ Are pump stations being inspected at the required frequency? ❑ ❑ ❑ # Is at least one complete functionality test conducted weekly per pump station? ❑ ❑ ❑ Is there a system or plan in place to observe the entire system annually? ❑ ❑ ❑ Is the annual inspection documented? ❑ ❑ ❑ # Does the system have any high -priority lines/locations? ❑ ❑ ❑ Are inspections of HPL documented at least every 6 months? ❑ ❑ ❑ Are new lines being added to the HPL list when found or created? 0 ❑ ❑ ❑ Page 4 of 7 DocuSign Envelope ID: A6453667-4C88-4587-ACE2-4A98EFB0350F Permit: WQCS00100 Owner - Facility: Town of Morehead City Inspection Date: 08/08/2019 Inspection Type : Collection System Inspect Non Sampling Reason for Visit: Routine Comment: The Town has 8 high priority lines and they are inspected, at a minimum, every 6 months. The Evans Street shoreline high priority line has been inspected every day since the line collapsed in March 2018. Spill Response Action Plan Yes No NA NE Is a Spill Response Action Plan available? 0 ❑ ❑ ❑ Is a Spill Response Action Plan available for all personnel? 0 ❑ ❑ ❑ Does the plan include 24-hour contact numbers ❑ ❑ ❑ Response time ❑ ❑ ❑ Equipment list and spare parts inventory ❑ ❑ ❑ Access to cleaning equipment ❑ ❑ ❑ Access to construction crews, contractors, and/or engineers ❑ ❑ ❑ Source of emergency funds ❑ ❑ ❑ Site sanitation and cleanup materials ❑ ❑ ❑ Post-overflow/spill assessment ❑ ❑ ❑ Does the Permittee appear to respond within 2 hours of first knowledge of a spill? 0 ❑ ❑ ❑ Comment: The Spill Response Plan is located at the main office and in every staff truck. al!IEE Yes No NA NE Is system free of known points of bypass? 0 ❑ ❑ ❑ If No, describe type of bypass and location Are all spills or sewer related issues/complaints documented? ❑ ❑ ❑ # Are there repeated overflows/problems (2 or more in 12 months) at same location? ❑ ❑ ❑ # If Yes, is there a corrective action plan? ❑ ❑ ❑ Comment: Paper copies of all non -reportable spills and complaints are on file by year. Lines/Right-of-Ways/Aerial Lines Yes No NA NE Please list the Lines/Right of Ways/Aerial Lines Inspected: Evans Street high priority line. Are right-of-ways/easements maintained for full width for access by staff/equipment? ❑ ❑ ❑ If No, give details on temporary access: Is maintenance documented? ❑ ❑ ❑ Are gravity sewer cleaning records available? ❑ ❑ ❑ Has at least 10% of lines older than 5 yrs been cleaned annually? ❑ ❑ ❑ Were all areas/lines inspected free of issues? 0 ❑ ❑ ❑ Comment: In April of this year, the town implemented the software program, PipeLogix, for the documentation of CCTV camera operations. The ROWS are maintained every month during the summer by a contract company. Pump Stations Yes No NA NE Page 5 of 7 DocuSign Envelope ID: A6453667-4C88-4587-ACE2-4A98EFB0350F Permit: WQCS00100 Owner - Facility: Town of Morehead City Inspection Date: 08/08/2019 Inspection Type : Collection System Inspect Non Sampling Reason for Visit: Routine Please list the Pump Stations Inspected: 18A - 261 Arthur Farm Rd 12B - 102 Salem Ave 1 - 3405 Evans St 2 - 400 S. 18th St 3 - 813 Shepard St # Number of duplex or larger pump stations in system # Number of vacuum stations in system # Number of simplex pump stations in system # Number of simplex pump stations in system serving more than one building How many pump/vacuum stations have: # A two-way "auto polling" communication system (SCADA) installed? # A simple one-way telemetry/communication system (auto -dialer) installed? For pump stations inspected: Are they secure with restricted access? Were they free of by-pass structures/pipes? Were wet wells free of excessive grease/debris? # Do they all have telemetry installed? Is the communication system functional? Is a 24-hour notification sign posted ? Does the sign include: Owner Name? Pump station identifier? # Address? Instructions for notification? 24-hour emergency contact numbers? Are audio and visual alarms present? Are audio and visual alarms operable? # Is there a backup generator or bypass pump connected? If tested during inspection, did it function properly? Is the back-up system tested at least bi-annually under normal operating conditions? # Does it have a dedicated connection for a portable generator? # Is the owner relying on portable units in the event of a power outage? # If Yes, is there a distribution plan? If Yes, what resources (Units/Staff/Vehicles/etc) are included in Plan? # Does Permittee have the approved percentage of replacement simplex pumps? Is recordkeeping of pump station inspection and maintenance program adequate? Do pump station logs include at a minimum: 37 0 0 0 29 8 ❑■❑❑ ■❑❑❑ ■❑❑❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ ❑❑❑■ Page 6 of 7 DocuSign Envelope ID: A6453667-4C88-4587-ACE2-4A98EFB0350F Permit: WQCS00100 Owner - Facility: Town of Morehead City Inspection Date: 08/08/2019 Inspection Type : Collection System Inspect Non Sampling Reason for Visit: Routine Inside and outside cleaning and debris removal? Inspecting and exercising all valves? ❑❑❑■ ■❑❑❑ Inspecting and lubricating pumps and other equipment? 0 ❑ ❑ ❑ Inspecting alarms, telemetry and auxiliary equipment? 0 ❑ ❑ ❑ Comment: Pump Stations are inspected approximately 3 times a week. Daily sheets record pump run times and alarm testing and a log book documents operation and maintenance performed. Thirty-one of the 37 pump stations have a on -site generator. The Town has 4 portable generators and a portable bypass pump. The generators are tested under load weekly. PS 18A is a new 2019 PS with fine sceen system located within the fence of the WTP. Audio alarm for PS 3 needs to be repaired. Page 7 of 7