Loading...
HomeMy WebLinkAbout20190189 Ver 1_SW Letter of Approval with Modifications_20190805• Buncombe County Planning and Development Nathan Pennington, CFM C'J(rnning Dire00), LETTER OF APPROVAL WITH MODIFICATIONS August 5, 2019 Vladimir Grebenyuk Lance Road Holdings, LLC 102 Hillcrest Drive Candler, NC 28715 Dear Mr. Grebenyulc, NOTICE —This is not a permit This office has reviewed the revised Stormwater Plan submitted for the project listed below. We find the revised plan to be acceptable with the attached modifications and/or performance reservations and hereby issue this Letter of Approval. The Buncombe County Stormwater Management Ordinance is a performance oriented program requiring protection of the natural resources and adjoining properties. If, following commencement of this project, it is determined that the plan is inadequate, this office may require revisions to the plan and its implementation. The approval of a stormwater plan is conditioned on the applicant's compliance with federal and state water quality laws, regulations, and rules. All other applicable county permits and reviews must be completed prior to issuance of the stormwater permit and the beginning any land disturbing activity. The approval of the stormwater permit shall require an enforceable restriction on property usage that runs with the land, such as recorded deed restrictions or protective covenants, to ensure that future development and redevelopment maintains the site consistent with the approved project plans. This letter gives the notice required by Chapter 26, Environment, Article VII, Division 2, Section 26-322, (j)(1) of our right of periodic inspection to insure compliance with the approved plan. This approval shall become null and void if you have not made progress on the site within six months after the date of approval. A six month extension can be granted for good cause Vladimir Grebenyuk Page 2 of 2 shown upon receiving a written request from you before the expiration of the approved plan. We look forward to working with you on this project. Sincerely, Px4 �hozrrloczr� Mike Goodson, PE, CPESC Stormwater Administrator Cc: Advantage Civil Engineering Buncombe County Erosion Control encl. MODIFICATIONS FOR APPROVAL Project name: Lance Road Subdivision ProjectNo.: STW201&00059 Location: Ledbetter Road Date received: July 19, 2019 (Revision) Date approved: August 5, 2019 Person financially responsible: Vladimir Grebenyuk 1. A bypass pipe for each stormtech chamber system must be designed by the engineer of record and constructed to provide protection from sedimentation during construction. 2. A revised bond amount is pending the revised engineers cost estimate.