August 12, 2019
N.C. Department of Transportation
Natural Environment Section
1598 Mail Service Center
Raleigh, NC 27699-1598
ATTN: Philip S. Harris, III, P.E., C.P.M., Unit I Iead
RE: CAMA Major Permit Application for the proposed Replacement of Bridge No. 38 over
Trent Creek on NC 55 in Pamlico County, NC. TIP No. B-4593.
Dear Mr. Harris,
This letter is in response to a permit application request under the Coastal Area Management Act
(CAMA) from the N.C. Department of Transportation (NCDOT) for the above referenced
project.
Processing of the permit application package for this project, which was received as complete by
the Division of Coastal Management's (DCM's) Morehead City District office on June 7, 2019,
is ongoing. However, it has been determined that additional information will be required prior to
DCM taking final action on your application. These items are summarized below:
On July 16, 2019, NCDOT notified DCM by e-mail that the Utilities plans for this project
have changed. Therefore, a CAMA permit application revision request is required to
include any changes to the final design, including those for the utilities. The items
needed may include a narrative of any changes, revised plan sheets, revised permit
application forms, and a revised Impact Summary Table.
In that the rules of the Coastal Resources Commission state that "If the application is found to be
incomplete or inaccurate after processing has begun or if additional information from the
applicant is necessary to adequately assess the project, the processing shall be terminated
pending receipt of the necessary changes or necessary information from the applicant"
[T 1 5A: 07J. 0204(d)], the Division has determined that in cases such as this, the additional
information requested by DCM must be obtained prior to making a final permit decision.
Therefore, it is necessary that processing of your permit application be placed in abeyance until
such time as the requested information for the proposed project is provided to DCM.
Y+E
NORTm CA 041Nl4
uaµruneM of EWIV 131 au.
North Carolina Department of Environmental Quality I Division of Coastal Management
DWR Wetlands Unit 1 512 North Salisbury Street 1 1617 Mail Service Center f Raleigh, North Carolina 27699-1617
919.707.9149
As required by T 1 5A:07J. 0204(d), during the pendency of any termination of processing, the
permit processing period will not run. Upon resolution of the above listed items, DCM will
resume processing of the application at the point where it was terminated.
Please feel free to contact me or Stephen Lane if you have any questions or concerns. I can be
reached by phone at 919-707-9149 or e-mail at Cathy. Brittirip-harngncdenngov. Stephen can be
reached by phone at 252-808-2808 ext. 208 or e-mail at Stephen. Lane cr,ncdenr.gov.
Cc: Doug Huggett, DCM
Stephen Lane, DCM
Garcy Ward, DWR
Tom Steffens, USAGE
Gordon Cashin, NCDOT
Sincerely,
Cathy Brittingham
Transportation Project Coordinator