HomeMy WebLinkAbout20170887 Ver 1_USACE As-Built Baseline Monitoring Report Review_20190816Strickland, Bev
From: Dailey, Samantha J CIV USARMY CESAW (USA) <Samantha.J.Dailey@usace.army.mil>
Sent: Friday, August 16, 2019 8:48 AM
To: Tugwell, Todd J CIV USARMY CESAW (US); Kim Browning; Haupt, Mac; Davis, Erin B;
Wilson, Travis W.; Bowers, Todd
Subject: [External] SAW -2016-02365 / Wildlands Engineering / Cane Creek UMBI / Bethel
Branch As -Built Baseline Monitoring Report
Follow Up Flag: Follow up
Flag Status: Flagged
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an
attachment to report.spam@nc.gov<maiIto: report.spam@nc.gov>
Good morning,
The below referenced Baseline Monitoring Document and As -Built Report review has been requested by Wildlands
Engineering, Inc. Per Section 332.8(0)(9) of the 2008 Mitigation Rule, this review follows the streamlined review
process, which requires an IRT review period of 15 calendar days from this email notification. Please provide any
comments by 5 PM on the 15 -day comment deadline shown below. When providing comments please indicate if your
concerns are great enough that you intend to request a site visit prior to the initial credit release. Comments provided
after the 15 -day comment deadline (shown below) may not be considered.
At the conclusion of this comment period, a copy of all comments will be provided to Wildlands Engineering, Inc. and the
NCIRT along with District Engineer's intent to approve or disapprove this Baseline Monitoring Document and As -Built
Report implementation credit release.
Sponsor: Wildlands Engineering, Inc.
Name: Cane Creek UMBI / Bethel Branch Mitigation Site
USACE ID:
SAW -2016-02365
River Basin:
Cape Fear
H UC:
03030002
County:
Chatham
Please note that the mitigation plan credits are different than the as -Built credits. The Sponsor indicated that the stream
mitigation units (SMUs) were reduced from 5,228 to 5,202 as a result of not having buffer on the right side of UTI Reach
2 and UT2 Reach 4. In addition, the Sponsor indicated that due to a miscalculation in the final mitigation plan, the
wetland mitigation units (WMUs) increased from 3.107 to 3.14. In conclusion, the revised SMUs and WMUs are 5,202
and 3.14, respectively.
The As -Built Implementation Credit Release for the Bethel Branch Mitigation site would entail 15 -percent of the total
stream restoration and enhancement credits: 780.3 stream mitigation units and 0.47 wetland mitigation units.
15 -Day Comment Start Date: August 16, 2019 15 -Day Comment Deadline: August 30, 2019 45 -Day Credit Release
Approval Deadline: August 30, 2019
*NOTE: If a site visit is request by the IRT, comments are due 15 days after the site visit is complete.
Mitigation Plan lengths may vary from the As-Builts.
Link to Bethel Branch As -Built drawings are on RIBITs, under the As -Built Baseline Monitoring Report:
https://rib its. usace. a rmy. m i I/ri bits_a pex/f? p=107:278:7732436498762:: N O: R P, 278: P278_BAN K_I D:4458
Please select the arrow beside As -Built Baseline Monitoring Report and select Bethel Branch Monitoring Report and
Appendices.
Thank you,
Sam
Samantha Dailey
Regulatory Project Manager
U.S. Army Corps of Engineers
Regulatory Division
3331 Heritage Trade Drive, Suite 105
Wake Forest, NC 27587
(919) 554-4884, Ext. 22
Samantha.j.dailey@usace.army.mil