Loading...
HomeMy WebLinkAbout20191084 Ver 1_Culvert Info_20190819Carpenter, Kristi From: Murray, Christopher A Sent: Monday, August 19, 2019 11:21 AM To: Ridings, Rob Cc: Montague, Heather W Subject: Warren Bridge 135 over Fishing Creek (17BP.5.R.88) E• I am following up with some information regarding the structure recommendation for Warren Bridge 135 over Fishing Creek (17BP.5.R.88): -Early on, the PEF design firm and geotechnical unit indicated concern with a typical bridge replacement structure at this location. There were concerns with typical end bend construction/maintenance/stability of a proposed replacement bridge structure with the frequency of pressure flows and velocities. -Discussion with the geotechnical unit indicated that a bridge abutment would have to be a massive vertical concrete abutment due to the pressure flows and velocities. The incised drainage in this valley would put significant pressure on the abutment. -Additional discussions with the hydraulic unit indicated concern about lift of a bridge during flooding events. -All the concerns at the site led the Department proposing to use a concrete bottomless arch structure that will be anchored into the bedrock as the replacement structure. The following screen shots depict the proposed structure: 01 .or,sT. -T. a kAC..ILL I:;M::pST (.-;I C;.ST-IN-'LACE HEADWkLL — raE_ a' T em U-ST-EN_PL;.CE WING ITIP.: �w AST-Ih-PLACE= FCOTIh`.a ;TYP.i END ELE�'dr-tiTI0N ;TrP. PREcbST CH Z:AsT-IF,-FLACE WINC.WALL CR THREE-SIDEC LAST -IN -PLACE CULVERT UNIT FOOTING 3- TNOH-5-COMAELE ROCK KE'rE-J FOOTING C-ET4IL SIDES OF ALL FOOTI4G5 SHALL BE IN CGNTbGT WITH NCv-!z: �::.HAHLE KULK FOR FdINIMi V OIUE%',Inn W-WN -You may be aware that the federally protected Atlantic pigtoe is present at the site. This presented a significant hurdle to overcome, involving long discussions and an on site meeting with Gary Jordan and Travis Wilson to present our concerns that a standard bridge replacement structure would not work at the site. Please call if you need additional information. Chris Christopher A. Murray, PWS Project Engineer for Planning and Environmental Studies Project Delivery Unit Division 5 (919) 220-4633 office camurrayancdot.gov NCDOT-Division 5 2612 N. Duke Street Courier: 17-27-03 Durham, NC 27704 Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.