Loading...
HomeMy WebLinkAboutNCS000478_SW Phase II Post-C Annual Insp. Req_20190812TOWN OF _ 1 L PAV bi L I � A�i6o` 11, 1 R_ _ El qa�4__&6" STORMWATER PHASE II POST -CONSTRUCTION ANNUAL INSPECTION REQUIREMENTS Date Property Owner/ Homeowner Association RE: Annual Inspection for Structural Stormwater BMP(s) located on site Dear Property Owner/HOA, It is that time when the structural stormwater Best Management Practice (BMP) has been in place for one year or more and is ready for its required annual inspection. The Town of Laurel Park has a Storm Water Management Ordinance that was adopted in January 1, 2008, and can be found in Chapter 53 of the Code of Ordinances. When this development was issued a stormwater permit, the developer was required to install a structural stormwater BMP to treat water quality. I have enclosed the required form to be completed by a design professional and submitted by to our office within thirty (30) days of receipt. We appreciate your cooperation in this matter and if you need any assistance please do not hesitate to contact us direct at (828) 694-6553 or nberry@hendersoncountync.gov. Respectfully, Natalie J. Berry, P.E. Water Quality Administrator 100 N. King Street, Suite 118. Hendersonville, NC 28792 (828) 694-6553